LEGALDIGMLEGALDIGM
    Back to legal database
    UK
    uk
    2025

    The Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Dogger Bank A) Order 2025

    UK Statutory Instrument

    2025 No. 27 Electricity The Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Dogger Bank A) Order 2025 Made 9th January2025 Laid before Parliament 15th January 2025 Coming into force 10th February 2025 The Secretary of State makes the following Order in exercise of the powers conferred by section 5(1) and (6)(b) of the Electricity Act 1989 . The Secretary of State has given notice of the proposal to make this Order in accordance with section 5(2) and (3) of that Act and has consulted with the Scottish Ministers , and has considered any representations made. Citation, commencement, extent and application 1 1 This Order may be cited as the Electricity (Individual Exemption from the Requirement for a Transmission Licence) (Dogger Bank A) Order 2025 and comes into force on 10th February 2025. 2 This Order extends to England and Wales and Scotland. Exemption from section 4(1)(b) of the Electricity Act 1989 2 1 The Secretary of State grants exemption from section 4(1)(b) of the Electricity Act 1989 (prohibition on unlicensed transmission of electricity for supply) to Doggerbank Offshore Wind Farm Project 1 Projco Limited in respect of transmission taking place over the transmission system connected to the Dogger Bank A Offshore Wind Farm. 2 The exemption in paragraph (1) applies for the period beginning with 10th February 2025 and ending with the earlier of— a the day after the day on which the transmission system connected to Dogger Bank A Offshore Wind Farm is transferred to a successful bidder ; b 18th December 2026 . 3 In this article— “ Dogger Bank A Offshore Wind Farm ” means the generating station located approximately 100 kilometres from the shore, in the North Sea and off the Yorkshire coast, its coordinates at its central point being Latitude 54° 46.995 and Longitude 1° 51.268; “ Doggerbank Offshore Wind Farm Project 1 Projco Limited ” means Doggerbank Offshore Wind Farm Project 1 Projco Limited, a company registered in England and Wales with the company number 07791991. Michael Shanks Parliamentary Under Secretary of State Department for Energy Security and Net Zero 9th January 2025 EXPLANATORY NOTE (This note is not part of the Order) This Order grants exemption from the requirement to hold an electricity transmission licence. Section 4(1)(b) of the Electricity Act 1989 (c. 29) prohibits the transmission of electricity for supply without a licence. The Secretary of State, exercising the powers under section 5(1) of that Act, grants a time limited exemption from the requirement to hold a transmission licence to Doggerbank Offshore Wind Farm Project 1 Projco Limited in respect of the Dogger Bank A Offshore Wind Farm. A full impact assessment has not been produced for this instrument as it is a temporary measure. No, or no significant, impact on the private, voluntary or public sector is foreseen. An Explanatory Memorandum has been prepared and is available alongside this instrument at www.legislation.gov.uk .

    Related guides, FAQ and contract templates