LEGALDIGMLEGALDIGM
    Back to legal database
    UK
    uk
    2024

    The Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024

    UK Statutory Instrument

    2024 No. 446 Infrastructure Planning The Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024 Made 27th March 2024 Coming into force 28th March 2024 An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008 , to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change to the Immingham Open Cycle Gas Turbine Order 2020 . The Secretary of State, having considered the application, the responses to the publicity and consultation required by regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make the changes on terms that in the opinion of the Secretary of State are not materially different from those proposed in the application. Accordingly, the Secretary of State, in exercise of the powers in paragraphs 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order— Citation and commencement 1 This Order may be cited as the Immingham Open Cycle Gas Turbine (Amendment) (No. 2) Order 2024 and comes into force on 28th March 2024. Amendment to the Immingham Open Cycle Gas Turbine Order 2020 2 The Immingham Open Cycle Gas Turbine Order 2020 is amended in accordance with this Order. Amendment to Schedule 12 (design parameters) 3 For the table in Schedule 12, substitute— Table 9 (1) Building or structure (2) Maximum length (metres) (3) Maximum width (metres) (4) Maximum height (metres above 0 meters above ordnance datum) (5) Maximum diameter (metres) Single gas turbine and generator 31 20 20 - Gas turbine building 50 35 29 - Exhaust stack - - 56 12 Air intakes 24 16 40 - Fin-fan cooler 30 15 17 - Control room, workshops, stores 35 20 16 - Demineralised tank, firewater tank - - 32 24 Signed by authority of the Secretary of State for Energy Security and Net Zero David Wagstaff Deputy Director – Energy Infrastructure Planning Department for Energy Security and Net Zero 27th March 2024 EXPLANATORY NOTE (This note is not part of the Order) This Order amends the Immingham Open Cycle Gas Turbine Order 2020, a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008.

    Related guides, FAQ and contract templates