The Cleve Hill Solar Park Order 2020
UK Statutory Instrument
2020 No. 547
Infrastructure Planning
The Cleve Hill Solar Park Order 2020
Made
28th May 2020
Coming into force
19th June 2020
An application has been made to the Secretary of State for an Order
under section 37 of the Planning Act 2008 (“ the 2008 Act ”) ;
The application was examined by the Examining Authority, which has
made a report to the Secretary of State under section 74(2) of the 2008
Act;
The Examining Authority, having considered the application together
with the documents that accompanied it, and the representations made and
not withdrawn, has, in accordance with section 74 of the 2008 Act made a
report and recommendation to the Secretary of State;
The Secretary of State has considered the report and recommendation of
the Examining Authority, has taken into account the environmental
information in accordance with regulation 4 of the Infrastructure
Planning (Environmental Impact Assessment) Regulations 2017 and has had regard to the documents and matters
referred to in section 105(2) of the 2008 Act;
The Secretary of State, having decided the application, has determined
to make an Order giving effect to the proposals comprised in the
application on the terms that in the opinion of the Secretary of State
are not materially different from those proposed in the
application.
The Secretary of State is satisfied that open space within the Order
land, when burdened with any new rights authorised for compulsory
acquisition under the terms of this Order, will be no less advantageous
than it was before such acquisition, to the persons whom it is vested,
other persons, if any, entitled to rights of common or other rights, and
the public, and that, accordingly, section 132(3) of the 2008 Act
applies.
The Secretary of State, in exercise of the powers conferred by
sections 114, 120, 122 and 123 of the 2008 Act makes the following
Order—
PART 1
PRELIMINARY
Citation and commencement
1
This Order may be cited as the Cleve Hill Solar Park Order and
comes into force on 19th June 2020
Interpretation
2
1
In this Order—
“ the 1961 Act ” means the Land Compensation Act
1961 ;
“ the 1965 Act ” means the Compulsory Purchase
Act 1965 ;
“ the 1980 Act ” means the Highways Act
1980 ;
“ the 1981 Act ” means the Compulsory Purchase
(Vesting Declarations) Act 1981 ;
“ the 1989 Act ” means the Electricity Act
1989 ;
“ the 1990 Act ” means the Town and Country
Planning Act 1990 ;
“ the 1991 Act ” means the New Roads and Street
Works Act 1991 ;
“ the 2004 Act ” means the Energy Act
2004 ;
“ the 2008 Act ” means the Planning Act
2008 ;
“ the 2009 Act ” means the Marine and Coastal
Access Act 2009 ;
“ authorised development ” means the development
and associated development described in Part 1 of
Schedule 1;
“ the book of reference ” means the book of
reference certified by the Secretary of State as
the book of reference for the purposes of the
Order under article 34 (certification of plans and
documents, etc.);
“ cable circuits ” means an electrical conductor
necessary to transmit electricity between two
points within the authorised development and may
include one or more auxiliary cables for the
purpose of gathering monitoring data;
“ cable systems ” means an electrical conductor
comprising a single 400 kilovolt circuit with
three conducting cores or similar equivalent
design;
“ CCTV ” means a closed circuit television
security system;
“commence”, means, (a) in relation to works
seaward of MHWS, the first carrying out of any
licensed marine activities authorised by the
deemed marine licence, save for pre-construction
monitoring surveys approved under the deemed
marine licence and (b) in respect of any other
works comprised in the authorised development,
save for site preparation works, the first
carrying out of any material operation (as defined
in section 155 of the 2008 Act) forming part of
the authorised development and the words
“ commencement ” and “ commenced ” must be construed
accordingly;
“ construction compound ” means a compound
including central offices, welfare facilities,
accommodation facilities, and storage for
construction of the authorised development;
“ energy storage ” means equipment used for the
storage of electrical energy;
“ environmental statement ” means the document
certified as the environmental statement by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.) as supplemented by the documents
set out in Schedule 10;
“ existing access road ” means the existing
access road between the existing substation and
Seasalter Road;
“ existing flood defence ” means the existing
bund and integrated infrastructure located beneath
the path known as the Saxon Shore Way and on the
north and west boundaries of the authorised
development in Work No. 9;
“ existing overhead line ” means an 11kilovolt
overhead line owned and operated by UK Power
Networks plc located to the south west of Cleve
Hill within the Order limits;
“ existing substation ” means the existing
substation at Cleve Hill Faversham ME13 9EF owned
and operated by National Grid Electricity
Transmission plc;
“highway” and “highway authority” have the
same meaning as in the 1980 Act ;
“ inverter ” means electrical equipment fitted
to mounting structures required to convert direct
current power generated by the solar modules to
alternating current;
“ land plan ” means the plan or plans certified
as the land plan or plans by the Secretary of
State for the purposes of this Order under article
34 (certification of plans and documents,
etc.);
“the location, order limits and grid
coordinates plan” means the plan certified as the
location, order limits and grid coordinates plan
by the Secretary of State for the purposes of this
Order under article 34 (certification of plans and
documents, etc.);
“ maintain ” includes inspect, upkeep, repair,
adjust, alter, remove, reconstruct and replace to
the extent assessed in the environmental
statement; and “maintenance” must be construed
accordingly;
“ MHWS ” means the highest level which spring
tides reach on average over a period of
time;
“ MMO ” means the Marine Management
Organisation, Lancaster House. Hampshire Court.
Newcastle upon Tyne, NE4 7YH;
“ mounting structure ” means a frame or rack
made of galvanised steel or other material
designed to support the solar modules and
inverters and mounted in piles driven into the
ground;
“ the Order land ” means the land shown on the
land plans which is within the limits of land to
be acquired or used and described in the book of
reference;
“ the Order limits ” means the limits shown on
the land plans and works plan within which the
authorised development may be carried out and land
acquired or used;
“ outline battery safety management plan ” means
the document certified as the outline battery
safety management plan by the Secretary of State
for the purposes of this Order under article 34
(certification of plans and documents, etc.) and
which sets out the battery safety management
principles to be included in the battery safety
management plan pursuant to Requirement 3 of
Schedule 1, Part 2;
“outline construction environmental management
plan” means the document certified as the outline
construction environmental management plan by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.);
“outline decommissioning and restoration plan”
means the document certified as the outline
decommissioning and restoration plan by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.);
“ outline design principles ” means the document
certified as the outline design principles by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.);
“ outline ecological management plan ” means the
document certified as the outline ecological
management plan by the Secretary of State for the
purposes of this Order under article
34 (certification of
plans and documents, etc.);
“outline landscape and biodiversity management
plan” means the document certified as the outline
landscape and biodiversity management plan by the
Secretary of State for the purposes of this Order
under article (certification of plans and
documents, etc.);
“outline skills, supply chain and employment
plan” means the document certified as the outline
skills, supply chain and employment plan by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.);
“outline special protection area construction
noise management plan” means the document
certified as the outline special protection area
construction noise management plan by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.);
“outline written scheme of investigation”
means the document certified as the outline
written scheme of investigation by the Secretary
of State for the purposes of this Order under
article 34 (certification of plans and documents,
etc.);
“ permissive paths ” means new access tracks
providing restricted public access within the
Order limits along the route shown on the rights
of way plan;
“ relevant planning authority ” means the
planning authority for the area to which the
provision relates;
“ requirements ” means those matters set out in
Part 2 of Schedule 1 (requirements) to this
Order;
“ rights of way plan ” means the plan certified
as the rights of way plan by the Secretary of
State for the purposes of this Order under article
34 (certification of plans and documents,
etc.);
“ site preparation works ” means operations
consisting of pre-construction surveys and/or
monitoring, site clearance, demolition work,
archaeological investigations, environmental
surveys, investigations for the purpose of
assessing ground conditions, remedial work in
respect of any contamination or other adverse
ground conditions, diversion and laying of
services, erection of any temporary means of
enclosure, the temporary display of site notices
or advertisements;
“ solar module ” means a solar photovoltaic
panel designed to convert solar irradiance to
electrical energy fitted to mounting
structures;
“ street ” means a street within the meaning of
section 48 of the 1991 Act, together with land on
the verge of a street or between two carriageways,
and includes part of a street;
“ streets and access plan ” means the plan
certified as the streets and access plan by the
Secretary of State for the purposes of this Order
under article 34 (certification of plans and
documents, etc.);
“ street authority ”, in relation to a street,
has the same meaning as in Part 3 of the 1991
Act ;
“ substation ” means a compound, containing
electrical equipment required to switch,
transform, convert electricity and provide
reactive power compensation, with welfare
facilities, external landscaping and means of
access;
“ transformer ” means a structure containing
electrical switch gear serving to transform
electricity generated by the solar modules to a
higher voltage;
“ undertaker ” means Cleve Hill Solar Park
Limited (company number 08904850);
“ watercourse ” has the meaning given in the
Land Drainage Act 1991 ;
and
“ works plan ” means the plan certified as the
works plan by the Secretary of State for the
purposes of the Order under article 34
(certification of plans and documents,
etc.).
2
References in this Order to rights over land include
references to rights to do or restrain or to place and
maintain, anything in, on or under land or in the air-space
above its surface and references in this Order to the
imposition of restrictive covenants are references to the
creation of rights over the land which interfere with the
interests or rights of another and are for the benefit of
land which is acquired under this Order or which is an
interest otherwise comprised in the Order land .
3
All distances, directions, capacities and lengths referred
to in this Order are approximate and distances between
points on a work comprised in the authorised development are
to be taken to be measured along that work.
4
Any reference in this Order to a work identified by the
number of the work is to be construed as a reference to the
work of that number authorised by this Order.
5
Unless otherwise stated, references in this Order to
points identified by letters are to be construed as
references to the points so lettered on the works
plan.
6
The expression “ includes ” is to be construed without
limitation unless the contrary intention appears.
PART 2
PRINCIPAL POWERS
Development consent etc. granted by this Order
3
1
Subject to the provisions of this Order and the
requirements the undertaker is granted development consent
for the authorised development to be carried out within the
Order limits.
2
Each numbered work must be situated within the
corresponding numbered area shown on the works plan.
Power to maintain authorised development
4
1
The undertaker may at any time maintain the authorised
development, except to the extent that this Order or an
agreement made under this Order provides otherwise.
2
The power to maintain conferred under paragraph
(1) does not
relieve the undertaker of any requirement to obtain any
further licence under Part 4 (marine licensing) of the 2009
Act for offshore works not covered by the deemed marine
licence.
3
This article only authorises the carrying out of
maintenance works within the Order limits.
Consent to transfer benefit of Order
5
1
Except as otherwise provided in this Order, the provisions
of this Order have effect solely for the benefit of the
undertaker.
2
Subject to paragraph (4), the undertaker may with the
written consent of the Secretary of State—
a
transfer to another person (“ the transferee ”) any
or all of the benefit of the provisions of this
Order (including the deemed marine licence, in whole
or in part) and such related statutory rights as may
be agreed between the undertaker and the transferee;
and
b
grant to another person (“ the lessee ”) for a
period agreed between the undertaker and the lessee
any or all of the benefit of the provisions of this
Order (including the deemed marine licences, in
whole or in part) and such related statutory rights
as may be so agreed,
except where paragraph (7) applies, in which case no
consent of the Secretary of State is required.
3
Where an agreement has been made in accordance with
paragraph (2) references in this Order to the undertaker,
except in paragraphs (6) and (8), are to include references
to the transferee or lessee.
4
The undertaker must consult the Secretary of State before
making an application for consent under this article by
giving notice in writing of the proposed application.
5
The Secretary of State must consult the MMO before giving
consent to the transfer or grant to another person of the
whole or part of the benefit of the provisions of the deemed
marine licence.
6
Where the undertaker has transferred any benefit, or for
the duration of any period during which the undertaker has
granted any benefit, under paragraph (2)—
a
the benefit transferred or granted (“the
transferred benefit”) must include any rights that
are conferred, and any obligations that are imposed,
by virtue of the provisions to which the benefit
relates;
b
the transferred benefit will reside exclusively
with the transferee or, as the case may be, the
lessee and the transferred benefit will not be
enforceable against the undertaker; and
c
the exercise by a person of any benefits or rights
conferred in accordance with any transfer or grant
under paragraph (2) is subject to the same
restrictions, liabilities and obligations as would
apply under this Order if those benefits or rights
were exercised by the undertaker.
7
This paragraph applies to any provisions of this Order and
its related statutory rights where—
a
the transferee or lessee is the holder of a
licence under section 6 (licences authorising supply
etc) of the 1989 Act; or
b
the time limits for claims for compensation in
respect of the acquisition of land or effects upon
land under this Order have elapsed and—
i
no such claims have been made;
ii
any such claim has been made and has been
compromised or withdrawn;
iii
compensation has been paid in final
settlement of any such claim;
iv
payment of compensation into court has taken
place in lieu of settlement of any such claim;
or
v
it has been determined by a tribunal or
court of competent jurisdiction in respect of any
such claim that no compensation will be
payable.
8
Prior to any transfer or grant under this article taking
effect the undertaker must give notice in writing to the
Secretary of State and National Grid Electricity
Transmission PLC, and if such transfer or grant relates to
the exercise of powers in their area, to the MMO and the
relevant planning authority.
9
The notice required under paragraphs and (8) must—
a
state—
i
the name and contact details of the person
to whom the benefit of the provisions will be
transferred or granted;
ii
subject to paragraph (10), the date on which
the transfer will take effect;
iii
the provisions to be transferred or
granted;
iv
the restrictions, liabilities and
obligations that, in accordance with paragraph
(6)(c), will apply to the person exercising the
powers transferred or granted; and
v
where paragraph (7) does not apply,
confirmation of the availability and adequacy of
funds for compensation associated with the
compulsory acquisition of the Order land;
and
b
be accompanied by—
i
where relevant, a plan showing the works or
areas to which the transfer or grant relates;
and
ii
a copy of the document effecting the
transfer or grant signed by the undertaker and the
person to whom the benefit of the powers will be
transferred or granted.
10
The date specified under paragraph (9)(a)(ii) in respect
of a notice served in respect of paragraph (8) must not be
earlier than the expiry of five days from the date of the
receipt of the notice.
11
The notice given under paragraph (8) must be signed by the
undertaker and the person to whom the benefit of the powers
will be transferred or granted as specified in that
notice.
12
Sections 72(7) and (8) (variation, suspension, reservation
and transfer) of the 2009 Act do not apply to a transfer or
grant of the whole or part of the benefit of the provisions
of the deemed marine licences to another person by the
undertaker pursuant to an agreement under paragraph (2) .
13
The provisions of articles 8 (street works), 10 (temporary
stopping up of streets), 16 (compulsory acquisition of
land), 18 (compulsory acquisition of rights), 24 (temporary
use of land for carrying out the authorised development) and
(temporary
use of land for maintaining the authorised development) are
to have effect only for the benefit of the named undertaker
and a person who is a transferee or lessee who is
also—
a
in respect of Work Nos. 1 to 9 a person who holds
a licence under the 1989 Act; or
b
in respect of functions under Article 8 (street works) relating to street, a street
authority.
Application and modification of legislative provisions
6
The provisions of the Neighbourhood Planning Act 2017 insofar as they relate to temporary possession of
land under articles 24 (temporary use of land for carrying out the
authorised development) and 25 (temporary use of land for
maintaining the authorised development) of this Order do not apply
in relation to the construction of any work or the carrying out of
any operation required for the purpose of, or in connection with,
the construction, operation or maintenance of any part of the
authorised development.
Defence to proceedings in respect of statutory nuisance
7
1
Where proceedings are brought under section 82(1) (summary
proceedings by a person aggrieved by statutory nuisance) of
the Environmental Protection Act 1990 in relation to a nuisance falling within
paragraph (g) of section 79(1) (noise emitted from premises
so as to be prejudicial to health or a nuisance) of that Act
no order may be made, and no fine may be imposed, under
section 82(2) of that Act if—
a
the defendant shows that the nuisance—
i
relates to premises used by the undertaker
for the purposes of or in connection with the
construction or maintenance of the authorised
development and that the nuisance is attributable
to the carrying out of the authorised development
in accordance with a notice served under section
60 (control of noise on construction site), or a
consent given under section 61 (prior consent for
work on construction site) or 65 (noise exceeding
registered level), of the Control of Pollution Act
1974 ; or
ii
is a consequence of the construction or
maintenance of the authorised development and that
it cannot reasonably be avoided; or
b
the defendant shows that the nuisance is a consequence of the use of the authorised
development and that it cannot reasonably be
avoided.
2
Section 61(9) (consent for work on construction site to
include statement that it does not of itself constitute a
defence to proceedings under section 82 of the Environmental
Protection Act 1990) of the Control of Pollution Act 1974
and section 65(8) of that Act (corresponding provision in
relation to consent for registered noise level to be
exceed), do not apply where the consent relates to the use
of premises by the undertaker for purposes of, or, in
connection with, the construction or maintenance of the
authorised development.
PART 3
STREETS
Street works
8
1
The undertaker may, for the purposes of the authorised
development, enter on so much of any of the streets
specified in Schedule 2 (Streets subject to street works) as
is within the Order limits and may—
a
break up or open the street, or any sewer, drain
or tunnel under it;
b
drill, tunnel or bore under the street;
c
place and keep apparatus under the street;
d
maintain apparatus in the street, change its
position or remove it;
e
repair, replace or otherwise alter the surface or
structure of it; and
f
execute any works required for or incidental to
any works referred to in sub-paragraphs
to
.
2
The authority given by paragraph (1) is a statutory right for
the purposes of sections 48(3) (streets, street works and
undertakers) and 51(1) (prohibition of unauthorised street
works) of the 1991 Act.
3
In this article “ apparatus ” has the same meaning as in
Part 3 of the 1991 Act.
Application of the 1991 Act
9
1
The provisions of the 1991 Act mentioned in paragraph
that apply
in relation to the carrying out of street works under that
Act and any regulations made or code of practice issued or
approved under those provisions apply (with all necessary
modifications) in relation to—
a
the carrying out of works under article 0 (street
works); and
b
the temporary stopping up, temporary alteration or
temporary diversion of a street by the undertaker
under article 11 (temporary stopping up of
streets),
whether or not the carrying out of the works or the
stopping up, alteration or diversion constitutes street
works within the meaning of that Act.
2
The provisions of the 1991 Act
are—
a
subject to paragraph , section 55 (notice of
starting date of works);
b
section 57 (notice of emergency works);
c
section 60 (general duty of undertakers to
co-operate);
d
section 68 (facilities to be afforded to street
authority);
e
section 69 (works likely to affect other apparatus
in the street);
f
section 76 (liability for cost of temporary
traffic regulation);
g
section 77 (liability for cost of use of
alternative route); and
h
all provisions of that Act that apply for the
purposes of the provisions referred to in
sub-paragraphs to .
3
Section 55 of the 1991 Act as applied by paragraph
has effect
as if references in section 57 of that Act to emergency
works included a reference to a stopping up, alteration or
diversion (as the case may be) required in a case of
emergency.
Temporary stopping up of streets
10
1
The undertaker, during and for the purposes of carrying
out the authorised development, may temporarily stop up,
alter or divert any street and may for any reasonable
time—
a
divert the traffic or a class of traffic from the
street; and
b
subject to paragraph , prevent all persons from
passing along the street.
2
Without limiting paragraph (1), the undertaker may use any street
temporarily stopped up under the powers conferred by this
article within the Order limits as a temporary working
site.
3
The undertaker must provide reasonable access for
pedestrians going to or from premises abutting a street
affected by the temporary stopping up, alteration or
diversion of a street under this article if there would
otherwise be no such access.
4
Without limiting paragraph (1), the undertaker may temporarily stop
up, alter or divert the streets set out in column (2) of
Schedule 3 (streets to be temporarily stopped up) to the
extent specified, by reference to the letters and numbers
shown on the streets and access plan, in column (3) of that
Schedule.
5
The undertaker must not temporarily stop up, alter, divert
or use as a temporary working site—
a
any street referred to in paragraph without first
consulting the street authority; and
b
any other street without the consent of the street
authority, which may attach reasonable conditions to
the consent.
6
Any person who suffers loss by the suspension of any
private right of way under this article is entitled to
compensation to be determined, in case of dispute, under
Part 1 (determination of questions of disputed compensation)
of the 1961 Act.
7
If a street authority fails to notify the undertaker of
its decision within 28 days of receiving an application for
consent under paragraph that street authority is deemed
to have granted consent.
Temporary stopping up of public rights of way
11
The undertaker may, in connection with the carrying out of the
authorised development, temporarily stop up each of the public
rights of way specified in column (2) of Schedule 4 (public rights
of way to be temporarily stopped up) to the extent specified in
column (3), by reference to the letters shown on the rights of way
plan.
Agreements with street authorities
12
1
A street authority and the undertaker may enter into
agreements with respect to—
a
any temporary stopping up, alteration or diversion
of a street authorised by this Order; or
b
the carrying out in the street of any of the works
referred to in article 8(1) (street works).
2
Such agreement may, without prejudice to the generality of
paragraph (1)—
a
make provision for the street authority to carry
out any function under this Order which relates to
the street in question;
b
include an agreement between the undertaker and
street authority specifying a reasonable time for
the completion of the works; and
c
contain such terms as to payment and otherwise as
the parties consider appropriate.
PART 4
SUPPLEMENTAL POWERS
Discharge of water
13
1
The undertaker may use any watercourse or any public sewer
or drain for the drainage of water in connection with the
carrying out or maintenance of the authorised development
and for that purpose may lay down, take up and alter pipes
and may, on any land within the Order limits, make openings
into, and connections with, the watercourse, public sewer or
drain subject to the obtaining of consent and approval
respectively pursuant to paragraphs and below.
2
Any dispute arising from the making of connections to or
the use of a public sewer or drain by the undertaker
pursuant to paragraph (1) is determined as if it were a
dispute under section 106 (right to communicate with public
sewers)of the Water Industry Act 1991 (right to communicate with public
sewers).
3
The undertaker must not discharge any water into any
watercourse, public sewer or drain except with the consent
of the person to whom it belongs; and such consent may be
given subject to such terms and conditions as that person
may reasonably impose, but must not be unreasonably
withheld.
4
The undertaker must not carry out any works to or make any
opening into any public sewer or drain pursuant to article
13(1) except—
a
in accordance with plans approved by the person to
whom the sewer or drain belongs, but such approval
must not be unreasonably withheld; and
b
where that person has been given the opportunity
to supervise the making of the opening.
5
The undertaker must not, in carrying out or maintaining
works pursuant to this article damage or interfere with the
bed or banks of any watercourse forming part of a main
river.
6
The undertaker must take such steps as are reasonably
practicable to secure that any water discharged into a
watercourse or public sewer or drain pursuant to this
article is as free as may be practicable from gravel, soil
or other solid substance, oil or matter in
suspension.
7
This article does not authorise the entry into controlled
waters of any matter whose entry or discharge into
controlled waters is prohibited by regulation 12
(requirement for environmental permit) of the Environmental
Permitting (England and Wales) Regulations 2016 .
8
In this article—
a
“ public sewer or drain ” means a sewer or drain
which belongs to a sewerage undertaker, the
Environment Agency, an internal drainage board or a
local authority; and
b
other expressions, excluding watercourse, used
both in this article and in the Environmental
Permitting (England and Wales) Regulations 2016 have
the same meaning as in those Regulations.
9
If a person who receives an application for consent or
approval fails to notify the undertaker of a decision within
28 days of receiving an application for consent under
paragraph or
approval under paragraph that person is deemed to have
granted consent or given approval, as the case may
be.
Protective work to buildings
14
1
Subject to the following provisions of this article, the
undertaker may at its own expense carry out such protective
works to any building located within the Order limits as the
undertaker considers necessary or expedient.
2
Protective works may be carried out—
a
at any time before or during the construction of
any part of the authorised development in the
vicinity of the building; or
b
after the completion of that part of the
authorised development in the vicinity of the
building at any time up to the end of the period of
five years beginning with the day on which that part
of the authorised development is first opened for
use.
3
For the purpose of determining how the powers under this
article are to be exercised, the undertaker may enter and
survey any building falling within paragraph (1) and any land within its
curtilage.
4
For the purpose of carrying out protective works under
this article to a building, the undertaker may (subject to
paragraphs and
)—
a
enter the building and any land within its
curtilage; and
b
where the works cannot be carried out reasonably
conveniently without entering land that is adjacent
to the building but outside its curtilage, enter the
adjacent land (but not any building erected on it)
within the Order limits.
5
Before exercising—
a
a power under paragraph (1) to carry out protective works
to a building;
b
a power under paragraph to enter a building and land
within its curtilage;
c
a power under paragraph to enter a building and
land within its curtilage; or
d
a power under paragraph to enter land,
the undertaker must, except in the case of emergency,
serve on the owners and occupiers of the building or land
not less than 14 days' notice of its intention to exercise
the power and, in a case falling within sub-paragraph
,
,
specifying the protective works proposed to be carried
out.
6
Where a notice is served under paragraph , or , the owner or occupier
of the building or land concerned may, by serving a
counter-notice within the period of 10 days beginning with
the day on which the notice was served, require the question
of whether it is necessary or expedient to carry out the
protective works or to enter the building or land to be
referred to arbitration under article 35
(arbitration).
7
The undertaker must compensate the owners and occupiers of
any building or land in relation to which powers under this
article have been exercised for any loss or damage arising
to them by reason of the exercise of the powers.
8
Where—
a
protective works are carried out under this
article to a building; and
b
within the period of five years beginning with the
day on which the part of the authorised development
carried out in the vicinity of the building is first
opened for use it appears that the protective works
are inadequate to protect the building against
damage caused by the construction, operation or
maintenance of that part of the authorised
development,
the undertaker must compensate the owners and occupiers of
the building for any loss or damage sustained by
them.
9
Nothing in this article relieves the undertaker from any
liability to pay compensation under section 152
(compensation in case where no right to claim in nuisance)
of the 2008 Act.
10
Any compensation payable under paragraph or must be determined, in
case of dispute, under Part 1 (determination of questions of
disputed compensation) of the 1961 Act.
11
In this article “ protective works ”, in relation to a
building, means—
a
underpinning, strengthening and any other works
the purpose of which is to prevent damage that may
be caused to the building by the construction,
operation, maintenance or use of the authorised
development; and
b
any works the purpose of which is to remedy any
damage that has been caused to the building by the
construction, operation, maintenance or use of the
authorised development.
Authority to survey and investigate the land
15
1
The undertaker may for the purposes of this Order enter on
any land shown within the Order limits or which may be
affected by the authorised development and—
a
survey or investigate the land;
b
without prejudice to the generality of
sub-paragraph , make trial holes in such
positions on the land as the undertaker thinks fit
to investigate the nature of the surface layer and
subsoil and remove soil samples;
c
without prejudice to the generality of
sub-paragraph , carry out ecological or
archaeological investigations on such land;
and
d
place on, leave on and remove from the land
apparatus for use in connection with the survey and
investigation of land and making of trial
holes.
2
No land may be entered or equipment placed or left on or
removed from the land under paragraph (1) unless at least 14 days'
notice has been served on every owner and occupier of the
land.
3
Any person entering land under this article on behalf of
the undertaker—
a
must, if so required on entering the land, produce
written evidence of their authority to do so;
and
b
may take with them such vehicles and equipment as
are necessary to carry out the survey or
investigation or to make the trial holes.
4
No trial holes may be made under this article—
a
in land held by or in right of the Crown without
the consent of the Crown;
b
in land located within the highway boundary
without the consent of the highway authority;
or
c
in a private street without the consent of the
street authority,
but such consent must not be unreasonably withheld.
5
The undertaker must compensate the owners and occupiers of
the land for any loss or damage arising by reason of the
exercise of the authority conferred by this article, such
compensation to be determined, in case of dispute, under
Part 1 (determination of questions of disputed compensation)
of the 1961 Act.
6
If either a highway authority or a street authority which
receives an application for consent fails to notify the
undertaker of its decision within 28 days of receiving the
application for consent—
a
under paragraph in the case of a highway
authority; or
b
under paragraph in the case of a street
authority,
that authority is deemed to have granted consent.
7
Section 13 (refusal to give possession to acquiring
authority) of the 1965 Act applies to the entry onto, or
possession of land under this article to the same extent as
it applies to the compulsory acquisition of land under this
Order by virtue of section 125 (application of compulsory
acquisition provisions) of the 2008 Act.
PART 5
POWERS OF ACQUISITION
Compulsory acquisition of land
16
1
The undertaker may acquire compulsorily so much of the
Order land as is required for the authorised development or
to facilitate, or is incidental, to it.
2
This article is subject to paragraph of article
18 (compulsory acquisition of rights) and article 24
(temporary use of land for carrying out the authorised
development).
Time limit for exercise of authority to acquire land compulsorily
17
1
After the end of the period of 5 years beginning on the
day on which this Order is made—
a
no notice to treat is to be served under Part 1
(compulsory purchase under Acquisition of Land Act
1946) of the 1965 Act; and
b
no declaration is to be executed under section 4
(execution of declaration) of the 1981 Act as
applied by article 20 (application of the 1981
Act).
2
The authority conferred by article 24 (temporary use of
land for carrying out the authorised development) ceases at
the end of the period referred to in paragraph (1), except that nothing in
this paragraph prevents the undertaker remaining in
possession of land after the end of that period, if the land
was entered and possession was taken before the end of that
period.
Compulsory acquisition of rights
18
1
Subject to paragraph , the undertaker may
acquire compulsorily such rights or impose restrictive
covenants over the Order land as may be required for any
purpose for which that land may be acquired under article 16
(compulsory acquisition of land), by creating them as well
as by acquiring rights already in existence.
2
Subject to the provisions of this paragraph, article 19
(private rights) and article 26 (statutory undertakers), in
the case of the Order land specified in column (1) of
Schedule 5 (land in which only new rights etc. may be
acquired) the undertaker's powers of compulsory acquisition
are limited to the acquisition of such new rights and the
imposition of restrictive covenants for the purpose
specified in relation to that land in column (2) of that
Schedule.
3
Subject to section 8 (other provisions as to divided land)
and Schedule 2A (counter-notice requiring purchase of land)
of the 1965 Act (as substituted by paragraph of Schedule 6
(modification of compensation and compulsory purchase
enactments for the creation of new rights and imposition of
new restrictive covenants), where the undertaker creates or
acquires an existing right over land or the benefit of a
restrictive covenant under paragraph (1) or (2), the
undertaker is not required to acquire a greater interest in
that land.
4
Schedule 6 (modification of compensation and compulsory
purchase enactments for creation of new rights and
imposition of new restrictive covenants) has effect for the
purpose of modifying the enactments relating to compensation
and the provisions of the 1965 Act in their application in
relation to the compulsory acquisition under this article of
a right over land by the creation of a new right or the
imposition of restrictive covenants.
5
In any case where the acquisition of new rights or
imposition of a restriction under paragraph (1) or is required
for the purpose of diverting, replacing or protecting
apparatus of a statutory undertaker, the undertaker may,
with the consent of the Secretary of State, transfer the
power to acquire such rights to the statutory undertaker in
question.
6
The exercise by a statutory undertaker of any power in
accordance with a transfer under paragraph is subject to the same
restrictions, liabilities and obligations as would apply
under this Order if that power were exercised by the
undertaker.
Private rights
19
1
Subject to the provisions of this article, all private
rights or restrictive covenants over land subject to
compulsory acquisition under article 16 (compulsory
acquisition of land) cease to have effect in so far as their
continuance would be inconsistent with the exercise of the
powers under article 16 (compulsory acquisition of
land)—
a
as from the date of acquisition of the land by the
undertaker, whether compulsorily or by agreement;
or
b
on the date of entry on the land by the undertaker
under section 11(1) (power of entry) of the 1965
Act,
whichever is the earliest.
2
Subject to the provisions of this article, all private
rights or restrictive covenants over land subject to the
compulsory acquisition of rights or the imposition of
restrictive covenants under article 18 (compulsory
acquisition of rights) cease to have effect in so far as
their continuance would be inconsistent with the exercise of
the right or compliance with the restrictive
covenant—
a
as from the date of the acquisition of the right
or the imposition of the restrictive covenant by the
undertaker (whether the right is acquired
compulsorily, by agreement or through the grant of
lease of the land by agreement); or
b
on the date of entry on the land by the undertaker
under section 11(1) of the 1965 Act (power of entry)
in pursuance of the right,
whichever is the earliest.
3
Subject to the provisions of this article, all private
rights or restrictive covenants over land of which the
undertaker takes temporary possession under this Order are
suspended and unenforceable, in so far as their continuance
would be inconsistent with the purpose for which temporary
possession is taken, for as long as the undertaker remains
in lawful possession of the land.
4
Any person who suffers loss by the extinguishment or
suspension of any private right or restrictive covenant
under this article is entitled to compensation in accordance
with the terms of section 152 of the 2008 Act to be
determined, in case of dispute, under Part 1 of the 1961
Act.
5
This article does not apply in relation to any right to
which section 138 (extinguishment of rights, and removal of
apparatus, of statutory undertakers etc.) of the 2008 Act or
article 26 (statutory undertakers) applies.
6
Paragraphs (1)
to have effect
subject to—
a
any notice given by the undertaker before—
i
the completion of the acquisition of the
land or the acquisition of rights or the
imposition of restrictive covenants over or
affecting the land;
ii
the undertaker's appropriation of the
land;
iii
the undertaker's entry onto the land;
or
iv
the undertaker's taking temporary possession
of the land,
that any or all of those paragraphs do not apply
to any right specified in the notice; or
b
any agreement made at any time between the
undertaker and the person in or to whom the right in
question is vested or belongs.
7
If an agreement referred to in paragraph —
a
is made with a person in or to whom the right is
vested or belongs; and
b
is expressed to have effect also for the benefit
of those deriving title from or under that
person,
the agreement is effective in respect of the persons so
deriving title, whether the title was derived before or
after the making of the agreement.
8
Reference in this article to private rights over land
includes reference to any trusts or incidents to which the
land is subject.
Application of the 1981 Act
20
1
The 1981 Act applies as if this Order were a compulsory
purchase order.
2
The 1981 Act, as applied by paragraph (1), has effect with the
following modifications.
3
In section 1 (application of Act), for subsection 2
substitute—
2
This section applies to any Minister, any
local or other public authority or any other body
or person authorised to acquire land by means of a
compulsory purchase order.
.
4
In section 5(2) (earliest date for execution of
declaration) omit the words from “and this subsection” to
the end.
5
Section 5A (time limit for general vesting declaration) is
omitted .
6
In section 5B(1) (extension of time limit during
challenge) for “section 23 (application to High Court in
respect of compulsory purchase order) of the Acquisition of
Land Act 1981, the three year period mentioned in section
5A” substitute “
section 118 (legal challenges relating to
applications for orders granting development consent) of the
2008 Act, the five year period mentioned in article 17 (time
limit for exercise of authority to acquire land
compulsorily) of the Cleve Hill Solar Park Order
2020.
” .
7
In section 6 (notices after execution of declaration), in
subsection (1)(b) for “section 15 of, or paragraph 6 of
Schedule 1 to, the Acquisition of Land Act 1981” substitute “
section 134 (notice of authorisation of compulsory
acquisition) of the Planning Act 2008
” .
8
In section 7 (constructive notice to treat), in subsection
(1)(a), omit the words “(as modified by section 4 of the
Acquisition of Land Act 1981)”.
9
In Schedule A1 (counter-notice requiring purchase of land
not in general vesting declaration), for paragraph 1(2)
substitute—
2
But see article 21(3) (acquisition of subsoil
only) of the Cleve Hill Solar Park Order 2020,
which excludes the acquisition of subsoil only
from this Schedule.
.
10
References to the 1965 Act in the 1981 Act must be
construed as references to the 1965 Act as applied by
section 125 (application of compulsory acquisition
provisions) of the 2008 Act (and as modified by article 22
(modification of Part 1 of the Compulsory Purchase Act 1965)
to the compulsory acquisition of land under this
Order.
Acquisition of subsoil only
21
1
The undertaker may acquire compulsorily so much of, or
such rights in, the subsoil of the land referred to in
paragraph (1) of
article 16 (compulsory acquisition of land) or article 18
(compulsory acquisition of rights) as may be required for
any purpose for which that land may be acquired under that
provision instead of acquiring the whole of the land.
2
Where the undertaker acquires any part of, or rights in,
the subsoil of land under paragraph (1), the undertaker is not
required to acquire an interest in any other part of the
land.
3
The following do not apply in connection with the exercise
of the power under paragraph (1) in relation to subsoil only—
a
Schedule 2A (counter-notice requiring purchase of
land not in notice to treat) to the 1965 Act;
b
Schedule A1 (counter-notice requiring purchase of
land not in general vesting declaration) to the 1981
Act; and
c
Section 153(4A) (blighted land: proposed
acquisition of part interest; material detriment
test) of the 1990 Act.
4
Paragraphs
and are to be
disregarded where the undertaker acquires a cellar, vault,
arch or other construction forming part of a house, building
or manufactory.
Modification of Part 1 of the Compulsory Purchase Act 1965
22
1
Part 1 (compulsory acquisition under Acquisition of Land
Act 1946) of the 1965 Act, as applied to this Order by
section 125 (application of compulsory acquisition
provisions) of the 2008 Act, is modified as follows.
2
In section 4A(1) (extension of time limit during
challenge)— for “section 23 of the Acquisition of Land Act 1981
(application to High Court in respect of compulsory purchase
order), the three year period mentioned in section 4”
substitute “
section 118 of the 2008 Act (legal challenges
relating to applications for orders granting development
consent), the five year period mentioned in article 17 (time
limit for exercise of authority to acquire land
compulsorily) of the Cleve Hill Solar Park Order
2020
” .
3
In section 11A (powers of entry: further notice of
entry)—
a
in subsection (1)(a), after “land” insert “
under
that provision
” ; and
b
in subsection (2), after “land” insert “
under that
provision
” .
4
In section 22(2) (expiry of time limit for exercise of
compulsory purchase power not to affect acquisition of
interests omitted from purchase), for “section 4 of this
Act” substitute “
article 17 (time limit for exercise of
authority to acquire land compulsorily) of the Cleve Hill
Solar Park Order 2020
” .
5
In Schedule 2A (counter-notice requiring purchase of land
not in notice to treat)—
a
for paragraphs 1(2) and 14(2) substitute—
2
But see article 21(3) (acquisition of
subsoil only) of the Cleve Hill Solar Park Order
2020, which excludes the acquisition of subsoil
only from this Schedule
; and
b
after paragraph 29 insert—
PART 4
INTERPRETATION
30
In this Schedule, references to entering on
and taking possession of land do not include doing
so under article 14 (protective works to
buildings), article 24 (temporary use of land for
carrying out the authorised development) or
article 25 (temporary use of land for maintaining
the authorised development) of the Cleve Hill
Solar Park Order 2020.
.
Rights under or over streets
23
1
The undertaker may enter on, appropriate and use so much
of the subsoil of or air-space over any street within the
Order limits as may be required for the purposes of the
authorised development and may use the subsoil or air-space
for those purposes or any other purpose ancillary to the
authorised development.
2
Subject to paragraph , the undertaker may exercise any
power conferred by paragraph (1) in relation to a street without
being required to acquire any part of the street or any
easement or right in the street.
3
Paragraph
does not apply in relation to—
a
any subway or underground building; or
b
any cellar, vault, arch or other construction in,
on or under a street which forms part of a building
fronting onto the street.
4
Subject to paragraph , any person who is an owner or
occupier of land appropriated under paragraph (1) without the undertaker
acquiring any part of that person's interest in the land,
and who suffers loss as a result, is entitled to
compensation to be determined, in case of dispute, under
Part 1 (determination of questions of disputed compensation)
of the 1961 Act.
5
Compensation is not payable under paragraph to any person who is an
undertaker to whom section 85 (sharing cost of necessary
measures) of the 1991 Act applies in respect of measures of
which the allowable costs are to be borne in accordance with
that section.
Temporary use of land for carrying out the authorised development
24
1
The undertaker may, in connection with the carrying out of
the authorised development—
a
enter on and take temporary possession of any of
the Order land in respect of which no notice of
entry has been served under section 11 (powers of
entry) of the 1965 Act (other than in connection with the acquisition of rights only) and no declaration has been
made under section 4 (execution of declaration) of
the 1981 Act;
b
remove any buildings, agricultural plant and
apparatus, drainage, fences, debris and vegetation
from that land;
c
construct temporary works, haul roads, security
fencing, bridges, structures and buildings on that
land;
d
use the land for the purposes of a temporary
working site with access to the working site in
connection with the authorised development;
e
construct any works, on that land as are mentioned
in Part 1 of Schedule 1 (authorised development);
and
f
carry out mitigation works required pursuant to
the requirements in Schedule 1.
2
Not less than 14 days before entering on and taking
temporary possession of land under this article the
undertaker must serve notice of the intended entry on the
owners and occupiers of the land.
3
The undertaker must not remain in possession of any land
under this article for longer than reasonably necessary and
in any event must not, without the agreement of the owners
of the land, remain in possession of any land under this
article after the end of the period of one year beginning
with the date of completion of the part of the authorised
development for which temporary possession of the land was
taken unless the undertaker has, before the end of that
period, served a notice of entry under section 11 of the
1965 Act or made a declaration under section 4 of the 1981
Act in relation to that land.
4
Unless the undertaker has served notice of entry under
section 11 of the 1965 Act or made a declaration under
section 4 of the 1981 Act or otherwise acquired the land or
rights over land subject to temporary possession, the
undertaker must before giving up possession of land of which
temporary possession has been taken under this article,
remove all works and restore the land to the reasonable
satisfaction of the owners of the land; but the undertaker
is not required to—
a
replace any building, structure, drain or electric
line removed under this article;
b
remove any drainage works installed by the
undertaker under this article;
c
remove any new road surface or other improvements
carried out under this article to any street
specified in Schedule 2 (streets subject to street
works); or
d
restore the land on which any works have been
carried out under paragraph
insofar as the works relate to mitigation works
identified in the environmental statement or
required pursuant to the requirements in Schedule
1.
5
The undertaker must pay compensation to the owners and
occupiers of land which temporary possession is taken under
this article for any loss or damage arising from the
exercise in relation to the land of the provisions of any
power conferred by this article.
6
Any dispute as to a person's entitlement to compensation
under paragraph , or as to the amount of the
compensation, must be determined under Part 1 (determination
of questions of disputed compensation) of the 1961
Act.
7
Nothing in this article affects any liability to pay
compensation under section 152 (compensation in case where
no right to claim in nuisance) of the 2008 Act or under any
other enactment in respect of loss or damage arising from
the carrying out of the authorised development, other than
loss or damage for which compensation is payable under
paragraph .
8
Where the undertaker takes possession of land under this
article, the undertaker is not required to acquire the land
or any interest in it.
9
Section 13 (refusal to give possession to acquiring
authority) of the 1965 Act applies to the temporary use of
land pursuant to this article to the same extent as it
applies to the compulsory acquisition of land under this
Order by virtue of section 125 (application of compulsory
acquisition provisions) of the 2008 Act.
Temporary use of land for maintaining authorised development
25
1
Subject to paragraph , at any time during the maintenance
period (as defined in paragraph (11)) relating to any part
of the authorised development, the undertaker may—
a
enter on and take temporary possession of any land
within the Order land if such possession is
reasonably required for the purpose of maintaining
the authorised development; and
b
construct such temporary works and buildings on
the land as may be reasonably necessary for that
purpose.
2
Paragraph (1)
does not authorise the undertaker to take temporary
possession of—
a
any house or garden belonging to a house;
or
b
any building (other than a house) if it is for the
time being occupied.
3
Not less than 28 days before entering on and taking
temporary possession of land under this article the
undertaker must serve notice of the intended entry on the
owners and occupiers of the land.
4
The undertaker may only remain in possession of land under
this article for so long as may be reasonably necessary to
carry out the maintenance of the part of the authorised
development for which possession of the land was
taken.
5
Before giving up possession of land of which temporary
possession has been taken under this article, the undertaker
must remove all temporary works and restore the land to the
reasonable satisfaction of the owners of the land.
6
The undertaker must pay compensation to the owners and
occupiers of land of which temporary possession is taken
under this article for any loss or damage arising from the
exercise in relation to the land of the provisions of this
article.
7
Any dispute as to a person's entitlement to compensation
under paragraph , or as to the amount of the
compensation, must be determined under Part 1 (determination
of questions of disputed compensation) of the 1961
Act.
8
Nothing in this article affects any liability to pay
compensation under section 152 of the 2008 Act (compensation
in case where no right to claim in nuisance) or under any
other enactment in respect of loss or damage arising from
the maintenance of the authorised development, other than
loss or damage for which compensation is payable under
paragraph .
9
Where the undertaker takes possession of land under this
article, the undertaker is not required to acquire the land
or any interest in it.
10
Section 13 (refusal to give possession to acquiring
authority) of the 1965 Act applies to the temporary use of
land pursuant to this article to the same extent as it
applies to the compulsory acquisition of land under this
Order by virtue of section 125 (application of compulsory
acquisition provisions) of the 2008 Act.
11
In this article “ the maintenance period ” means the period
of 5 years beginning with the date on which a phase of the
authorised development first exports electricity to the
national electricity transmission network.
Statutory undertakers
26
Subject to the provisions of Schedule 7 (protective provisions)
the undertaker may—
a
acquire compulsorily, or acquire new rights or impose
restrictive covenants over, the land belonging to statutory
undertakers shown on the land plan (as certified by the
Secretary of State in accordance with article 34) within the
Order land; and
b
extinguish the rights of, remove, relocate the rights of
or reposition the apparatus belonging to statutory
undertakers over or within the Order land.
Recovery of costs of new connections
27
1
Where any apparatus of a public utility undertaker or of a
public communications provider is removed under article 26
(statutory undertakers) any person who is the owner or
occupier of premises to which a supply was given from that
apparatus is entitled to recover from the undertaker
compensation in respect of expenditure reasonably incurred
by that person, in consequence of the removal, for the
purpose of effecting a connection between the premises and
any other apparatus from which a supply is given.
2
Paragraph (1)
does not apply in the case of the removal of a public sewer
but where such a sewer is removed under article 26
(statutory undertakers), any person who is—
a
the owner or occupier of premises the drains of
which communicated with that sewer; or
b
the owner of a private sewer which communicated
with that sewer,
is entitled to recover from the undertaker compensation in
respect of expenditure reasonably incurred by that person,
in consequence of the removal, for the purpose of making the
drain or sewer belonging to that person communicate with any
other public sewer or with a private sewerage disposal
plant.
3
This article does not have effect in relation to apparatus
to which Part 3 (street works in England and Wales) of the
1991 Act applies.
4
In this article—
“public communications provider” has the same
meaning as in section 151(1) (interpretation of
Chapter 1) of the Communications Act
2003 ; and
“public utility undertaker” has the same
meaning as in the 1980 Act.
PART 6
OPERATIONS
Operation of generating stations
28
1
The undertaker is authorised to use and operate the
generating stations comprised in the authorised
development.
2
This article does not relieve the undertaker of any
requirement to obtain any permit or licence under any other
legislation that may be required from time to time to
authorise the operation of an electricity generating
station.
Deemed marine licence under the 2009 Act
29
The deemed marine licence set out in Schedule 8 (deemed marine
licence under the 2009 Act), is deemed to be granted on the date
this Order comes into force to the undertaker under Part 4 (marine
licensing) of the 2009 Act for the licensed marine activities set
out in Part 1, and subject to the conditions set out in Part 2 of
that Schedule.
PART 7
MISCELLANEOUS AND GENERAL
Application of landlord and tenant law
30
1
This article applies to—
a
any agreement for leasing to any person the whole
or any part of the authorised development or the
right to operate the same; and
b
any agreement entered into by the undertaker with
any person for the construction, maintenance, use or
operation of the authorised development, or any part
of it,
so far as any such agreement relates to the terms on which
any land which is the subject of a lease granted by or under
that agreement is to be provided for that person's
use.
2
No enactment or rule of law regulating the rights and
obligations of landlords and tenants may prejudice the
operation of any agreement to which this article
applies.
3
Accordingly, no such enactment or rule of law to which
paragraph
applies in relation to the rights and obligations of the
parties to any lease granted by or under any such agreement
so as to—
a
exclude or in any respect modify any of the rights
and obligations of those parties under the terms of
the lease, whether with respect to the termination
of the tenancy or any other matter;
b
confer or impose on any such party any right or
obligation arising out of or connected with anything
done or omitted on or in relation to land which is
the subject of the lease, in addition to any such
right or obligation provided for by the terms of the
lease; or
c
restrict the enforcement (whether by action for
damages or otherwise) by any party to the lease of
any obligation of any other party under the
lease.
Operational land for purposes of the 1990 Act
31
Development consent granted by this Order is treated as specific
planning permission for the purposes of section 264(3)(a) (cases in
which land is to be treated as operational land for the purposes of
that Act) of the 1990 Act.
Felling or lopping of trees
32
1
The undertaker may fell or lop any tree or shrub near any
part of the authorised development, or cut back its roots,
if it reasonably believes it to be necessary to do so to
prevent the tree or shrub from obstructing or interfering
with the construction, maintenance or operation of the
authorised development or any apparatus used in connection
with the authorised development.
2
In carrying out any activity authorised by paragraph
(1), the
undertaker must not do any unnecessary damage to any tree or
shrub and must pay compensation to any person for any loss
or damage arising from such activity.
3
Any dispute as to a person's entitlement to compensation
under paragraph , or as to the amount of
compensation, must be determined under Part 1 of the 1961
Act.
Trees subject to tree preservation orders
33
1
The undertaker may fell or lop any tree within or
overhanging land within the Order limits subject to a tree
preservation order or cut back its roots, if it reasonably
believes it to be necessary to do so in order to prevent the
tree from obstructing or interfering with the construction,
maintenance or operation of the authorised development or
any apparatus used in connection with the authorised
development.
2
In carrying out any activity authorised by paragraph
(1)—
a
the undertaker must do no unnecessary damage to
any tree and must pay compensation to any person for
any loss or damage arising from such activity;
and
b
the duty contained in section 206(1) (replacement
of trees) of the 1990 Act does not apply.
3
The authority given by paragraph (1) constitutes a deemed
consent under the relevant tree preservation order.
4
Any dispute as to a person's entitlement to compensation
under paragraph , or as to the amount of
compensation, will be determined under Part 1 of the 1961
Act.
Certification of plans and documents, etc.
34
1
The undertaker must, as soon as practicable after the
making of this Order, submit to the Secretary of State
copies of—
a
the book of reference;
b
the Crown land plan;
c
the environmental statement;
d
the land plans;
e
the location, order limits and grid coordinates
plans;
f
the outline battery safety management plan;
g
the outline construction environmental management
plan;
h
the outline decommissioning and restoration
plan;
i
the outline design principles;
j
the outline landscape and biodiversity management
plan;
k
the outline special protection area construction
noise management plan;
l
outline skills, supply chain and employment
plan;
m
the outline written scheme of
investigation;
n
the rights of way plan;
o
the special category land plan – open
space;
p
the statutory / non-statutory nature conservation
designations plan;
q
the statutory / non-statutory historic environment
designations plan;
r
the streets and access plan;
s
the water bodies in a river basin management plan , plan ;
and
t
the works plan;
for certification that they are true copies of
those plans and documents.
2
A plan or document so certified is admissible in any
proceedings as evidence of the contents of the document of
which it is a copy.
Arbitration
35
1
Any difference under any provision of this Order, unless
otherwise provided for, is to be referred to and settled in
arbitration in accordance with the rules set out in Schedule
9 (arbitration rules) of this Order, by a single arbitrator
to be agreed upon by the parties, within 14 days of receipt
of the notice of arbitration, or if the parties fail to
agree within the time period stipulated, to be appointed on
application of either party (after giving written notice to
the other) by the Secretary of State.
Requirements, appeals, etc.
36
1
Where an application is made to, or a request is made of,
the relevant planning authority or any other relevant person
for any agreement or approval required or contemplated by
any of the provisions of this Order, such agreement or
approval must, if given, be given in writing and must not be
unreasonably withheld or delayed.
2
Part 3 (procedure for discharge of requirements) of
Schedule 1 has effect in relation to all agreements or
approvals granted, refused or withheld in relation to
requirements included in Part 2 of that Schedule.
Crown rights
37
1
Nothing in this Order affects prejudicially any estate,
right, power, privilege, authority or exemption of the Crown
and in particular, nothing in this Order authorises the
undertaker or any licensee to take possession of, use, enter
upon or in any manner interfere with any land or rights of
any description (including any portion of the shore or bed
of the sea or any river, channel, creek, bay or
estuary)—
a
belonging to Her Majesty in right of the Crown and
forming part of the Crown Estate without the consent
in writing of the Crown Estate Commissioners;
b
belonging to Her Majesty in right of the Crown and
not forming part of the Crown Estate without the
consent in writing of the government department
having the management of that land; or
c
belonging to a government department or held in
trust for Her Majesty for the purposes of a
government department without the consent in writing
of that government department.
2
Paragraph (1)
does not apply to the exercise of any right under this Order
for the compulsory acquisition of an interest in any Crown
land (as defined in the 2008 Act) which is for the time
being held otherwise than by or on behalf of the
Crown.
3
A consent under paragraph (1) may be given unconditionally or
subject to terms and conditions and is deemed to have been
given in writing where it is sent electronically.
Protective provisions
38
Schedule 7 (protective provisions) has effect.
Funding
39
1
The undertaker must not exercise the powers conferred by
the provisions referred to in paragraph in relation
to any Order land unless it has first put in place
either—
a
a guarantee and the amount of that guarantee
approved by the Secretary of State in respect of the
liabilities of the undertaker to pay compensation
pursuant to the provisions referred to in paragraph
(2) in relation to that land ; or
b
an alternative form of security and the amount of
that security for that purpose approved by the
Secretary of State in respect of the liabilities of
the undertaker to pay compensation pursuant to the
provisions referred to in paragraph (2) in relation to that land .
2
The provisions are—
a
article 16 (compulsory acquisition of
land);
b
article 18 (compulsory acquisition of
rights);
c
article 19 (private rights);
d
article 21
(acquisition of subsoil only);
e
article 23 (rights under or over streets);
f
article 24 (temporary use of land for carrying out
the authorised development);
g
article 25 (temporary use of land for maintaining
the authorised development); and
h
article 26 (statutory undertakers).
3
A guarantee or alternative form of security given in
respect of any liability of the undertaker to pay
compensation pursuant to the provisions referred to in
paragraph (2) is to be treated as enforceable against the
guarantor or person providing the alternative form of
security by any person to whom such compensation is payable
and must be in such a form as to be capable of enforcement
by such a person.
4
Nothing in this article requires a guarantee or
alternative form of security to be in place for more than 15
years after the date on which the relevant power is
exercised.
Signed by Authority of the Secretary of State for Business, Energy and
Industrial Strategy
Gareth Leigh
Head of Energy Infrastructure Planning
Department for Business, Energy and Industrial
Strategy
SCHEDULE 1
AUTHORISED DEVELOPMENT
Article 3
PART 1
AUTHORISED DEVELOPMENT
1
In the Districts of Swale and Canterbury in the County of Kent
a nationally significant infrastructure project as defined in
sections 14 and 15 of the 2008 Act and associated development
under section 115(1)(b) of the 2008 Act.
The nationally significant infrastructure project comprises up
to two generating stations with a combined gross electrical
output capacity of over 50 megawatts comprising all or any of
the work numbers in this Schedule or any part of any work number
in this Schedule—
Work No.1 — a ground mounted solar
photovoltaic generating station with a gross electrical output
capacity of over 50 megawatts comprising—
a
solar modules;
b
inverters;
c
transformers; and
d
a network of cable circuits.
Work No.2 — works comprising either—
a
an energy storage facility with a gross storage
capacity of over 50 megawatts comprising—
i
energy storage;
ii
transformers;
iii
switch gear and ancillary equipment;
iv
a network of cable circuits;
v
cables connecting to Work Nos. 1 and 3;
and
vi
a flood protection bund; or
b
an extension of the ground mounted solar photovoltaic
generating station in Work No.1 and comprising—
i
solar modules;
ii
inverters;
iii
transformers;
iv
electrical underground cables connecting to
Work Nos. 1 and 3;
v
a network of cable circuits; and
vi
a flood protection bund,
and associated development within the meaning of section
115(2) of the 2008 Act comprising—
Work No.3 — a substation with works
comprising—
a
a network of cable circuits;
b
electrical underground cables connecting to Work Nos 1
and 2, and the existing substation;
c
construction compounds; and
d
a flood protection bund.
Work No.4 — works comprising—
a
a network of cable circuits;
b
construction compounds;
c
landscaping;
d
earthworks;
e
drainage; and
f
undergrounding of existing overhead line.
Work No.5 — works to lay cable systems
connecting Work No. 3 and the existing substation and works to
create and maintain means of access connecting to the existing
access road in Work No. 7;
Work No.6 — works to create and maintain a
means of access connecting Work Nos 1, 2 and 3 with the existing
access road in Work No. 7;
Work No.7 — works to alter and maintain the
existing access road; Work No.8 — works to create and maintain a
habitat management area, comprising—
a
earth works;
b
means of access; and
c
drainage;
Work No.9 — works to maintain the existing
flood defence, comprising—
a
inspection;
b
investigation (above MHWS, inclusive of trial
pitting);
c
replacement of expansion joint material;
d
concrete repair (to a standard specified in BS EN
1504);
e
replacement of concrete toe beam;
f
vegetation management (including grass cutting and
removal of larger vegetation);
g
replacement of loose and missing block work;
h
repair of voids;
i
fencing repair and replacement;
j
servicing outfalls;
k
cleaning outfall ancillary structures;
l
topping up of embankment crest levels at localised low
spots;
m
vermin control;
n
repairs of rutting in crest;
o
repointing of jointed structures;
p
replacing modular blocks;
q
replacement of toe armour as required;
r
reinstatement of timber toe piles;
s
timber groyne plank replacement;
t
replacement of bolts on groyne;
u
placement of timber rubbing boards on groyne;
v
localised movements of beach material;
w
cleaning/dredging of drainage ditch channels;
x
replacement of pitching where present;
y
replacement of access structures;
z
painting; and
aa
any other activities required to be undertaken
which—
i
use the same materials as those on the
existing flood defence;
ii
do not alter the plan form or cross section of
the existing flood defence;
iii
do not provide an overall increase or
reduction in flood level; and
iv
do not require excavations of beach material
deeper than 1.5 metres.
In connection with such Work Nos. 1 to 9 and to the extent
that they do not otherwise form part of any such work, further
associated development comprising such other works as may be
necessary or expedient for the purposes of or in connection with
the relevant part of the authorised development and which fall
within the scope of the work assessed by the environmental
statement, including—
a
works for the provision of fencing and security
measures such as CCTV and lighting;
b
laying down of internal access tracks;
c
ramps, means of access and footpaths;
d
bunds, embankments, and swales;
e
boundary treatments, including means of
enclosure;
f
laying out and surfacing of permissive paths,
including the laying and construction of drainage
infrastructure, signage and information boards;
g
habitat creation and management, including earthworks,
landscaping, means of enclosure, and the laying and
construction of drainage infrastructure;
h
jointing bays, cable ducts, cable protection, joint
protection, manholes, kiosks, marker posts, underground
cable marker, tiles and tape, and lighting and other
works associated with cable laying;
i
works for the provision of apparatus including
cabling, water supply works, foul drainage provision,
surface water management systems and culverting;
j
works to alter the position of apparatus, including
mains, sewers, drains and cables;
k
works to alter the course of, or otherwise interfere
with, non-navigable rivers, streams or
watercourses;
l
landscaping and other works to mitigate any adverse
effects of the construction, maintenance or operation of
the authorised development;
m
works for the benefit or protection of land affected
by the authorised development; and
n
working sites in connection with the construction of
the authorised development, construction lay down areas
and compounds, storage compounds and their
restoration.
2
The grid coordinates for that part of the authorised
development which is seaward of MHWS are specified below—
Point ID Latitude (DMS) Longitude (DMS) Point ID Latitude (DMS) Longitude (DMS) 1 51° 19′ 56.946″
N 0° 54′ 46.089″ E 100 51° 20′32.408″ N 0° 54′ 7.763″ E 2 51° 19′ 58.535″
N 0° 54′ 45.298″ E 101 51° 20′ 33.143″
N 0° 54′ 9.545″ E 3 51° 19′ 58.708″
N 0° 54′ 45.201″ E 102 51° 20′ 34.285″
N 0° 54′ 13.532″ E 4 51° 19′ 59.027″
N 0° 54′ 45.080″ E 103 51° 20′ 35.087″
N 0° 54′ 17.689″ E 5 51° 19′ 59.384″
N 0° 54′ 44.724″ E 104 51° 20′ 35.317″
N 0° 54′ 21.662″ E 6 51° 19′ 59.960″
N 0° 54′ 44.350″ E 105 51° 20′ 37.215″
N 0° 54′ 36.902″ E 7 51° 20′ 1.300″ N 0° 54′ 43.858″ E 106 51° 20′ 37.791″
N 0° 54′ 38.342″ E 8 51° 20′ 2.911″ N 0° 54′ 42.665″ E 107 51° 20′ 37.114″
N 0° 54′ 46.675″ E 9 51° 20′ 3.116″ N 0° 54′ 42.384″ E 108 51° 20′ 37.181″
N 0° 54′ 46.705″ E 10 51° 20′ 4.788″ N 0° 54′ 40.819″ E 109 51° 20′ 37.035″
N 0° 54′ 49.041″ E 11 51° 20′ 4.959″ N 0° 54′ 40.563″ E 110 51° 20′ 36.955″
N 0° 54′ 49.652″ E 12 51° 20′ 5.438″ N 0° 54′ 40.227″ E 111 51° 20′ 36.954″
N 0° 54′ 49.874″ E 13 51° 20′ 6.231″ N 0° 54′ 38.746″ E 112 51° 20′ 36.983″
N 0° 54′ 50.130″ E 14 51° 20′ 6.637″ N 0° 54′ 38.090″ E 113 51° 20′ 36.985″
N 0° 54′ 50.419″ E 15 51° 20′ 7.311″ N 0° 54′ 36.551″ E 114 51° 20′ 36.920″
N 0° 54′ 50.652″ E 16 51° 20′ 7.817″ N 0° 54′ 35.012″ E 115 51° 20′ 37.006″
N 0° 54′ 51.158″ E 17 51° 20′ 8.559″ N 0° 54′ 30.512″ E 116 51° 20′ 37.215″
N 0° 54′ 50.375″ E 18 51° 20′ 8.713″ N 0° 54′ 28.690″ E 117 51° 20′ 37.673″
N 0° 54′ 46.063″ E 19 51° 20′ 8.886″ N 0° 54′ 27.093″ E 118 51° 20′ 38.109″
N 0° 54′ 39.463″ E 20 51° 20′ 8.229″ N 0° 54′ 29.798″ E 119 51° 20′ 36.284″
N 0° 54′ 26.251″ E 21 51° 20′ 7.773″ N 0° 54′ 32.964″ E 120 51° 20′ 35.445″
N 0° 54′ 16.667″ E 22 51° 20′ 6.916″ N 0° 54′ 36.190″ E 121 51° 20′ 34.876″
N 0° 54′ 13.691″ E 23 51° 20′ 5.271″ N 0° 54′ 39.948″ E 122 51° 20′ 33.400″
N 0° 54′ 8.742″ E 24 51° 20′ 1.514″ N 0° 54′ 43.309″ E 123 51° 20′ 32.885″
N 0° 54′ 7.478″ E 25 51° 19′ 59.852″
N 0° 54′ 43.782″ E 124 51° 20′ 32.714″
N 0° 54′ 5.934″ E 26 51° 20′ 11.941″
N 0° 54′ 13.217″ E 125 51° 20′ 32.081″
N 0° 54′ 3.003″ E 27 51° 20′ 11.877″
N 0° 54′ 12.095″ E 126 51° 20′ 36.869″
N 0° 54′ 51.672″E 28 51° 20′ 11.663″
N 0° 54′ 10.398″ E 127 51° 20′ 36.819″
N 0° 54′ 51.640″ E 29 51° 20′ 11.436″
N 0° 54′ 9.385″ E 128 51° 20′ 36.762″
N 0° 54′ 51.642″ E 30 51° 20′ 10.399″
N 0° 54′ 6.406″ E 129 51° 20′ 36.711″
N 0° 54′ 51.724″ E 31 51° 20′ 10.522″
N 0° 54′ 7.338″ E 130 51° 20′ 36.674″
N 0° 54′ 51.969″ E 32 51° 20′ 10.085″
N 0° 53′ 46.895″ E 131 51° 20′ 36.662″
N 0° 54′ 52.243″ E 33 51° 20′ 10.324″
N 0° 53′ 47.052″ E 132 51° 20′ 36.643″
N 0° 54′ 52.308″ E 34 51° 20′ 10.497″
N 0° 53′ 47.265″ E 133 51° 20′ 36.557″
N 0° 54′ 52.486″ E 35 51° 20′ 10.555″
N 0° 53′ 47.377″ E 134 51° 20′ 36.597″
N 0° 54′ 52.469″ E 36 51° 20′ 10.609″
N 0° 53′ 47.678″ E 135 51° 20′ 36.651″
N 0° 54′ 52.486″ E 37 51° 20′ 10.685″
N 0° 53′ 56.589″ E 136 51° 20′ 42.418″
N 0° 55′ 36.744″ E 38 51° 20′ 10.577″
N 0° 53′ 57.633″ E 137 51° 20′ 42.431″
N 0° 55′ 37.288″ E 39 51° 20′ 10.677″
N 0° 53′ 57.274″ E 138 51° 20′ 42.700″
N 0° 55′ 40.210″ E 40 51° 20′ 10.741″
N 0° 53′ 56.919″ E 139 51° 20′ 42.775″
N 0° 55′ 40.607″ E 41 51° 20′ 10.759″
N 0° 53′ 56.703″ E 140 51° 20′ 42.916″
N 0° 55′ 40.911″ E 42 51° 20′ 10.691″
N 0° 53′ 47.644″ E 141 51° 20′ 42.913″
N 0° 55′ 41.691″ E 43 51° 20′ 10.658″
N 0° 53′ 47.286″ E 142 51° 20′ 43.090″
N 0° 55′ 42.369″ E 44 51° 20′ 10.631″
N 0° 53′ 47.191″ E 143 51° 20′ 43.208″
N 0° 55′ 42.254″ E 45 51° 20′ 10.417″
N 0° 53′ 46.970″ E 144 51° 20′ 43.241″
N 0° 55′ 43.046″ E 46 51° 20′ 10.380″
N 0° 53′ 46.880″ E 145 51° 20′ 43.362″
N 0° 55′ 43.772″ E 47 51° 20′ 10.348″
N 0° 53′ 46.718″ E 146 51° 20′ 43.555″
N 0° 55′ 43.598″ E 48 51° 20′ 10.380″
N 0° 53′ 46.503″ E 147 51° 20′ 43.523″
N 0° 55′ 44.092″ E 49 51° 20′ 10.447″
N 0° 53′ 46.302″ E 148 51° 20′ 43.570″
N 0° 55′ 44.669″ E 50 51° 20′ 27.907″
N 0° 53′ 46.744″ E 149 51° 20′ 43.671″
N 0° 55′ 45.270″ E 51 51° 20′ 27.862″
N 0° 53′ 47.043″ E 150 51° 20′ 43.799″
N 0° 55′ 45.070″ E 52 51° 20′ 27.876″
N 0° 53′ 47.230″ E 151 51° 20′ 43.780″
N 0° 55′ 45.567″ E 53 51° 20′ 27.830″
N 0° 53′ 47.672″ E 152 51° 20′ 43.948″
N 0° 55′ 46.756″ E 54 51° 20′ 27.699″
N 0° 53′ 48.253″ E 153 51° 20′ 44.306″
N 0° 55′ 48.368″ E 55 51° 20′ 27.585″
N 0° 53′ 48.411″ E 154 51° 20′ 44.687″
N 0° 55′ 49.791″ E 56 51° 20′ 27.555″
N 0° 53′ 48.435″ E 155 51° 20′ 45.757″
N 0° 55′ 54.594″ E 57 51° 20′ 27.538″
N 0° 53′ 48.625″ E 156 51° 20′ 47.241″
N 0° 56′ 2.207″ E 58 51° 20′ 27.517″
N 0° 53′ 48.660″ E 157 51° 20′ 47.983″
N 0° 56′ 6.651″ E 59 51° 20′ 27.406″
N 0° 53′ 48.710″ E 158 51° 20′ 48.152″
N 0° 56′ 6.491″ E 60 51° 20′ 27.376″
N 0° 53′ 48.744″ E 159 51° 20′ 48.092″
N 0° 56′ 6.958″ E 61 51° 20′ 27.358″
N 0° 53′ 48.805″ E 160 51° 20′ 48.096″
N 0° 56′ 7.304″ E 62 51° 20′ 27.357″
N 0° 53′ 48.852″ E 161 51° 20′ 48.226″
N 0° 56′ 7.918″ E 63 51° 20′ 27.320″
N 0° 53′ 49.159″ E 162 51° 20′ 48.436″
N 0° 56′ 7.698″ E 64 51° 20′ 27.275″
N 0° 53′ 49.275″ E 163 51° 20′ 48.394″
N 0° 56′ 8.208″ E 65 51° 20′ 27.252″
N 0° 53′ 49.310″ E 164 51° 20′ 48.416″
N 0° 56′ 8.607″ E 66 51° 20′ 27.112″
N 0° 53′ 49.343″ E 165 51° 20′ 48.474″
N 0° 56′ 8.816″ E 67 51° 20′ 27.084″
N 0° 53′ 49.434″ E 166 51° 20′ 48.520″
N 0° 56′ 8.981″ E 68 51° 20′ 27.059″
N 0° 53′ 49.665″ E 167 51° 20′ 48.530″
N 0° 56′ 9.101″ E 69 51° 20′ 27.036″
N 0° 53′ 49.798″ E 168 51° 20′ 48.516″
N 0° 56′ 9.227″ E 70 51° 20′ 26.925″
N 0° 53′ 50.097″ E 169 51° 20′ 48.514″
N 0° 56′ 9.358″ E 71 51° 20′ 26.949″
N 0° 53′ 50.133″ E 170 51° 20′ 48.592″
N 0° 56′ 9.802″ E 72 51° 20′ 27.049″
N 0° 53′ 49.908″ E 171 51° 20′ 48.676″
N 0° 56′ 10.128″ E 73 51° 20′ 27.113″
N 0° 53′ 49.705″ E 172 51° 20′ 48.616″
N 0° 56′ 7.869″ E 74 51° 20′ 27.164″
N 0° 53′ 49.465″ E 173 51° 20′ 48.857″
N 0° 56′ 14.026″ E 75 51° 20′ 27.246″
N 0° 53′ 49.429″ E 174 51° 20′ 48.852″
N 0° 56′ 14.100″ E 76 51° 20′ 27.272″
N 0° 53′ 49.410″ E 175 51° 20′ 48.844″
N 0° 56′ 14.168″ E 77 51° 20′ 27.326″
N 0° 53′ 49.330″ E 176 51° 20′ 48.807″
N 0° 56′ 14.326″ E 78 51° 20′ 27.347″
N 0° 53′ 49.270″ E 177 51° 20′ 48.722″
N 0° 56′ 14.640″ E 79 51° 20′ 27.374″
N 0° 53′ 49.080″ E 178 51° 20′ 48.645″
N 0° 56′ 15.364″ E 80 51° 20′ 27.403″
N 0° 53′ 48.953″ E 179 51° 20′ 48.916″
N 0° 56′ 17.077″ E 81 51° 20′ 27.459″
N 0° 53′ 48.796″ E 180 51° 20′ 44.526″
N 0° 56′ 52.481″ E 82 51° 20′ 27.534″
N 0° 53′ 48.775″ E 181 51° 20′ 44.523″
N 0° 56′ 53.111″ E 83 51° 20′ 27.577″
N 0° 53′ 48.731″ E 182 51° 20′ 44.613″
N 0° 56′ 53.520″ E 84 51° 20′ 27.605″
N 0° 53′ 48.666″ E 183 51° 20′ 44.607″
N 0° 56′ 53.654″ E 85 51° 20′ 27.622″
N 0° 53′ 48.491″ E 184 51° 20′ 44.472″
N 0° 56′ 54.152″ E 86 51° 20′ 27.695″
N 0° 53′ 48.408″ E 185 51° 20′ 44.365″
N 0° 56′ 54.631″ E 87 51° 20′ 27.763″
N 0° 53′ 48.293″ E 186 51° 20′ 44.337″
N 0° 56′ 54.961″ E 88 51° 20′ 27.942″
N 0° 53′ 47.338″ E 187 51° 20′ 44.341″
N 0° 56′ 55.338″ E 89 51° 20′ 27.948″
N 0° 53′ 47.235″ E 188 51° 20′ 44.188″
N 0° 56′ 56.399″ E 90 51° 20′ 27.910″
N 0° 53′ 47.165″ E 189 51° 20′ 44.193″
N 0° 56′ 56.709″ E 91 51° 20′ 27.920″
N 0° 53′ 47.052″ E 190 51° 20′ 44.268″
N 0° 56′ 57.174″ E 92 51° 20′ 27.939″
N 0° 53′ 46.941″ E 191 51° 20′ 49.033″
N 0° 56′ 20.247″ E 93 51° 20′ 27.963″
N 0° 53′ 46.853″ E 192 51° 20′ 48.835″
N 0° 56′ 14.262″ E 94 51° 20′ 27.997″
N 0° 53′ 46.798″ E 193 51° 20′ 48.854″
N 0° 56′ 14.137″ E 95 51° 20′ 30.414″
N 0° 53′ 56.932″ E 194 51° 20′ 48.859″
N 0° 56′ 14.060″ E 96 51° 20′ 30.486″
N 0° 53′ 58.149″ E 195 51° 20′ 47.432″
N 0° 56′ 30.037″ E 97 51° 20′ 30.389″
N 0° 53′ 58.557″ E 196 51° 20′ 47.356″
N 0° 56′ 30.457″ E 98 51° 20′ 31.727″
N 0° 54′ 3.734″ E 197 51° 20′ 46.743″
N 0° 56′ 35.249″ E 99 51° 20′ 32.193″
N 0° 54′ 5.976″ E 198 51° 20′ 46.536″
N 0° 56′ 37.296″ E
PART 2
REQUIREMENTS
Time limits
1
The authorised development must commence no later than the
expiration of five years beginning with the date this Order
comes into force.
Detailed design approval
2
1
No phase of the authorised development may
commence until details of—
a
the layout;
b
scale;
c
proposed finished ground levels;
d
external appearance;
e
hard surfacing materials;
f
vehicular and pedestrian access, parking and
circulation areas;
g
refuse or other storage units, signs and
lighting;
h
drainage, water, power and communications
cables and pipelines;
i
programme for landscaping works; and
j
fencing,
relating to that phase have been submitted to and
approved in writing by the relevant planning
authority.
2
The details submitted must accord with—
a
the location, order limits and grid
coordinates plan;
b
the works plan;
c
the principles and assessments set out in
the environmental statement; and
d
the outline design principles, or such
variation thereof as may be approved by the
relevant planning authority pursuant to
requirement .
3
The authorised development must be carried out in
accordance with the approved details.
Battery safety management
3
1
Work No. 2(a) must not commence until a Battery
Safety Management Plan (“BSMP”) has been submitted
to and approved by the relevant planning
authority.
2
The BSMP must prescribe measures to facilitate
safety during the construction, operation and
decommissioning of Work No.2(a) including the
transportation of new, used and replacement battery
cells both to and from the authorised
development.
3
The BSMP must accord with the outline battery
safety management plan.
4
The relevant planning authority must consult with
the Health and Safety Executive and Kent Fire and
Rescue Service before determining an application for
approval of the BSMP.
5
The BSMP must be implemented as approved.
Phases of authorised development
4
1
The authorised development may not be commenced
until a written scheme setting out the phases of
construction of the authorised development has been
submitted to and approved by the relevant planning
authority.
2
The scheme must be implemented as approved.
Landscape and biodiversity management plan
5
1
No phase of the authorised development may
commence until a written landscape and biodiversity
management plan (which accords with the outline
landscape and biodiversity management plan) has been
submitted to and approved by the relevant planning
authority in consultation with Natural
England.
2
The landscape and biodiversity management plan
must be implemented as approved.
Implementation and maintenance of landscaping
6
1
All landscaping works must be carried out in
accordance with the landscape and biodiversity
management plan approved under requirement
(landscape and biodiversity management plan), and in
accordance with the relevant recommendations of
appropriate British Standards.
2
Any tree or shrub planted as part of an approved
landscaping management scheme that, within a period
of five years after planting, is removed, dies or
becomes, in the opinion of the relevant planning
authority, seriously damaged or diseased must be
replaced in the first available planting season with
a specimen of the same species and size as that
originally planted.
Public rights of way diversions
7
1
No phase of the authorised development may
commence until a public rights of way management
plan for any sections of public rights of way shown
to be temporarily closed on the access and rights of
way plans for that phase has been submitted to and
approved by the relevant planning authority in
consultation with the relevant highway
authority.
2
The plan must include details of—
a
measures to minimise the length of any
sections of public rights of way to be temporarily
closed; and
b
advance publicity and signage in respect of
any sections of public rights of way to be
temporarily closed.
3
The plan must be implemented as approved unless
otherwise agreed with the relevant planning
authority in consultation with the highway
authority.
Fencing and other means of enclosure
8
1
No phase of the authorised development may
commence until written details of all proposed
permanent and temporary fences, walls or other means
of enclosure of the connection works for that phase
have been submitted to and approved by the relevant
planning authority as part of the detailed design
approval required by requirement 2(1).
2
For the purposes of requirement 8(1), “commence”
includes any site preparation works.
3
Any construction site must remain securely fenced
in accordance with the approved details at all times
during construction of the authorised
development.
4
Any temporary fencing must be removed on
completion of the phase of construction of the
authorised development for which it was used.
5
Any approved permanent fencing must be completed
before completion of the authorised
development.
Surface and foul water drainage
9
1
No phase of the authorised development may
commence until details of the surface and (if any)
foul water drainage system (including means of
pollution control) for that phase have been
submitted to and approved by the relevant planning
authority in consultation with Kent County Council
as lead local flood authority and the Lower Medway
Internal Drainage Board.
2
The surface and foul water drainage system must be
constructed in accordance with the approved
details.
Archaeology
10
1
No phase of the authorised development may
commence until a written scheme of archaeological
investigation (which must accord with the outline
written scheme of investigation) for that phase has
been submitted to and approved by the relevant
planning authority.
2
For the purposes of requirement 10(1), “commence”
includes any site preparation works.
3
In the event that site investigation is required,
the scheme must include details of the
following—
a
an assessment of significance and research
questions;
b
the programme and methodology of site
investigation and recording;
c
the programme for post investigation
assessment;
d
provision for analysis of the site
investigation and recording;
e
provision for publication and dissemination
of the analysis and records of the site
investigation;
f
provision for archive deposition of the
analysis and records of the site investigation;
and
g
nomination of a competent person, persons or
organisation to undertake the works set out within
the written scheme of investigation.
4
Any archaeological works or watching brief must be
carried out in accordance with the approved
scheme.
5
In the event that site investigation is required,
the site investigation and post investigation
assessment must be completed in accordance with the
programme set out in the written scheme of
archaeological investigation and provision made for
analysis, publication and dissemination of results
and archive deposition.
Construction environmental management plan
11
1
No phase of the authorised development may
commence until a construction environmental
management plan (which must accord with the outline
construction environmental management plan) for that
phase has been submitted to and approved by the
relevant planning authority, in consultation with
the relevant highway authority and the Environment
Agency.
2
The construction environmental management plan
must include the following documents relevant to the
phase of the authorised development in respect of
which it is submitted—
a
site waste management plan;
b
breeding bird protection plan;
c
new watercourse crossing inventory;
and
d
upgraded watercourse crossing
inventory.
3
The construction environmental management plan
must be implemented as approved.
Construction traffic management plan
12
1
No phase of the authorised development may
commence until written details of a construction
traffic management plan (which must accord with the
outline construction traffic management plan) for
that phase has been submitted to and approved by the
relevant planning authority in consultation with the
relevant highway authority.
2
The construction traffic management plan must be
implemented as approved.
Special protection area construction noise management
plan
13
1
No phase of the authorised development may
commence until written details of a special
protection area construction noise management plan
(which must accord with the outline special
protection area construction noise plan) for that
phase has been submitted to and approved by the
relevant planning authority.
2
The special protection area construction noise
management plan must be implemented as
approved.
Protected species
14
1
No phase of the authorised development may
commence until final pre-construction survey work
has been carried out for that phase to establish
whether a protected species is present on any of the
land affected, or likely to be affected, by the
authorised development or in any of the trees to be
lopped or felled as part of that stage of the
connection works.
2
For the purposes of requirement 14(1) “commence”
includes any site preparation works.
3
Where a protected species is shown to be present,
the phase of the authorised development must not
begin until, after consultation with Natural England
and the relevant planning authority, a scheme of
protection and mitigation measures has been
submitted to and approved by the relevant planning
authority.
4
The authorised development must be carried out in
accordance with the approved scheme.
5
In this requirement, “ protected species ” refers to
any species defined as a European Protected Species
in regulations 42 (European protected species of
animals) and 46 (European protected species of
plants) of the Conservation of Habitats and Species
Regulations 2017 or any
species to which Part I (wildlife) and Schedule 5
(animals which are protected) of the Wildlife and
Countryside Act 1981
applies.
Operational noise
15
1
No phase of the authorised development may
commence until an operational noise assessment
containing details of how the design of the
authorised development has incorporated mitigation
to ensure the operational noise rating levels as set
out in the environmental statement are to be
complied with for that phase has been submitted to
and approved by the relevant local planning
authority.
2
The design as described in the operational noise
assessment must be implemented as approved.
Local skills, supply chain and employment
16
1
No phase of the authorised development may
commence until for that phase a skills, supply chain
and employment plan in relation to the authorised
development (which accords with the outline skills,
supply chain and employment plan) has been submitted
to and approved by the relevant planning
authority.
2
The skills, supply chain and employment plan must
identify opportunities for individuals and
businesses to access employment and supply chain
opportunities associated with the construction,
operation and maintenance of the authorised
development, and the means for publicising such
opportunities.
3
The skills and employment plans must be
implemented as approved.
Decommissioning
17
1
Within 14 days of the date of final commissioning
the undertaker must serve written notice on the
relevant planning authority and the Environment
Agency of the date of final commissioning.
2
No later than the 35th anniversary of the date of
final commissioning, the undertaker and Environment
Agency must—
a
undertake a review of the progress made by
the Environment Agency in respect of managed
realignment of the existing flood defence, with
particular regard to the timescales for
achieving—
i
all necessary consents and approvals;
ii
all the land and/or rights over land;
and
iii
funding required for managed realignment of
the existing flood defence; and
b
as soon as reasonably practicable following
that review, submit a managed realignment
programme to the relevant planning authority,
which sets out the timescales for achieving the
matters prescribed in sub-paragraphs to
inclusively and the anticipated date by which the
parts of the authorised development required for
managed realignment of the existing flood defence
must be decommissioned.
3
If the Environment Agency is unable to satisfy the
requirements of sub-paragraph on or before the
35th anniversary of the date of final commissioning,
the process set out in that sub-paragraph must be
repeated every five years thereafter until the
Environment Agency is able to submit a managed
realignment programme to the relevant planning
authority compliant with that sub-paragraph.
4
The Environment Agency must consult, and have
regard to any representations received from, the
undertaker in respect of the managed realignment
programme before it is submitted to the relevant
planning authority and if the undertaker and
Environment Agency cannot agree the timescales to be
included in the managed realignment programme those
timescales shall be determined pursuant to article
35 (arbitration).
5
The Environment Agency may submit an application
to the relevant planning authority for a
decommissioning notice to be served on the
undertaker in accordance with the managed
realignment programme submitted pursuant to
sub-paragraph or provided that it has first
consulted, and had regard to, any submissions on the
application made by the undertaker.
6
The application made pursuant to sub-paragraph
must
be accompanied by evidence that the Environment
Agency has secured the matters prescribed in
sub-paragraphs to
inclusively.
7
Within eight weeks of receiving an application
pursuant to sub-paragraph , or such other timescale as
may be agreed in advance with the undertaker, the
relevant planning authority must serve the
decommissioning notice on the undertaker.
8
Before serving the decommissioning notice, the
relevant planning authority must—
a
be satisfied on the evidence before it that
the Environment Agency has secured the matters
prescribed in sub-paragraphs
to
inclusively; and
b
consult, and have regard to, any submissions
made by the undertaker.
9
The decommissioning notice must—
a
give reasons for the relevant planning
authority determining that the Environment Agency
has secured the matters prescribed in
sub-paragraphs to
inclusively;
b
include a plan detailing the extent of land
within the Order limits required for managed
realignment of the existing flood defence;
c
not be served—
i
within a period of 40 years from the date of
final commissioning, or until such later time as
any appeal, arbitration or judicial review of any
decommissioning notice served pursuant to this
Requirement has been determined, and provide that
the authorised development may continue to
generate and store electricity on a commercial
basis until the later of those periods has been
determined; and
ii
in respect of any land within the Order
limits that is not required for managed
realignment of the existing flood defence as shown
on the plan required by of this sub-paragraph.
10
The undertaker must submit the decommissioning and
restoration plan to the relevant planning authority
for approval within 3 months of the earlier
of—
a
all or part of the Order land ceasing to be
used for the purposes of electricity generation or
storage (either actively generating electricity or
being available to generate electricity on a
standby basis);
b
the date of the decommissioning notice
served pursuant to sub-paragraph ; or
c
such other timescale as may be approved by
the relevant planning authority in writing.
11
The decommissioning and restoration plan required
by sub-paragraph must—
a
accord with the outline decommissioning and
restoration plan;
b
state the date by which the authorised
development will be decommissioned; and
c
not require the undertaker to decommission
the existing flood defence located within the
Order limits.
12
The decommissioning and restoration plan required
must be implemented as approved.
13
In this requirement the following definitions have
effect—
“ date of final commissioning ” means the date
on which the authorised development commences
operation by generating electricity on a
commercial basis but excluding the generation of
electricity during commissioning and
testing;
“ decommissioning and restoration plan ” means
the decommissioning and restoration plan approved
by the relevant planning authority pursuant to
sub-paragraph which sets out how the
authorised development should be decommissioned
and the specification to which the land should be
restored having regard to the outline
decommissioning and restoration plan and whether
or not that land is required for managed
realignment of the existing flood defence;
“ decommissioning notice ” means the notice to
be served by the relevant planning authority on
the undertaker pursuant to sub-paragraph
which confirms the requirement for the authorised
development to be decommissioned having regard to
the managed realignment programme and the matters
prescribed in sub-paragraph ;
“managed realignment of the existing flood
defence” means the physical realignment of the
existing flood defence located within the Order
limits (that would require the removal of all or
any part of Work No. 1, 2 and 3) as it exists at
the date of this Order and as described in the
Medway Estuary and Swale Strategy published on 10
September 2019 or as otherwise agreed between the
undertaker and the Environment Agency, or
determined by article 35 (arbitration); and
“ managed realignment programme ” means the
managed realignment programme required to be
submitted to the relevant planning authority by
the Environment Agency pursuant to sub-paragraph
or
which sets out the timescales within which the
Environment Agency reasonably expects the matters
prescribed in sub-paragraphs
to
inclusively to be secured such that managed
realignment of the existing flood defence can be
achieved.
Requirement for written approval
18
Where the approval, agreement or confirmation of the
relevant planning authority or another person is required
under a requirement, that approval, agreement or
confirmation must be given in writing.
Amendments to approved details
19
1
With respect to any requirement which requires the
authorised development to be carried out in
accordance with the details approved by the relevant
planning authority or another person, the approved
details must be carried out as approved unless an
amendment or variation is previously agreed in
writing by the relevant planning authority or that
other person in accordance with sub-paragraph
.
2
Any amendments to or variations from the approved
details must be in accordance with the principles
and assessments set out in the environmental
statement. Such agreement may only be given in
relation to immaterial changes where it has been
demonstrated to the satisfaction of the relevant
planning authority or that other person that the
subject matter of the agreement sought is unlikely
to give rise to any materially new or materially
different environmental effects from those assessed
in the environmental statement.
3
The approved details must be taken to include any
amendments that may subsequently be approved in
writing by the relevant planning authority or that
other person.
Consultation
20
Where the relevant planning authority is required by this
Order or other statute to consult with another person or
body prior to discharging a requirement, the undertaker must
consult with such person or body prior to making an
application to discharge the requirement.
PART 3
PROCEDURE FOR DISCHARGE OF REQUIREMENTS
Interpretation
21
In this Part of this Schedule, “discharging authority”
means—
a
any body responsible for giving any consent,
agreement or approval required by a requirement
included in Part 2 of this Schedule, or for giving
any consent, agreement or approval further to any
document referred to in any such requirement;
or
b
the local authority in the exercise of its
functions set out in sections 60 (control of noise
on construction sites) and 61 (prior consent for
work on construction sites) of the Control of
Pollution Act 1974 subsequently referred to as “the
1974 Act” .
Applications made under requirements
22
1
Where an application has been made to the
discharging authority for any consent, agreement or
approval required by a requirement contained in Part
2 of this Schedule, or for any consent, agreement or
approval further to any document referred to in any
such requirement, the discharging authority must
give notice to the undertaker of its decision on the
application within a period of eight weeks beginning
with—
a
the day immediately following that on which
the application is received by the discharging
authority; or
b
where further information is requested under
paragraph , the day immediately following
that on which the further information has been
supplied by the undertaker, or such longer period
as may be agreed in writing by the undertaker and
the discharging authority.
2
In determining any application made to the
discharging authority for any consent, agreement or
approval required by a requirement contained in Part
2 of this Schedule, the discharging authority
may—
a
give or refuse its consent, agreement or
approval; or
b
give its consent, agreement or approval
subject to reasonable conditions,
and where consent, agreement or approval is
refused or granted subject to conditions the
discharging authority must provide its reasons for
that decision with the notice of the
decision.
Further information regarding requirements
23
1
In relation to any application referred to in
paragraph , the discharging authority may
request such further information from the undertaker
as it considers necessary to enable it to consider
the application.
2
If the discharging authority considers that
further information is necessary and the requirement
concerned contained in Part 2 of this Schedule does
not specify that consultation with a consultee is
required, the discharging authority must, within ten
business days of receipt of the application, notify
the undertaker in writing specifying the further
information required.
3
If the requirement concerned contained in Part 2
of this Schedule specifies that consultation with a
consultee is required, the discharging authority
must issue the application to the consultee within
five business days of receipt of the application,
and notify the undertaker in writing specifying any
further information requested by the consultee
within five business days of receipt of such a
request.
4
If the discharging authority does not give the
notification within the period specified in
sub-paragraph or it (and the consultee, as the
case may be) is deemed to have sufficient
information to consider the application and is not
entitled to request further information without the
prior agreement of the undertaker.
Appeals
24
1
Where a person (“ the applicant ”) makes an
application to a discharging authority, the
applicant may appeal to the Secretary of State in
the event that—
a
the discharging authority refuses an
application for any consent, agreement or approval
required by—
i
a requirement contained in Part 2 of this
Schedule; or
ii
a document referred to in any requirement
contained in Part 2 of this Schedule;
b
the discharging authority does not determine
such an application within the time period set out
in paragraph 22(1), or grants it subject to
conditions;
c
the discharging authority issues a notice
further to sections 60 (control of noise on
construction sites) or 61 (prior consent for work
on construction sites) of the 1974 Act;
d
on receipt of a request for further
information pursuant to paragraph of this
Part of this Schedule, the applicant considers
that either the whole or part of the specified
information requested by the discharging authority
is not necessary for consideration of the
application; or
e
on receipt of any further information
requested, the discharging authority notifies the
applicant that the information provided is
inadequate and requests additional information
which the applicant considers is not necessary for
consideration of the application.
2
The appeal process is as follows—
a
any appeal by the applicant must be made
within 42 days of the date of the notice of the
decision or determination, or (where no
determination has been made) the expiry of the
time period set out in paragraph 22(1), giving rise to
the appeal referred to in sub-paragraph
(1);
b
the applicant must submit the appeal
documentation to the Secretary of State and must
on the same day provide copies of the appeal
documentation to the discharging authority and any
consultee specified under the relevant requirement
contained in Part 2 of this Schedule;
c
as soon as is practicable after receiving
the appeal documentation, the Secretary of State
must appoint a person to consider the appeal (“the
appointed person”) and must notify the appeal
parties of the identity of the appointed person
and the address to which all correspondence for
the attention of the appointed person should be
sent;
d
the discharging authority and any consultee
(if applicable) must submit their written
representations together with any other
representations to the appointed person in respect
of the appeal within ten business days of the
start date specified by the appointed person and
must ensure that copies of their written
representations and any other representations as
sent to the appointed person are sent to each
other and to the applicant on the day on which
they are submitted to the appointed person;
e
the applicant must make any
counter-submissions to the appointed person within
ten business days of receipt of written
representations pursuant to sub-paragraph
above; and
f
the appointed person must make a decision
and notify it to the appeal parties, with reasons,
as soon as reasonably practicable after the end of
the ten day period for counter-submissions under
sub-paragraph .
3
The appointment of the appointed person pursuant
to sub-paragraph may be
undertaken by a person appointed by the Secretary of
State for this purpose instead of by the Secretary
of State.
4
In the event that the appointed person considers
that further information is necessary to enable the
appointed person to consider the appeal the
appointed person must as soon as practicable notify
the appeal parties in writing specifying the further
information required, the appeal party from whom the
information is sought, and the date by which the
information is to be submitted.
5
Any further information required pursuant to
sub-paragraph must be provided by the party
from whom the information is sought to the appointed
person and to the other appeal parties by the date
specified by the appointed person. The appointed
person must notify the appeal parties of the revised
timetable for the appeal on or before that day. The
revised timetable for the appeal must require
submission of written representations to the
appointed person within ten business days of the
date specified by the appointed person, but must
otherwise be in accordance with the process and time
limits set out in sub-paragraphs to
.
6
On an appeal under this paragraph, the appointed
person may—
a
allow or dismiss the appeal; or
b
reverse or vary any part of the decision of
the discharging authority (whether the appeal
relates to that part of it or not),
and may deal with the application as if it had
been made to the appointed person in the first
instance.
7
The appointed person may proceed to a decision on
an appeal taking into account such written
representations as have been sent within the
relevant time limits and in the sole discretion of
the appointed person such written representations as
have been sent outside of the relevant time
limits.
8
The appointed person may proceed to a decision
even though no written representations have been
made within the relevant time limits, if it appears
to the appointed person that there is sufficient
material to enable a decision to be made on the
merits of the case.
9
The decision of the appointed person on an appeal
is final and binding on the parties, and a court may
entertain proceedings for questioning the decision
only if the proceedings are brought by a claim for a
judicial review.
10
If an approval is given by the appointed person
pursuant to this Part of this Schedule, it is deemed
to be an approval for the purpose of Part 2 of this
Schedule as if it had been given by the discharging
authority. The discharging authority may confirm any
determination given by the appointed person in
identical form in writing, but a failure to give
such confirmation (or a failure to give it in
identical form) is not to be taken to affect or
invalidate the effect of the appointed person's
determination.
11
Save where a direction is given pursuant to
sub-paragraph requiring the costs of the
appointed person to be paid by the discharging
authority, the reasonable costs of the appointed
person are to be met by the applicant.
12
On application by the discharging authority or the
applicant, the appointed person may give directions
as to the costs of the appeal and as to the parties
by whom the costs of the appeal are to be paid. In
considering whether to make any such direction and
the terms on which it is to be made, the appointed
person must have regard to relevant guidance on the
Planning Practice Guidance website or any official
circular or guidance which may from time to time
replace it.
SCHEDULE 2
STREETS SUBJECT TO STREET WORKS
Article 8 (1) Area (2) Street subject to street works Swale Borough A farm track between the two
points marked E and a point marked G and coloured yellow on
figure 2 of the streets and access plan Swale Borough An existing track between the
two points marked A and coloured green on figure 3 of the
streets and access plan Swale Borough An existing track between the
two points marked B and coloured orange on figure 3 of the
streets and access plan Swale Borough An existing track between the
two points marked D and coloured yellow on figure 3 of the
streets and access plan Swale Borough A farm track between the two
points marked E and G and coloured yellow on figure 3 of the
streets and access plan Canterbury City A
farm track between the two points marked F and coloured
yellow on figure 3 of the streets and access plan
SCHEDULE 3
STREETS TO BE TEMPORARILY STOPPED UP
Article 10 (1) Area (2) Street to be temporarily stopped
up (3) Extent of temporary stopping up Swale Borough A farm track coloured yellow on
figure 2 of the streets and access plan Between the two points marked E
and a point marked G and coloured yellow on figure 2 of the
streets and access plan Swale Borough An existing track coloured
green on figure 3 of the streets and access plan Between the two points marked A
on figure 3 of the streets and access plan Swale Borough An existing track coloured
orange on figure 3 of the streets and access plan Between the two points marked B
on figure 3 of the streets and access plan Swale Borough An existing track coloured
yellow on figure 3 of the streets and access plan Between the two points marked D
on figure 3 of the streets and access plan Swale Borough A farm track coloured yellow on
figure 3 of the streets and access plan Between the two points marked E
and G on figure 3 of the streets and access plan Canterbury City A
farm track coloured yellow on figure 3 of the streets and
access plan Between the two points marked F on figure 3 of the streets
and access plan
SCHEDULE 4
PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP
Article 11 (1) Area (2) Public right of way to be temporarily
stopped up (3) Extent of temporary stopping up Swale Borough Footpath ZR 484 (Saxon Shore
Way) Between the points marked A as
shown on figures 2 and 3 of the rights of way plan Swale Borough Footpath ZR 485 Between the points marked B as
shown on figure 2 of the rights of way plan Swale Borough Footpath ZR 488 Between the points marked C as
shown on figure 3 of the rights of way plan Swale Borough Footpath ZR 692 Between the points marked D as
shown on figure 3 of the rights of way plan Canterbury City Footpath CW90 Between the points marked E as
shown on figure 3 of the rights of way plan Canterbury City Footpath CW55 (Saxon Shore Way) Between the points marked F as shown on figure 3 of the
rights of way plan
SCHEDULE 5
LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Article 18 (1) Plot number(s) (2) Work No. (3) Purpose for which rights may be
acquired 3/06, 3/06B, 3/07, 3/07A, 3/07B, 3/08, 3/08A 5
Rights to install, use, protect, inspect, alter,
remove, replace, improve and maintain electrical
underground cables, telecommunications cables and
other services including rights of access without or
without vehicles, plant and machinery for all
purposes in connection with the construction, use,
maintenance and decommissioning of the authorised
development.
Restrictions on erecting buildings or structures,
altering ground levels, planting trees or carrying
out operations or actions (including but not limited
to blasting and piling) which may obstruct,
interrupt, or interfere with the exercise of the
rights.
3/06, 3/10, 3/12, 3/13 7, 9
Rights to use, alter, improve and maintain an
existing means of access including rights of access
with or without vehicles, plant and machinery for
all purposes in connection with the construction,
use, maintenance and decommissioning of the
authorised development.
Restrictions on erecting buildings or structures,
altering ground levels, planting trees or carrying
out operations or actions (including but not limited
to blasting and piling) which may obstruct,
interrupt, or interfere with the exercise of the
rights.
3/11 8
Rights to create, manage, alter, improve and
maintain a habitat management area including rights
of access without or without vehicles, plant and
machinery for all purposes in connection with the
construction, use, maintenance and decommissioning
of the authorised development.
Restrictions on erecting buildings or structures,
altering ground levels or carrying out operations or
actions which may obstruct, interrupt, or interfere
with the exercise of the rights.
1/01, 1/02, 1/03, 1/06, 1/07,
1/08, 1/09, 1/10, 2/01, 2/02, 2/03, 2/05, 2/06, 2/07, 2/08,
2/09, 2/10, 2/11, 2/12, 2/13, 2/14, 2/15, 2/16, 2/17, 2/18,
2/19, 2/20, 2/21, 2/22, 2/23, 2/24, 2/25, 2/26, 2/27, 2/28,
3/01, 3/01A, 3/01B, 3/02, 3/02A, 3/02B, 3/03, 3/03A, 3/03B,
3/10, 3/11, 4/01, 4/02, 4/03, 4/04, 4/05, 4/06 9
Rights to inspect, maintain, repair, alter, remove
and reconstruct the flood defences including rights
of access without or without vehicles, plant and
machinery for all purposes in connection with the
construction, use, maintenance and decommissioning
of the authorised development.
Restrictions on erecting buildings or structures,
altering ground levels or carrying out operations or
actions which may obstruct, interrupt, or interfere
with the exercise of the rights.
SCHEDULE 6
MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR THE
CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS
Article 18
1
The enactments for the time being in force with respect to
compensation for the compulsory purchase of land apply, with the
necessary modifications as respects compensation, in the case of a
compulsory acquisition under this Order of a right by the creation
of a new right or the imposition of a restrictive covenant as they
apply as respects compensation on the compulsory purchase of land
and interests in land.
2
1
Without limitation to the scope of paragraph , the Land Compensation Act
1973 has effect subject to
the modifications set out in sub-paragraph .
2
In section 44(1) (compensation for injurious affection),
as it applies to compensation for injurious affection under
section 7 (measure of compensation in case of severance) of
the 1965 Act as substituted by paragraph 5
a
for the words “land is acquired or taken from”
there is substituted the words “
a right or
restrictive covenant over land is purchased from or
imposed on
” ; and
b
for the words “acquired or taken from him” there
is substituted the words “
over which the right is
exercisable or the restrictive covenant
enforceable
” .
3
1
Without limitation on the scope of paragraph , the 1961 Act has effect
subject to the modification set out in sub-paragraph
(2).
2
For section 5A(5A) (relevant valuation date) of the 1961
Act, substitute—
5A
If—
a
the acquiring authority enters on land for
the purpose of exercising a right in pursuance of
a notice of entry under section 11(1) of the 1965
Act (as modified by paragraph of Schedule 7 to the
Cleve Hill Solar Park Order 2020 );
b
the acquiring authority is subsequently
required by a determination under paragraph 13 of
Schedule 2A to the 1965 Act (as substituted by
paragraph of Schedule 7 to the Cleve Hill
Solar Park Order 2020 ) to acquire an interest in
the land; and
c
the acquiring authority enters on and takes
possession of that land
the authority is deemed for the purposes of
subsection (3)(a) to have entered on that land
where it entered on that land for the purpose of
exercising that right.
.
Application of Part 1 the 1965 Act
4
1
The 1965 Act is to have effect with the modifications
necessary to make it apply to the compulsory acquisition
under this Order of a right by the creation of a new
right, or to the imposition under this Order of a
restrictive covenant, as it applies to the compulsory
acquisition under this Order of land, so that, in
appropriate contexts, references in that Act to land are
read (according to the requirements of the particular
context) as referring to, or as including references
to—
a
the right acquired or to be acquired, or the
restriction imposed or to be imposed; or
b
the land over which the right is or is to be
exercisable, or the restriction is to be
enforceable.
2
Without limitation on the scope of sub-paragraph
(1), Part 1 (compulsory purchase
under Acquisition of Land Act 1946) of the 1965 Act
applies in relation to the compulsory acquisition under
this Order of a right by the creation of a new right or,
in relation to the imposition of a restriction, with the
modifications specified in the following provisions of
this Schedule.
5
For section 7 (measure of compensation in the case of
severance) of the 1965 Act there is substituted the following
section—
7
In assessing the compensation to be paid by the
acquiring authority under this Act, regard shall be
had not only to the extent (if any) to which the
value of the land over which the right is to be
acquired or the restrictive covenant is to be
imposed is depreciated by the acquisition of the
right or the imposition of the covenant but also to
the damage (if any) to be sustained by the owner of
the land by reason of its severance from other land
of the owner, or injuriously affecting that other
land by the exercise of the powers conferred by this
or the special Act.
.
6
The following provisions of the 1965 Act (which state the
effect of a deed poll executed in various circumstances where
there is no conveyance by persons with interests in the land),
that is to say—
a
section 9(4) (failure by owners to convey);
b
paragraph 10(3) of Schedule 1 (owners under
incapacity);
c
paragraph 2(3) of Schedule 2 (absent and untraced
owners); and
d
paragraphs 2(3) and 7(2) of Schedule 4 (common
land),
are so modified as to secure that, as against persons with
interests in the land which are expressed to be overridden by
the deed, the right which is to be compulsorily acquired or the
restrictive covenant which is to be imposed is vested absolutely
in the acquiring authority.
7
Section 11 (powers of entry) of the 1965 Act is so modified as
to secure that, as from the date on which the acquiring
authority has served notice to treat in respect of any right or
restrictive covenant, as well as the notice of entry required by
subsection (1) of that section (as it applies to compulsory
acquisition under article 19), it has power, exercisable in
equivalent circumstances and subject to equivalent conditions,
to enter for the purpose of exercising that right or enforcing
that restrictive covenant (which is deemed for this purpose to
have been created on the date of service of the notice); and
sections 11A (powers of entry: further notices of entry), 11B
(counter-notice requiring possession to be taken on specified
date), 12 (penalty for unauthorised entry) and 13 (entry on
warrant in the event of obstruction) of the 1965 Act is modified
correspondingly.
8
Section 20 (protection for interests of tenants at will, etc.)
of the 1965 Act applies with the modifications necessary to
secure that persons with such interests in land as are mentioned
in that section are compensated in a manner corresponding to
that in which they would be compensated on a compulsory
acquisition under this Order of that land, but taking into
account only the extent (if any) of such interference with such
an interest as is actually caused, or likely to be caused, by
the exercise of the right or the enforcement of the restrictive
covenant in question.
9
Section 22 (protection of acquiring authority's possession
where by inadvertence an estate, right or interest has not been
got in) of the 1965 Act as modified by article 22(4) is so
modified as to enable the acquiring authority, in circumstances
corresponding to those referred to in that section, to continue
to be entitled to exercise the right acquired or restrictive
covenant imposed, subject to compliance with that section as
respects compensation.
10
For Schedule 2A (counter notice requiring purchase of land not
in notice to treat) to the 1965 Act substitute—
SCHEDULE 2A
COUNTER-NOTICE REQUIRING PURCHASE OF LAND
Introduction
1
1
This Schedule applies where an acquiring
authority serve a notice to treat in respect of a
right over, or restrictive covenant affecting, the
whole or part of a house, building or factory and
have not executed a general vesting declaration
under section 4 of the 1981 Act as applied by
article 20 (application of the 1981 Act) of the
Cleve Hill Solar Park Order 2020 in respect of the
land to which the notice to treat relates.
2
But see article 21(3) (acquisition of
subsoil only) of the Cleve Hill Solar Park Order
2020 which excludes the acquisition of subsoil
only from this Schedule.
2
In this Schedule, “ house ” includes any park
or garden belonging to a house.
Counter-notice requiring purchase of
land
3
A person who is able to sell the house,
building or factory (“ the owner ”) may serve a
counter-notice requiring the authority to purchase
the owner's interest in the house, building or
factory.
4
A counter-notice under paragraph 3 must be
served within the period of 28 days beginning with
the day on which the notice to treat was
served.
Response to counter-notice
5
On receiving a counter-notice, the acquiring
authority must decide whether to—
a
withdraw the notice to treat,
b
accept the counter-notice, or
c
refer the counter-notice to the Upper
Tribunal.
6
The authority must serve notice of their
decision on the owner within the period of 3
months beginning with the day on which the
counter-notice is served (“the decision
period”).
7
If the authority decides to refer the
counter-notice to the Upper Tribunal they must do
so within the decision period.
8
If the authority does not serve notice of a
decision within the decision period they are to be
treated as if they had served notice of a decision
to withdraw the notice to treat at the end of that
period.
9
If the authority serves notice of a decision
to accept the counter-notice, the compulsory
purchase order and the notice to treat are to have
effect as if they included the owner's interest in
the house, building or factory.
Determination by the Upper Tribunal
10
On a referral under paragraph 7, the Upper
Tribunal must determine whether the acquisition of
the right or the imposition of the restrictive
covenant would—
a
in the case of a house, building or factory,
cause material detriment to the house, building or
factory, or
b
in the case of a park or garden, seriously
affect the amenity or convenience of the house to
which the park or garden belongs.
11
In making its determination, the Upper
Tribunal must take into account—
a
the effect of the acquisition of the right
or the imposition of the covenant,
b
the use to be made of the right or covenant
proposed to be acquired or imposed, and
c
if the right or covenant is proposed to be
acquired or imposed for works or other purposes
extending to other land, the effect of the whole
of the works and the use of the other land.
12
If the Upper Tribunal determines that the
acquisition of the right or the imposition of the
covenant would have either of the consequences
described in paragraph 10, it must determine how
much of the house, building or factory the
authority ought to be required to take.
13
If the Upper Tribunal determines that the
authority ought to be required to take some or all
of the house, building or factory, the compulsory
purchase order and the notice to treat are to have
effect as if they included the owner's interest in
that land.
14
1
If the Upper Tribunal determines that the
authority ought to be required to take some or all
of the house, building or factory, the authority
may at any time within the period of 6 weeks
beginning with the day on which the Upper Tribunal
makes its determination withdraw the notice to
treat in relation to that land.
2
If the acquiring authority withdraws the
notice to treat under this paragraph they must pay
the person on whom the notice was served
compensation for any loss or expense caused by the
giving and withdrawal of the notice.
3
Any dispute as to the compensation is to be
determined by the Upper Tribunal.
.
SCHEDULE 7
PROTECTIVE PROVISIONS
Article 38
PART 1
PROTECTION FOR ELECTRICITY, GAS, WATER AND SEWERAGE
UNDERTAKERS
Application
1
For the protection of the affected undertakers referred to
in this Part of this Schedule (save for National Grid which
is protected by Part 2 of this Schedule, ... and UKPN which is protected by Part 6 of this
Schedule) the following provisions have effect, unless
otherwise agreed in writing between the undertaker and the
affected undertaker concerned.
2
In this Part of this Schedule—
“ affected undertaker ” means—
any licence holder within the meaning of
Part 1 (electricity supply) of the 1989
Act;
a gas transporter within the meaning of Part
1 (gas supply) of the Gas Act 1986 ;
a water undertaker within the meaning of the
Water Industry Act 1991 ; or
a sewerage undertaker within the meaning of
Part 1 (preliminary) of the Water Industry Act
1991,
for the area of the authorised development
but, for the avoidance of doubt, does not include
the undertaker specified in Part 2 (National Grid)
of this Schedule, and in relation to any
apparatus, means the undertaker to whom it belongs
or by whom it is maintained;
“ alternative apparatus ” means alternative
apparatus adequate to enable the affected
undertaker in question to fulfil its statutory
functions in a manner not less efficient than
previously;
“ apparatus ” means—
in the case of an electricity undertaker,
electric lines or electrical plant (as defined in
the 1989 Act), belonging to or maintained by that
affected undertaker;
in the case of a gas undertaker, any mains,
pipes or other apparatus belonging to or
maintained by a gas transporter for the purposes
of gas supply;
in the case of a water undertaker—
mains, pipes or other apparatus belonging to
or maintained by that affected undertaker for the
purposes of water supply; and
any water mains or service pipes (or part of
a water main or service pipe) that is the subject
of an agreement to adopt made under section 51A
(agreements to adopt water main or service pipe at
future date) of the Water Industry Act
1991;
in the case of a sewerage undertaker—
any drain or works vested in the affected
undertaker under the Water Industry Act 1991;
and
any sewer which is so vested or is the
subject of a notice of intention to adopt given
under section 102(4) (adoption of sewers and
disposal works) of that Act or an agreement to
adopt made under section 104 of that Act,
and includes a sludge main, disposal main
(within the meaning of section 219 (general
interpretation) of that Act) or sewer outfall and
any manholes, ventilating shafts, pumps or other
accessories forming part of any such sewer, drain
or works, and includes any structure in which
apparatus is or is to be lodged or which gives or
will give access to apparatus;
“ functions ” includes powers and duties;
and
“in” in a context referring to apparatus or
alternative apparatus in land includes a reference
to apparatus or alternative apparatus under, over
or upon land.
Precedence of the 1991 Act in respect of apparatus in the
streets
3
This Part of this Schedule does not apply to apparatus in
respect of which the relations between the undertaker and
the affected undertaker are regulated by the provisions of
Part 3 (water supply) of the 1991 Act.
No acquisition etc. except by agreement
4
Regardless of any provision in this Order or anything
shown on the land plan, the undertaker must not acquire any
apparatus otherwise than by agreement.
Removal of apparatus
5
1
If, in the exercise of the powers conferred by
this Order, the undertaker acquires any interest in
any land in which any apparatus is placed, that
apparatus must not be removed under this Part of
this Schedule and any right of an affected
undertaker to maintain that apparatus in that land
must not be extinguished until alternative apparatus
has been constructed and is in operation to the
reasonable satisfaction of the affected undertaker
in question.
2
If, for the purpose of executing any works in, on
or under any land purchased, held, or used under
this Order, the undertaker requires the removal of
any apparatus placed in that land, it must give to
the affected undertaker in question written notice
of that requirement, together with a plan and
section of the work proposed, and of the proposed
position of the alternative apparatus to be provided
or constructed and in that case (or if in
consequence of the exercise of any of the powers
conferred by this Order an affected undertaker
reasonably needs to remove any of its apparatus) the
undertaker must, subject to sub-paragraph
,
afford to the affected undertaker the necessary
facilities and rights for the construction of
alternative apparatus in other land of the
undertaker and subsequently for the maintenance of
that apparatus.
3
If alternative apparatus or any part of such
apparatus is to be constructed elsewhere than in
other land of the undertaker, or the undertaker is
unable to afford such facilities and rights as are
mentioned in sub-paragraph , in the land in
which the alternative apparatus or part of such
apparatus is to be constructed, the affected
undertaker in question must, on receipt of a written
notice to that effect from the undertaker, as soon
as reasonably possible use reasonable endeavours to
obtain the necessary facilities and rights in the
land in which the alternative apparatus is to be
constructed.
4
Any alternative apparatus to be constructed in
land of the undertaker under this Part of this
Schedule must be constructed in such manner and in
such line or situation as may be agreed between the
affected undertaker in question and the undertaker
or in default of agreement settled by arbitration in
accordance with article 35 (arbitration).
5
The affected undertaker in question must, after
the alternative apparatus to be provided or
constructed has been agreed or settled by
arbitration in accordance with article
35 (arbitration) and
after the grant to the affected undertaker of any
such facilities and rights as are referred to in
sub-paragraph or , proceed without unnecessary
delay to construct and bring into operation the
alternative apparatus and subsequently to remove any
apparatus required by the undertaker to be removed
under the provisions of this Part of this
Schedule.
6
Regardless of anything in sub-paragraph
, if
the undertaker gives notice in writing to the
affected undertaker in question that it desires
itself to execute any work, or part of any work in
connection with the construction or removal of
apparatus in any land controlled by the undertaker,
that work, instead of being executed by the affected
undertaker, must be executed by the undertaker
without unnecessary delay under the superintendence,
if given, and to the reasonable satisfaction of the
affected undertaker.
7
Nothing in sub-paragraph authorises the
undertaker to execute the placing, installation,
bedding, packing, removal, connection or
disconnection of any apparatus, or execute any
filling around the apparatus (where the apparatus is
laid in a trench) within 300 millimetres of the
apparatus.
Facilities and rights for alternative apparatus
6
1
Where, in accordance with the provisions of this
Part of this Schedule, the undertaker affords to an
affected undertaker facilities and rights for the
construction and maintenance in land of the
undertaker of alternative apparatus in substitution
for apparatus to be removed, those facilities and
rights must be granted upon such terms and
conditions as may be agreed between the undertaker
and the affected undertaker in question or in
default of agreement settled by arbitration in
accordance with article 35 (arbitration).
2
If the facilities and rights to be afforded by the
undertaker in respect of any alternative apparatus,
and the terms and conditions subject to which those
facilities and rights are to be granted, are in the
opinion of the arbitrator less favourable on the
whole to the affected undertaker in question than
the facilities and rights enjoyed by it in respect
of the apparatus to be removed and the terms and
conditions to which those facilities and rights are
subject, the arbitrator must make such provision for
the payment of compensation by the undertaker to
that affected undertaker as appears to the
arbitrator to be reasonable having regard to all the
circumstances of the particular case.
Retained apparatus
7
1
Not less than 28 days before starting the
execution of any works of the type referred to in
paragraph that are near to, or will or
may affect, any apparatus the removal of which has
not been required by the undertaker under paragraph
,
the undertaker must submit to the affected
undertaker in question a plan, section and
description of the works to be executed.
2
Those works must be executed only in accordance
with the plan, section and description submitted
under sub-paragraph (1) and in accordance with such
reasonable requirements as may be made in accordance
with sub-paragraph by the affected undertaker for
the alteration or otherwise for the protection of
the apparatus, or for securing access to it, and the
affected undertaker is entitled to watch and inspect
the execution of those works.
3
Any requirements made by an affected undertaker
under sub-paragraph must be made within a period
of 21 days beginning with the date on which a plan,
section and description under sub-paragraph
(1) are
submitted to it.
4
If an affected undertaker in accordance with
sub-paragraph and in consequence of the
works proposed by the undertaker, reasonably
requires the removal of any apparatus and gives
written notice to the undertaker of that
requirement, paragraphs to apply as if the removal of the
apparatus had been required by the undertaker under
paragraph .
5
Nothing in this paragraph precludes the undertaker
from submitting at any time or from time to time,
but in no case less than 28 days before commencing
the execution of any works, a new plan, section and
description instead of the plan, section and
description previously submitted, and having done so
the provisions of this paragraph apply to and in
respect of the new plan, section and
description.
6
The undertaker is not required to comply with
sub-paragraph (1) in a case of emergency but in
that case it must give to the affected undertaker in
question notice as soon as is reasonably practicable
and a plan, section and description of those works
as soon as reasonably practicable subsequently and
must comply with sub-paragraph in so far as is
reasonably practicable in the circumstances.
Expenses and costs
8
1
Subject to the following provisions of this
paragraph, the undertaker must repay to an affected
undertaker the reasonable expenses incurred by that
affected undertaker in, or in connection with, the
inspection, removal, alteration or protection of any
apparatus or the construction of any new apparatus
which may be required in consequence of the
execution of any such works as are referred to in
paragraph .
2
There must be deducted from any sum payable under
sub-paragraph (1) the value of any apparatus
removed under the provisions of this Part of this
Schedule, that value being calculated after
removal.
3
If in accordance with the provisions of this Part
of this Schedule—
a
apparatus of better type, of greater
capacity or of greater dimensions is placed in
substitution for existing apparatus of worse type,
of smaller capacity or of smaller dimensions;
or
b
apparatus (whether existing apparatus or
apparatus substituted for existing apparatus) is
placed at a depth greater than the depth at which
the existing apparatus was,
and the placing of apparatus of that type or
capacity or of those dimensions or the placing of
apparatus at that depth, as the case may be, is not
agreed by the undertaker or, in default of
agreement, is not determined by arbitration in
accordance with article 35 (arbitration) to be
necessary, then, if such placing involves cost in
the construction of works under this Part of this
Schedule exceeding that which would have been
involved if the apparatus placed had been of the
existing type, capacity or dimensions, or at the
existing depth, as the case may be, the amount which
apart from this sub-paragraph would be payable to
the affected undertaker in question by virtue of
sub-paragraph (1) must be reduced by the amount
of that excess.
4
For the purposes of sub-paragraph —
a
an extension of apparatus to a length
greater than the length of existing apparatus is
not to be treated as a placing of apparatus of
greater dimensions than those of the existing
apparatus; and
b
where the provision of a joint in a cable is
agreed, or is determined to be necessary, the
consequential provision of a jointing chamber or
of a manhole is to be treated as if it also had
been agreed or had been so determined.
5
An amount which apart from this sub-paragraph
would be payable to an affected undertaker in
respect of works by virtue of sub-paragraph
(1)
must, if the works include the placing of apparatus
provided in substitution for apparatus placed more
than 7 years and 6 months earlier so as to confer on
the affected undertaker any financial benefit by
deferment of the time for renewal of the apparatus
in the ordinary course, be reduced by the amount
which represents that benefit.
9
1
Subject to sub-paragraphs and , if by reason or
in consequence of the construction of any such works
referred to in paragraph , any damage is caused to any
apparatus (other than apparatus the repair of which
is not reasonably necessary in view of its intended
removal for the purposes of those works) or property
of an affected undertaker, or there is any
interruption in any service provided, or in the
supply of any goods, by any affected undertaker, the
undertaker must—
a
bear and pay the cost reasonably incurred by
that affected undertaker in making good such
damage or restoring the supply; and
b
provide reasonable compensation to that
affected undertaker for any other expenses, loss,
damages, penalty or costs incurred by the affected
undertaker,
by reason or in consequence of any such damage or
interruption.
2
Nothing in sub-paragraph (1) imposes any
liability on the undertaker with respect to any
damage or interruption to the extent that it is
attributable to the act, neglect or default of an
affected undertaker, its officers, servants,
contractors or agents.
3
An affected undertaker must give the undertaker
reasonable notice of any such claim or demand and no
settlement or compromise may be made without the
consent of the undertaker which, if it withholds
such consent, will have the sole conduct of any
settlement or compromise or of any proceedings
necessary to resist the claim or demand.
Enactments and agreements
10
Nothing in this Part of this Schedule affects the
provisions of any enactment or agreement regulating the
relations between the undertaker and an affected undertaker
in respect of any apparatus laid or erected in land
belonging to the undertaker on the date on which this Order
is made.
PART 2
FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY UNDERTAKER
Application
1
For the protection of National Grid referred to in this
Part of this Schedule the following provisions will, unless
otherwise agreed in writing between the undertaker and
National Grid, have effect.
Interpretation
2
In this Part of this Schedule—
“ alternative apparatus ” means appropriate
alternative apparatus to the satisfaction of the
National Grid to enable the National Grid to
fulfil its statutory functions in a manner no less
efficient than previously;
“ apparatus ” means electric lines or electrical
plant as defined in the Electricity Act 1989,
belonging to or maintained by National
Grid;
“authorised development” has the same meaning
as in article 2 (interpretation) of this Order
(unless otherwise specified) for the purposes of
this Part of this Schedule and shall include the
use and maintenance of the authorised development
and construction of any works authorised by this
Schedule;
“ commence ” has the same meaning as in article
2 of this Order and commencement shall be
construed to have the same meaning;
“ deed of consent ” means a deed of consent,
crossing agreement, deed of variation or new deed
of grant agreed between the parties acting
reasonably in order to vary and/or replace
existing easements, agreements, enactments and
other such interests so as to secure land rights
and interests as are necessary to carry out,
maintain, operate and use the apparatus in a
manner consistent with the terms of this Part of
this Schedule;
“ functions ” includes powers and duties;
“ ground mitigation scheme ” means a scheme
approved by National Grid (such approval not to be
unreasonably withheld or delayed) setting out the
necessary mitigation measures (if any) for a
ground subsidence event;
“ ground monitoring scheme ” means a scheme for
monitoring ground subsidence which sets out the
apparatus which is to be subject to such
monitoring, the extent of land to be monitored,
the manner in which ground levels are to be
monitored, the timescales of any monitoring
activities and the extent of ground subsidence
which, if exceeded, shall require the undertaker
to submit for National Grid's approval a ground
mitigation scheme;
“ ground subsidence event ” means any ground
subsidence identified by the monitoring activities
set out in the ground monitoring scheme that has
exceeded the level described in the ground
monitoring scheme as requiring a ground mitigation
scheme;
“in” in a context referring to apparatus or
alternative apparatus in land includes a reference
to apparatus or alternative apparatus under, over,
across, along or upon such land;
“maintain” and “maintenance” shall include the
ability and right to do any of the following in
relation to any apparatus or alternative apparatus
of the National Grid including construct, use,
repair, alter, inspect, renew or remove the
apparatus;
“ National Grid ” means National Grid
Electricity Transmission PLC (Company No. 2366977)
whose registered office is at 1-3 Strand, London,
WC2N 5EH;
“plan” or “plans” include all designs,
drawings, specifications, method statements, soil
reports, programmes, calculations, risk
assessments and other documents that are
reasonably necessary properly and sufficiently to
describe and assess the works to be
executed;
“ specified works ” means any of the authorised
development or activities undertaken in
association with the authorised development
which—
will or may be situated over, or within 15
metres measured in any direction of any apparatus
the removal of which has not been required by the
undertaker under paragraph 7(2) or
otherwise; and/or
may in any way adversely affect any
apparatus the removal of which has not been
required by the undertaker under paragraph
7(2) or otherwise.
3
Except for paragraphs (apparatus of National Grid in streets
subject to temporary stopping up), (retained apparatus:
protection of National Grid as electricity undertaker)
(expenses)
and (indemnity)
this Schedule does not apply to apparatus in respect of
which the relations between the undertaker and National Grid
are regulated by the provisions of Part 3 of the 1991
Act.
Apparatus of National Grid in streets subject to temporary
stopping up
4
1
Without prejudice to the generality of any other
protection afforded to National Grid elsewhere in
this Order, where any street is stopped up under
article 10 (temporary stopping up of streets), if
National Grid has any apparatus in the street or
accessed via that street National Grid will be
entitled to the same rights in respect of such
apparatus as it enjoyed immediately before the
stopping up and the undertaker will grant to
National Grid, or will procure the granting to the
National Grid of, legal easements reasonably
satisfactory to National Grid in respect of such
apparatus and access to it prior to the stopping up
of any such street or highway.
2
Notwithstanding the temporary stopping up under
the powers of article 10 (temporary stopping up of
streets), National Grid will be at liberty at all
times to take all necessary access across any such
street and/or to execute and do all such works and
things in, upon or under any such street as may be
reasonably necessary or desirable to enable it to
maintain any apparatus which at the time of the
stopping up or diversion was in that street.
Protective works to buildings
5
1
The undertaker, in the case of the powers
conferred by article 14 (protective work to
buildings), must exercise those powers so as not to
obstruct or render less convenient the access to any
apparatus without the written consent of National
Grid which will not unreasonably be withheld and, if
by reason of the exercise of those powers any damage
to any apparatus (other than apparatus the repair of
which is not reasonably necessary in view of its
intended removal or abandonment) or property of
National Grid or any interruption in the supply of
electricity, the undertaker must bear and pay on
demand the cost reasonably incurred by National Grid
in making good such damage or restoring the supply;
and, subject to sub-paragraph ,
shall—
a
pay compensation to National Grid for any
loss sustained by it; and
b
indemnify National Grid against all claims,
demands, proceedings, costs, damages and expenses
which may be made or taken against or recovered
from or incurred by National Grid, by reason of
any such damage or interruption.
2
Nothing in this paragraph imposes any liability on
the undertaker with respect to any damage or
interruption to the extent that such damage or
interruption is attributable to the act, neglect or
default of National Grid or its contractors or
workmen; and National Grid will give to the
undertaker reasonable notice of any claim or demand
as aforesaid and no settlement or compromise thereof
shall be made by National Grid, save in respect of
any payment required under a statutory compensation
scheme, without first consulting the undertaker and
giving the undertaker an opportunity to make
representations as to the claim or demand.
Acquisition of land
6
1
Regardless of any provision in this Order or
anything shown on the land plans or contained in the
book of reference to the Order, the undertaker may
not acquire any land interest or apparatus or
override any easement or other interest of National
Grid otherwise than by agreement (such agreement not
to be unreasonably withheld).
2
As a condition of agreement between the parties in
sub-paragraph (1), prior to the carrying out of
any part of the authorised works (or in such other
timeframe as may be agreed between the undertaker
and National Grid) that are subject to the
requirements of this Part of this Schedule that will
cause any conflict with or breach the terms of any
easement and/or other legal or land interest of
National Grid and/or affects the provisions of any
enactment or agreement regulating the relations
between the undertaker and National Grid in respect
of any apparatus laid or erected in land belonging
to or secured by the undertaker, the undertaker must
as National Grid reasonably requires enter into such
deeds of consent upon such terms and conditions as
may be agreed between the undertaker and National
Grid acting reasonably and which must be no less
favourable on the whole to National Grid unless
otherwise agreed by National Grid, and it will be
the responsibility of the undertaker to procure
and/or secure the consent and entering into of such
deeds and variations by all other third parties with
an interest in the land at that time who are
affected by such authorised works.
3
The undertaker and National Grid agree that where
there is any inconsistency or duplication between
the provisions set out in this Part of this Schedule
relating to the relocation and/or removal of
apparatus (including but not limited to the payment
of costs and expenses relating to such relocation
and/or removal of apparatus) and the provisions of
any existing easement, rights, agreements and
licences granted, used, enjoyed or exercised by
National Grid as of right or other use in relation
to the apparatus, then the provisions in this Part
of this Schedule shall prevail.
4
Any agreement or consent granted by National Grid
under paragraph or any other paragraph of this
Part of this Schedule, shall not be taken to
constitute agreement under sub-paragraph
(1).
Removal of apparatus
7
1
If, in the exercise of the agreement reached in
accordance with paragraph 6 or in any other
authorised manner, the undertaker acquires any
interest in any Order land in which any apparatus is
placed, that apparatus must not be removed under
this Part of this Schedule and any right of National
Grid to maintain that apparatus in that land must
not be extinguished until alternative apparatus has
been constructed, and is in operation to the
reasonable satisfaction of National Grid in
accordance with sub-paragraphs (2) to
inclusive.
2
If, for the purpose of executing any works
compromised in the authorised development in, on,
under or over any land purchased, held, appropriated
or used under this Order, the undertaker requires
the removal of any apparatus placed in that land, it
must give to National Grid 56 days' advance written
notice of that requirement, together with a plan of
the work proposed, and of the proposed position of
the alternative apparatus to be provided or
constructed and in that case (or if in consequence
of the exercise of any of the powers conferred by
this Order National Grid reasonably needs to remove
any of its apparatus) the undertaker must, subject
to sub-paragraph , afford to National
Grid to its satisfaction (taking into account
paragraph 8(1) below) the necessary
facilities and rights—
a
for the construction of alternative
apparatus in other land of or land secured by the
undertaker; and
b
subsequently for the maintenance of that
apparatus.
3
If alternative apparatus or any part of such
apparatus is to be constructed elsewhere than in
other land of or land secured by the undertaker, or
the undertaker is unable to afford such facilities
and rights as are mentioned in sub-paragraph
(2), in the land in which the
alternative apparatus or part of such apparatus is
to be constructed, National Grid must, on receipt of
a written notice to that effect from the undertaker,
take such steps as are reasonable in the
circumstances in an endeavour to obtain the
necessary facilities and rights in the land in which
the alternative apparatus is to be constructed save
that this obligation shall not extend to the
requirement for National Grid to use its compulsory
purchase powers to this end unless it elects to so
do.
4
Any alternative apparatus to be constructed in
land of or land secured by the undertaker under this
Part of this Schedule must be constructed in such
manner and in such line or situation as may be
agreed between National Grid and the
undertaker.
5
National Grid must, after the alternative
apparatus to be provided or constructed has been
agreed, and subject to the grant to National Grid of
any such facilities and rights as are referred to in
sub-paragraph (2) or , proceed without
unnecessary delay to construct and bring into
operation the alternative apparatus and subsequently
to remove any apparatus required by the undertaker
to be removed under the provisions of this Part of
this Schedule.
Facilities and rights for alternative apparatus
8
1
Where, in accordance with the provisions of this
Part of this Schedule, the undertaker affords to or
secures for National Grid facilities and rights in
land for the construction, use, maintenance and
protection in land of the undertaker of alternative
apparatus in substitution for apparatus to be
removed, those facilities and rights must be granted
upon such terms and conditions as may be agreed
between the undertaker and National Grid and must be
no less favourable on the whole to National Grid
than the facilities and rights enjoyed by it in
respect of the apparatus to be removed unless agreed
by National Grid.
2
If the facilities and rights to be afforded by the
undertaker and agreed with National Grid under
sub-paragraph (1) above in respect of any
alternative apparatus, and the terms and conditions
subject to which those facilities and rights are to
be granted, are less favourable on the whole to
National Grid than the facilities and rights enjoyed
by it in respect of the apparatus to be removed and
the terms and conditions to which those facilities
and rights are subject in the matter will be
referred to arbitration under paragraph
(arbitration) of this Part of this Schedule and the
arbitrator shall make such provision for the payment
of compensation by the undertaker to National Grid
as appears to the arbitrator to be reasonable having
regard to all the circumstances of the particular
case. In respect of the appointment of an arbitrator
under this sub-paragraph article 35 (arbitration) of
this Order shall apply.
Retained apparatus: Protection of National Grid as Electricity
Undertaker
9
1
Not less than 56 days before the commencement of
any authorised development that is near to, or will
or may affect, any apparatus the removal of which
has not been required by the undertaker under
paragraph 7(2) or otherwise and to which
paragraph or applies, the
undertaker must submit to National Grid a plan and
seek from National Grid details of the underground
extent of their electricity tower
foundations.
2
In relation to works which will or may be situated
on, over, under or within (i) 15 metres measured in
any direction of any apparatus, or (ii) involve
embankment works within 15 metres of any apparatus,
the plan to be submitted to National Grid under
sub-paragraph (1) must include a method
statement and describe—
a
the exact position of the works;
b
the level at which these are proposed to be
constructed or renewed;
c
the manner of their construction or renewal
including details of excavation, positioning of
plant;
d
the position of all apparatus;
e
by way of detailed drawings, every
alteration proposed to be made to or close to any
such apparatus;
f
any intended maintenance regimes; and
g
an assessment of risks of rise of earth
issues.
3
In relation to any works which will or may be
situated on, over, under or within 10 metres of any
part of the foundations of an electricity tower or
between any two or more electricity towers, the plan
to be submitted under sub-paragraph (1) must in addition
to the matters set out in sub-paragraph
include a method statement describing—
a
details of any cable trench design including
route, dimensions, clearance to pylon
foundations;
b
demonstration that pylon foundations will
not be affected prior to, during and post
construction;
c
details of load bearing capacities of
trenches;
d
details of cable installation methodology
including access arrangements, jointing bays and
backfill methodology;
e
a written management plan for high voltage
hazard during construction and ongoing maintenance
of the cable route;
f
written details of the operations and
maintenance regime for the cable, including
frequency and method of access;
g
assessment of earth rise potential if
reasonably required by the National Grid's
engineers; and
h
evidence that trench bearing capacity is to
be designed to 26 tonnes to take the weight of
overhead line construction traffic.
4
The undertaker must not commence any works to
which sub-paragraphs (1), , or apply until National Grid has
given written approval of the plan so
submitted.
5
Any approval of National Grid required under
sub-paragraphs (1), , or —
a
may be given subject to reasonable
conditions for any purpose mentioned in
sub-paragraphs or ; and
b
must not be unreasonably withheld.
6
In relation to a work to which sub-paragraphs
(1)
, or
apply, National Grid may require such modifications
to be made to the plans as may be reasonably
necessary for the purpose of securing its apparatus
against interference or risk of damage or for the
purpose of providing or securing proper and
convenient means of access to any apparatus.
7
Works to which this paragraph applies must only be
executed in accordance with the plan, submitted
under sub-paragraph (1) or as relevant sub-paragraphs
,
or
as
approved or as amended from time to time by
agreement between the undertaker and National Grid
and in accordance with such reasonable requirements
as may be made in accordance with sub-paragraphs
,
,
and/or
by National Grid for the alteration or otherwise for
the protection of the apparatus, or for securing
access to it, and National Grid will be entitled to
watch and inspect the execution of those
works.
8
Where National Grid requires any protective works
to be carried out either by itself or by the
undertaker (whether of a temporary or permanent
nature) such protective works, inclusive of any
measures or schemes required and approved as part of
the plan approved pursuant to this paragraph, must
be carried out to National Grid's satisfaction prior
to the commencement of any authorised development
(or any relevant part thereof) to which
sub-paragraph (1) applies and National Grid must
give 56 days' notice of such works from the date of
submission of a plan in line with sub-paragraphs
(1),
,
or
(except in an emergency).
9
If National Grid in accordance with sub-paragraphs
or
and
in consequence of the works proposed by the
undertaker, reasonably requires the removal of any
apparatus and gives written notice to the undertaker
of that requirement, sub-paragraphs (1) to and to shall apply as if
the removal of the apparatus had been required by
the undertaker under paragraph 7(2).
10
Nothing in this paragraph shall preclude the
undertaker from submitting at any time or from time
to time, but in no case less than 56 days before
commencing the execution of the authorised
development, a new plan, instead of the plan
previously submitted, and having done so the
provisions of this paragraph shall apply to and in
respect of the new plan.
11
The undertaker will not be required to comply with
sub-paragraph (1) where it needs to carry out
emergency works as defined in the 1991 Act but in
that case it must give to National Grid notice as
soon as is reasonably practicable and a plan of
those works and must—
a
comply with sub-paragraphs , and insofar as is
reasonably practicable in the circumstances;
and
b
comply with sub-paragraph at all
times.
12
At all times when carrying out any works
authorised under the Order, the undertaker must
comply with National Grid's policies for development
near overhead lines ENA TA 43-8 and the Health and
Safety Executive's guidance note 6 “Avoidance of
Danger from Overhead Lines”.
Expenses
10
1
Subject to the following provisions of this
paragraph, the undertaker shall pay to National Grid
on demand all charges, costs and expenses reasonably
anticipated or incurred by National Grid in, or in
connection with, the inspection, removal, relaying
or replacing, alteration or protection of any
apparatus or the construction of any new apparatus
or alternative apparatus which may be required in
consequence of the execution of any such works as
are referred to in this Part of this Schedule
including without limitation—
a
any costs reasonably incurred or
compensation properly paid in connection with the
acquisition of rights or the exercise of statutory
powers for such apparatus including without
limitation in the event that National Grid elects
to use compulsory purchase powers to acquire any
necessary rights under paragraph ;
b
in connection with the cost of the carrying
out of any diversion work or the provision of any
alternative apparatus;
c
the cutting off of any apparatus from any
other apparatus or the making safe of redundant
apparatus;
d
the approval of plans;
e
the carrying out of protective works, plus a
capitalised sum to cover the cost of maintaining
and renewing permanent protective works;
and
f
the survey of any land, apparatus or works,
the inspection and monitoring of works or the
installation or removal of any temporary works
reasonably necessary in consequence of the
execution of any such works referred to in this
Part of this Schedule.
2
There will be deducted from any sum payable under
sub-paragraph (1) the value of any apparatus
removed under the provisions of this Part of this
Schedule and which is not re-used as part of the
alternative apparatus, that value being calculated
after removal.
3
If in accordance with the provisions of this Part
of this Schedule—
a
apparatus of better type, of greater
capacity or of greater dimensions is placed in
substitution for existing apparatus of worse type,
of smaller capacity or of smaller dimensions;
or
b
apparatus (whether existing apparatus or
apparatus substituted for existing apparatus) is
placed at a depth greater than the depth at which
the existing apparatus was situated,
and the placing of apparatus of that type or
capacity or of those dimensions or the placing of
apparatus at that depth, as the case may be, is not
agreed by the undertaker or, in default of agreement
settled by arbitration in accordance with article 35
(arbitration) of this Order to be necessary, then,
if such placing involves cost in the construction of
works under this Part of this Schedule exceeding
that which would have been involved if the apparatus
placed had been of the existing type, capacity or
dimensions, or at the existing depth, as the case
may be, the amount which apart from this
sub-paragraph would be payable to National Grid by
virtue of sub-paragraph (1) will be reduced by
the amount of that excess save where it is not
possible in the circumstances to obtain the existing
type of apparatus at the same capacity and
dimensions or place at the existing depth in which
case full costs will be borne by the
undertaker.
4
For the purposes of sub-paragraph —
a
an extension of apparatus to a length
greater than the length of existing apparatus will
not be treated as a placing of apparatus of
greater dimensions than those of the existing
apparatus; and
b
where the provision of a joint in a pipe or
cable is agreed, or is determined to be necessary,
the consequential provision of a jointing chamber
or of a manhole will be treated as if it also had
been agreed or had been so determined.
5
An amount which apart from this sub-paragraph
would be payable to National Grid in respect of
works by virtue of sub-paragraph (1) will, if the works
include the placing of apparatus provided in
substitution for apparatus placed more than 7 years
and 6 months earlier so as to confer on National
Grid any financial benefit by deferment of the time
for renewal of the apparatus in the ordinary course,
be reduced by the amount which represents that
benefit.
Indemnity
11
1
Subject to sub-paragraphs and , if by reason or
in consequence of the construction of any works
authorised by this Part of this Schedule or in
consequence of the construction, use, maintenance or
failure of any of the authorised development by or
on behalf of the undertaker or in consequence of any
act or default of the undertaker (or any person
employed or authorised by him) in the course of
carrying out such works (including without
limitation works carried out by the undertaker under
this Part of this Schedule or any subsidence
resulting from any of these works), any damage is
caused to any apparatus or alternative apparatus
(other than apparatus the repair of which is not
reasonably necessary in view of its intended removal
for the purpose of those works) or property of
National Grid, or there is any interruption in any
service provided, or in the supply of any goods, by
National Grid, or National Grid becomes liable to
pay any amount to any third party, the undertaker
will—
a
bear and pay on demand the cost reasonably
incurred by National Grid in making good such
damage or restoring the supply; and
b
indemnify National Grid for any other
expenses, loss, demands, proceedings, damages,
claims, penalty or costs incurred by or recovered
from National Grid, by reason or in consequence of
any such damage or interruption or National Grid
becoming liable to any third party as
aforesaid.
2
The fact that any act or thing may have been done
by National Grid on behalf of the undertaker or in
accordance with a plan approved by National Grid or
in accordance with any requirement of National Grid
as a consequence of the authorised development or
under its supervision will not (unless sub-paragraph
applies), excuse the undertaker from liability under
the provisions of this sub-paragraph where the
undertaker fails to carry out and execute the works
properly with due care and attention and in a
skilful and workman like manner or in a manner that
does not materially accord with the approved plan or
as otherwise agreed between the undertaker and
National Grid.
3
Nothing in sub-paragraph (1) shall impose any
liability on the undertaker in respect of—
a
any damage or interruption to the extent
that it is attributable to the neglect or default
of National Grid, its officers, servants,
contractors or agents; and
b
any part of the authorised development
and/or any other works authorised by this Part of
this Schedule carried out by National Grid as an
assignee, transferee or lessee of the undertaker
with the benefit of this Order pursuant to section
156 (benefit of order granting development
consent) of the 2008 Act or article 5 (consent to
transfer benefit of Order) of the Order subject to
the proviso that once such works become apparatus
(“new apparatus”), any works yet to be executed
and not falling within this sub-section
will be subject to the full terms of this Part of
this Schedule including this paragraph
in
respect of such new apparatus.
4
National Grid must give the undertaker reasonable
notice of any such claim or demand and no settlement
or compromise shall be made, unless payment is
required in connection with a statutory compensation
scheme without first consulting the undertaker and
considering its representations.
5
National Grid must use its reasonable endeavours
to mitigate in whole or in part and to minimise any
costs, expenses, loss, demands, and penalties to
which the indemnity under this paragraph
applies where it is within National Grid's
reasonable ability and control to do so and which
expressly excludes any obligation to mitigate
liability arising from third parties which is
outside of National Grid's control. If reasonably
requested to do so by the undertaker, National Grid
shall provide an explanation of how the claim has
been minimised, where possible.
Enactments and agreements
12
Save to the extent provided for to the contrary elsewhere
in this Part of this Schedule or by agreement in writing
between the undertaker and National Grid, nothing in this
Part of this Schedule shall affect the provisions of any
enactment or agreement regulating the relations between the
undertaker and National Grid in respect of any apparatus
laid or erected in land belonging to the undertaker on the
date on which this Order is made.
Co-operation
13
1
Where in consequence of the proposed construction
of any of the authorised development, the undertaker
or National Grid requires the removal of apparatus
under paragraph 7(2) or National Grid makes
requirements for the protection or alteration of
apparatus under paragraph , the undertaker shall use its
best endeavours to co-ordinate the execution of the
works in the interests of safety and the efficient
and economic execution of the authorised development
and taking into account the need to ensure the safe
and efficient operation of National Grid's
undertaking and National Grid shall use its best
endeavours to co-operate with the undertaker for
that purpose.
2
For the avoidance of doubt whenever National
Grid's consent, agreement or approval to is required
in relation to plans, documents or other information
submitted by the undertaker or the taking of action
by the undertaker, it must not be unreasonably
withheld or delayed.
Access
14
If in consequence of the agreement reached in accordance
with paragraph 6
or the powers granted under this Order the access to any
apparatus is materially obstructed, the undertaker must
provide such alternative means of access to such apparatus
as will enable National Grid to maintain or use the
apparatus no less effectively than was possible before such
obstruction.
Arbitration
15
Save for differences or disputes arising under paragraphs
7(2),
,
8(1) and
any
difference or dispute arising between the undertaker and
National Grid under this Part of this Schedule must, unless
otherwise agreed in writing between the undertaker and
National Grid, be determined by arbitration in accordance
with article 35 (arbitration).
Notices
16
The plans submitted to National Grid by the undertaker
pursuant to paragraph 9(1) must be sent to National Grid Plant
Protection at plantprotection@nationalgrid.com or such
other address as National Grid may from time to time appoint
instead for that purpose and notify to the undertaker in
writing.
PART 3
PROTECTION FOR OPERATORS OF ELECTRONIC COMMUNICATIONS CODE
NETWORKS
1
For the protection of any operator, the following provisions
have effect, unless otherwise agreed in writing between the
undertaker and the operator.
2
In this Part of this Schedule—
“ the 2003 Act ” means the Communications Act
2003;
“ conduit system ” has the same meaning as in the
electronic communications code and references to
providing a conduit system is construed in
accordance with paragraph 1(3A) of that code;
“electronic communications apparatus” has the same
meaning as in the electronic communications
code;
“the electronic communications code” has the same
meaning as in Chapter 1 of Part 2 of the 2003
Act ;
“electronic communications code network”
means—
so much of an electronic communications
network or conduit system provided by an
electronic communications code operator as is not
excluded from the application of the electronic
communications code by a direction under section
106 of the 2003 Act; and
an electronic communications network which
the Secretary of State is providing or proposing
to provide;
“ electronic communications code operator ” means a
person in whose case the electronic communications
code is applied by a direction under section 106 of
the 2003 Act; and
“ operator ” means the operator of an electronic
communications code network.
3
The exercise of the powers of article 26 (statutory
undertakers) are subject to part 10 of Schedule 3A (Undertaker's
works affecting electronic communications apparatus) to the
Communications Act 2003 .
4
1
Subject to sub-paragraphs to , if as the result of the
authorised development or their construction, or of any
subsidence resulting from any of those works—
a
any damage is caused to any electronic
communications apparatus belonging to an operator
(other than apparatus the repair of which is not
reasonably necessary in view of its intended
removal for the purposes of those works, or other
property of an operator); or
b
there is any interruption in the supply of the
service provided by an operator, the undertaker
must bear and pay the cost reasonably incurred by
the operator in making good such damage or
restoring the supply and must—
i
make reasonable compensation to an operator
for loss sustained by it; and
ii
indemnify an operator against claims,
demands, proceedings, costs, damages and expenses
which may be made or taken against, or recovered
from, or incurred by, an operator by reason, or in
consequence of, any such damage or
interruption.
2
Nothing in sub-paragraph (1) imposes any liability on the
undertaker with respect to any damage or interruption to
the extent that it is attributable to the act, neglect
or default of an operator, its officers, servants,
contractors or agents.
3
The operator must give the undertaker reasonable
notice of any such claim or demand and no settlement or
compromise of the claim or demand may be made without
the consent of the undertaker which, if it withholds
such consent, will have the sole conduct of any
settlement or compromise or of any proceedings necessary
to resist the claim or demand.
4
Any difference arising between the undertaker and the
operator under this paragraph must be referred to and
settled by arbitration under article 35
(arbitration).
5
This Part of this Schedule does not apply to—
a
any apparatus in respect of which the relations
between the undertaker and an operator are regulated by
the provisions of Part 3 (street works in England and
Wales) of the 1991 Act; or
b
any damage, or any interruption, caused by
electro-magnetic interference arising from the
construction or use of the authorised
development.
6
Nothing in this Part of this Schedule affects the provisions
of any enactment or agreement regulating the relations between
the undertaker and an operator in respect of any apparatus laid
or erected in land belonging to the undertaker on the date on
which this Order is made.
PART 4
FOR THE PROTECTION OF THE DRAINAGE AUTHORITIES
1
The provisions of this Part have effect for the protection of
a drainage authority unless otherwise agreed in writing between
undertaker and the drainage authority.
2
In this Part—
“ commence ” has the same meaning as in article 2 of
this Order and commencement shall be construed to
have the same meaning;
“ construction ” includes execution, placing,
altering, replacing, relaying and removal; and
“ construct ” and “ constructed ” must be construed
accordingly;
“ drainage authority ” means the drainage board
concerned within the meaning of section 23 of the
Land Drainage Act 1991;
“ drainage work ” means any watercourse including
any land that provides or is expected to provide
flood storage capacity for any watercourse and any
bank, wall, embankment or other structure, or any
appliance, constructed or used for land drainage,
flood defence, sea defence or tidal monitoring
excluding the existing flood defence;
“ ordinary watercourse ” has the meaning given in
the Land Drainage Act 1991 ;
“ plans ” includes sections, drawings,
specifications and method statements;
“ specified work ” means so much of any work or
operation authorised by this Order as is in, on,
under, over or within 16 metres of a drainage work
or is otherwise likely to—
affect any drainage work or the volumetric
rate of flow of water in or flowing to or from any
drainage work;
affect the flow, purity, or quality of water
in any watercourse; or
affect the conservation, distribution or use
of water resources.
3
1
Before beginning to construct any specified work, the
undertaker must submit to the drainage authority plans
of the specified work and such further particulars
available to it as the drainage authority may within 28
days of the submission of the plans reasonably
require.
2
Any such specified work must not be constructed except
in accordance with such plans as may be approved in
writing by the drainage authority or determined under
paragraph .
3
Any approval of the drainage authority required under
this paragraph—
a
must not be unreasonably withheld or
delayed;
b
is deemed to have been given if it is neither
given nor refused within 2 months of the
submission of the plans for approval (or
submission of further particulars if required by
the drainage authority under sub-paragraph
(1)) or,
in the case of a refusal, if it is not accompanied
by a statement of the grounds of refusal;
and
c
may be given subject to such reasonable
requirements as the drainage authority may make
for the protection of any drainage work.
4
The drainage authority must use its reasonable
endeavours to respond to the submission of any plans
before the expiration of the period mentioned in
sub-paragraph .
4
Without limiting paragraph , the requirements which the drainage
authority may make under that paragraph include conditions
requiring the undertaker at its own expense to construct such
protective works, whether temporary or permanent, during the
construction of the specified work (including the provision of
flood banks, walls or embankments or other new works and the
strengthening, repair or renewal of existing banks, walls or
embankments) as are reasonably necessary—
a
to safeguard any drainage work against damage;
or
b
to secure that its efficiency for flood defence
purposes is not impaired and that the risk of flooding
is not otherwise increased,
by reason of any specified work.
5
1
Subject to sub-paragraph , any specified work, and all
protective works required by the drainage authority
under paragraph , must be constructed—
a
without unreasonable delay in accordance with
the plans approved or deemed to have been approved
or settled under this Part; and
b
to the reasonable satisfaction of the drainage
authority,
and an officer of the drainage authority is entitled
to watch and inspect the construction of such
works.
2
The undertaker must give to the drainage
authority—
a
not less than 14 days' notice in writing of
its intention to commence construction of any
specified work; and
b
notice in writing of its completion not later
than 7 days after the date on which it is brought
into use.
3
If the drainage authority reasonably requires, the
undertaker must construct all or part of the protective
works so that they are in place before the construction
of the specified work.
4
If any part of a specified work or any protective work
required by the drainage authority is constructed
otherwise than in accordance with the requirements of
this Part, the drainage authority may by notice in
writing require the undertaker at the undertaker's
expense to comply with the requirements of this Part or
(if the undertaker so elects and the drainage authority
in writing consents, such consent not to be unreasonably
withheld or delayed) to remove, alter or pull down the
work and, where removal is required, to restore the site
to its former condition to such extent and within such
limits as the drainage authority reasonably
requires.
5
Subject to sub-paragraph , if within a reasonable period,
being not less than 28 days from the date when a notice
under sub-paragraph is served on the undertaker, the
undertaker has failed to begin taking steps to comply
with the requirements of the notice and subsequently to
make reasonably expeditious progress towards their
implementation, the drainage authority may execute the
works specified in the notice, and any expenditure
incurred by it in so doing is recoverable from the
undertaker.
6
In the event of any dispute as to whether
sub-paragraph is properly applicable to any
work in respect of which notice has been served under
that sub-paragraph, or as to the reasonableness of any
requirement of such a notice, the drainage authority
must not except in emergency exercise the powers
conferred by sub-paragraph until the dispute has been
finally determined.
6
1
Subject to sub-paragraph the undertaker must from the
commencement of the construction of any specified work
maintain in good repair and condition and free from
obstruction any drainage work that is situated within
the limits of deviation on land held by the undertaker
for the purposes of or in connection with the specified
work, whether or not the drainage work is constructed
under the powers conferred by this Order or is already
in existence.
2
If any drainage work that the undertaker is liable to
maintain is not maintained to the reasonable
satisfaction of the drainage authority, the drainage
authority may by notice in writing require the
undertaker to repair and restore the work, or any part
of such work, or (if the undertaker so elects and the
drainage authority in writing consents, such consent not
to be unreasonably withheld or delayed), to remove the
work and restore the site to its former condition, to
such extent and within such limits as the drainage
authority reasonably requires.
3
If, within a reasonable period being not less than 28
days beginning with the date on which a notice in
respect of any drainage work is served under
sub-paragraph on the undertaker, the
undertaker has failed to begin taking steps to comply
with the reasonable requirements of the notice and has
not subsequently made reasonably expeditious progress
towards their implementation, the drainage authority may
do what is necessary for such compliance and may recover
any expenditure reasonably incurred by it in so doing
from the undertaker.
4
In the event of any dispute as to the reasonableness
of any requirement of a notice served under
sub-paragraph , the drainage authority must not
except in a case of emergency exercise the powers
conferred by sub-paragraph until the dispute has been
finally determined.
5
This paragraph does not apply to—
a
drainage works that are vested in the drainage
authority or that the drainage authority or
another person is liable to maintain and is not
prevented by this Order from so doing; and
b
any obstruction of a drainage work for the
purpose of a work or operation authorised by this
Order and carried out in accordance with the
provisions of this Part.
7
If by reason of the construction of any specified work or of
the failure of any such work the efficiency of any drainage work
for flood defence purposes is impaired, or the drainage work is
otherwise damaged, the impairment or damage must be made good by
the undertaker to the reasonable satisfaction of the drainage
authority and, if the undertaker fails to do so, the drainage
authority may make good the impairment or damage and recover
from the undertaker the expense reasonably incurred by it in
doing so.
8
The undertaker must indemnify the drainage authority in
respect of all costs, charges and expenses that the drainage
authority may reasonably incur, have to pay or may
sustain—
a
in the examination or approval of plans under this
Part;
b
in inspecting the construction of any specified work
or any protective works required by the drainage
authority under this Part; and
c
in carrying out of any surveys or tests by the
drainage authority that are reasonably required in
connection with the construction of the specified
work.
9
1
Without limiting the other provisions of this Part,
the undertaker must indemnify the drainage authority in
respect of all claims, demands, proceedings, costs,
damages, expenses or loss that may be made or taken
against, recovered from or incurred by, the drainage
authority by reason of—
a
any damage to any drainage work so as to
impair its efficiency for the purposes of flood
defence;
b
any raising or lowering of the water table in
land adjoining the authorised development or any
sewers, drains and watercourses; or
c
any flooding or increased flooding of any such
land,
that is caused by the construction of any specified work or
any act or omission of the undertaker, its contractors, agents
or employees whilst engaged on the work.
2
The drainage authority must give to the undertaker
reasonable notice of any such claim or demand, and no
settlement or compromise may be made without the
agreement of the undertaker (such agreement not to be
unreasonably withheld or delayed).
10
The fact that any work or thing has been executed or done by
the undertaker in accordance with a plan approved or deemed to
be approved by the drainage authority, or to its satisfaction,
or in accordance with any directions or award of an arbitrator,
does not relieve the undertaker from any liability under this
Part.
11
Any dispute between the undertaker and the drainage authority
under this Part, if the parties agree, must be determined by
arbitration under article 35 (arbitration).
PART 5
FOR THE PROTECTION OF BLUE TRANSMISSION LONDON ARRAY LIMITED
Application
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interpretation
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Agreements
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Co–operation
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Arbitration
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 6
FOR THE PROTECTION OF UKPN
1
For the protection of UKPN as referred to in this part of this
Schedule the following provisions have effect, unless otherwise
agreed in writing between the undertaker and UKPN.
2
In this part of this Schedule—
“ alternative apparatus ” means alternative
apparatus adequate to enable UKPN to fulfil its
statutory functions in a manner not less efficient
than previously;
“ apparatus ” means electric lines or electrical
plant (as defined in the 1989 Act), belonging to or
maintained by UKPN;
“ functions ” includes powers and duties;
“in”, in a context referring to apparatus or
alternative apparatus in land, includes a reference
to apparatus or alternative apparatus under, over or
upon land; and
“ UKPN ” means South Eastern Power Networks plc
(Company No. 03043097) whose registered office is at
Newington House, 237 Southwark Bridge Road, London
SE1 6NP;
3
This part of this Schedule does not apply to apparatus in
respect of which the relations between the undertaker and UKPN
are regulated by the provisions of Part 3 of the 1991
Act.
4
Regardless of the temporary prohibition or restriction of use
of streets under the powers conferred by article 10 (temporary
stopping up of streets), UKPN is at liberty at all times to take
all necessary access across any such street and to execute and
do all such works and things in, upon or under any such street
as may be reasonably necessary or desirable to enable it to
maintain any apparatus which at the time of the prohibition or
restriction was in that street.
5
Regardless of any provision in this Order or anything shown on
the land plans, the undertaker must not acquire any apparatus
otherwise than by agreement.
6
1
If, in the exercise of the powers conferred by this
Order, the undertaker acquires any interest in any land
in which any apparatus is placed or over which access to
any apparatus is enjoyed or requires that UKPN's
apparatus is relocated or diverted, that apparatus must
not be removed under this part of this Schedule, and any
right of UKPN to maintain that apparatus in that land
and to gain access to it must not be extinguished, until
alternative apparatus has been constructed and is in
operation, and access to it has been provided, to the
reasonable satisfaction of UKPN in accordance with
sub–paragraphs to .
2
If, for the purpose of executing any works in, on or
under any land purchased, held, appropriated or used
under this Order, the undertaker requires the removal of
any apparatus placed in that land, the undertaker must
give to UKPN written notice of that requirement,
together with a plan and section of the work proposed,
and of the proposed position of the alternative
apparatus to be provided or constructed and in that case
(or if in consequence of the exercise of any of the
powers conferred by this Order UKPN reasonably needs to
remove any of its apparatus) the undertaker must,
subject to sub–paragraph , afford to UKPN the necessary
facilities and rights for the construction of
alternative apparatus in other land of the undertaker
and subsequently for the maintenance of that
apparatus.
3
If alternative apparatus or any part of such apparatus
is to be constructed elsewhere than in other land of the
undertaker, or the undertaker is unable to afford such
facilities and rights as are mentioned in sub–paragraph
, in
the land in which the alternative apparatus or part of
such apparatus is to be constructed, UKPN must, on
receipt of a written notice to that effect from the
undertaker, as soon as reasonably possible use
reasonable endeavours to obtain the necessary facilities
and rights in the land in which the alternative
apparatus is to be constructed provided that this
obligation shall not require UKPN to exercise any power
it may have to acquire any land or rights by compulsory
purchase order.
4
Any alternative apparatus to be constructed in land of
the undertaker under this part of this Schedule must be
constructed in such manner and in such line or situation
as may be agreed between UKPN and the undertaker or in
default of agreement settled by arbitration in
accordance with article 35 (arbitration).
5
UKPN must, after the alternative apparatus to be
provided or constructed has been agreed or settled by
arbitration in accordance with article 35 (arbitration),
and after the grant to UKPN of any such facilities and
rights as are referred to in sub-paragraph or , proceed without
unnecessary delay to construct and bring into operation
the alternative apparatus and subsequently to remove any
apparatus required by the undertaker to be removed under
the provisions of this part of this Schedule.
6
Regardless of anything in sub–paragraph , if the undertaker
gives notice in writing to UKPN that it desires itself
to execute any work, or part of any work, in connection
with the construction or removal of apparatus in any
land controlled by the undertaker, that work, instead of
being executed by UKPN, must be executed by the
undertaker without unnecessary delay under the
superintendence, if given, and to the reasonable
satisfaction of UKPN.
7
Nothing in sub–paragraph authorises the undertaker to
execute the placing, installation, bedding, packing,
removal, connection or disconnection of any apparatus,
or execute any filling around the apparatus (where the
apparatus is laid in a trench) within 300 millimetres of
the apparatus.
7
1
Where, in accordance with the provisions of this part
of this Schedule, the undertaker affords to UKPN
facilities and rights for the construction and
maintenance in land of the undertaker of alternative
apparatus in substitution for apparatus to be removed,
those facilities and rights must be granted upon such
terms and conditions as may be agreed between the
undertaker and UKPN or in default of agreement settled
by arbitration in accordance with article 35
(arbitration).
2
If the facilities and rights to be afforded by the
undertaker in respect of any alternative apparatus, and
the terms and conditions subject to which those
facilities and rights are to be granted, are in the
opinion of the arbitrator less favourable on the whole
to UKPN than the facilities and rights enjoyed by it in
respect of the apparatus to be removed and the terms and
conditions to which those facilities and rights are
subject, the arbitrator must make such provision for the
payment of compensation by the undertaker to UKPN as
appears to the arbitrator to be reasonable having regard
to all the circumstances of the particular case.
8
1
Not less than 28 days before starting the execution of
any works in, on or under any land purchased, held,
appropriated or used under this Order that are near to,
or will or may affect, any apparatus the removal of
which has not been required by the undertaker under
paragraph , the undertaker must submit to UKPN
a plan, section and description of the works to be
executed.
2
Those works must be executed only in accordance with
the plan, section and description submitted under
sub–paragraph (1) and in accordance with such
reasonable requirements as may be made in accordance
with sub–paragraph by UKPN for the alteration or
otherwise for the protection of the apparatus, or for
securing access to it, and UKPN is entitled to watch and
inspect the execution of those works.
3
Any requirements made by UKPN under sub–paragraph
must
be made within a period of 21 days beginning with the
date on which a plan, section and description under
sub-paragraph (1) are submitted to it.
4
If UKPN in accordance with sub–paragraph and in consequence
of the works proposed by the undertaker, reasonably
requires the removal of any apparatus and gives written
notice to the undertaker of that requirement, paragraphs
and
apply as
if the removal of the apparatus had been required by the
undertaker under paragraph .
5
Nothing in this paragraph precludes the undertaker
from submitting at any time or from time to time, but in
no case less than 28 days before commencing the
execution of any works, a new plan, section and
description instead of the plan, section and description
previously submitted, and having done so the provisions
of this paragraph apply to and in respect of the new
plan, section and description.
6
The undertaker is not required to comply with
sub–paragraph (1) in a case of emergency but in
that case it must give to UKPN notice as soon as is
reasonably practicable and a plan, section and
description of those works as soon as reasonably
practicable subsequently and must comply with
sub–paragraph in so far as is reasonably
practicable in the circumstances.
9
1
Subject to the following provisions of this paragraph,
the undertaker must repay to UKPN the reasonable
expenses incurred by UKPN in, or in connection with, the
inspection, removal, alteration or protection of any
apparatus or the construction of any new apparatus which
may be required in consequence of the execution of any
such works as are referred to in paragraph 6(2).
2
There is to be deducted from any sum payable under
sub–paragraph (1) the value of any apparatus
removed under the provisions of this part of this
Schedule, that value being calculated after
removal.
3
If in accordance with the provisions of this part of
this Schedule—
a
apparatus of better type, of greater capacity
or of greater dimensions is placed in substitution
for existing apparatus of worse type, of smaller
capacity or of smaller dimensions; or
b
apparatus (whether existing apparatus or
apparatus substituted for existing apparatus) is
placed at a depth greater than the depth at which
the existing apparatus was,
and the placing of apparatus of that type or capacity
or of those dimensions or the placing of apparatus at
that depth, as the case may be, is not agreed by the
undertaker or, in default of agreement, is not
determined by arbitration in accordance with article 35
(arbitration) to be necessary, then, if such placing
involves cost in the construction of works under this
part of this Schedule exceeding that which would have
been involved if the apparatus placed had been of the
existing type, capacity or dimensions, or at the
existing depth, as the case may be, the amount which
apart from this sub-paragraph would be payable to UKPN
by virtue of sub–paragraph (1) is to be reduced by the amount
of that excess.
4
For the purposes of sub–paragraph —
a
an extension of apparatus to a length greater
than the length of existing apparatus is not to be
treated as a placing of apparatus of greater
dimensions than those of the existing apparatus
where such extension is required in consequence of
the execution of any such works as are referred to
in paragraph 6(2); and
b
where the provision of a joint in a cable is
agreed, or is determined to be necessary, the
consequential provision of a jointing chamber or
of a manhole is to be treated as if it also had
been agreed or had been so determined.
5
An amount which apart from this sub-paragraph would be
payable to UKPN in respect of works by virtue of
sub–paragraph (1), if the works include the
placing of apparatus provided in substitution for
apparatus placed more than 7 years and 6 months earlier
so as to confer on UKPN any financial benefit by
deferment of the time for renewal of the apparatus in
the ordinary course, is to be reduced by the amount
which represents that benefit.
10
1
Subject to sub–paragraphs and , if by reason or in consequence
of the construction of any of the works referred to in
paragraph , any damage is caused to any
apparatus (other than apparatus the repair of which is
not reasonably necessary in view of its intended removal
for the purposes of those works) or property of UKPN, or
there is any interruption in any service provided, or in
the supply of any goods, by UKPN, the undertaker
must—
a
bear and pay the cost reasonably incurred by
UKPN in making good such damage or restoring the
supply; and
b
indemnify UKPN for any other expenses, loss,
demands, proceedings, damages, claims, penalty or
costs incurred by or recovered from UKPN,
by reason or in consequence of any such damage or
interruption.
2
Nothing in sub–paragraph (1) imposes any liability on the
undertaker with respect to any damage or interruption to
the extent that it is attributable to the act, neglect
or default of UKPN, its officers, servants, contractors
or agents.
3
UKPN must give the undertaker reasonable notice of any
such claim or demand and no settlement or compromise is
to be made without the consent of the undertaker which,
if it withholds such consent, has the sole conduct of
any settlement or compromise or of any proceedings
necessary to resist the claim or demand.
11
Nothing in this part of this Schedule affects the provisions
of any enactment or agreement regulating the relations between
the undertaker and UKPN in respect of any apparatus laid or
erected in land belonging to the undertaker on the date on which
this Order is made.
12
Any difference under this Part of this Schedule must, unless
otherwise agreed in writing between the undertaker and UKPN, be
determined by arbitration in accordance with article 35
(arbitration).
SCHEDULE 8
DEEMED MARINE LICENCE UNDER THE 2009 ACT
Article 29
PART 1
LICENSED MARINE ACTIVITIES
1
1
In this licence—
“ the 2009 Act ” means the Marine and Coastal
Access Act 2009;
“ authorised deposits ” means the substances
and articles specified in paragraph of Part 1 of this
licence;
“ authorised development ” means the
development and associated development described
in Part 1 of Schedule 1 (authorised development)
of the Order;
“ commence ” means the first carrying out of
any licensed marine activities authorised by this
marine licence;
“ condition ” means a condition in Part 2 of
this licence;
“ environmental statement ” means the document
certified as the environmental statement by the
Secretary of State for the purposes of the
Order;
“ existing flood defence ” means the existing
bund and integrated infrastructure located beneath
the path known as the Saxon Shore Way and to the
north and west of the authorised
development;
“ LAT ” means lowest astronomical tide;
“ licensed activities ” means the activities
specified in Part 1 of this licence;
“ MMO ” means the Marine Management Agency,
the body created under the 2009 Act which is
responsible for the monitoring and enforcement of
this licence;
“the location, order limits and grid
coordinates plan” means the plan certified as the
location, order limits and grid coordinates plan
by the Secretary of State for the purposes of the
Order under article 34 (certification of plans and
documents, etc.);
“ MHWS ” means the highest level which spring
tides reach on average over a period of
time;
“ Order ” means the Cleve Hill Solar Park
Order 2020;
“ undertaker ” means Cleve Hill Solar Park
Limited (company number 08904850);
“ Work No. 9 ” means the work of that
description in Schedule 1 of the Order; and
“ works plan ” means the plan certified as the
works plan by the Secretary of State for the
purposes of the Order.
2
A reference to any statute, order, regulation or
similar instrument is construed as a reference to a
statute, order, regulation or instrument as amended by
any subsequent statute, order, regulation or instrument
or as contained in any subsequent re-enactment.
3
Unless otherwise indicated—
a
all times are taken to be Greenwich Mean Time
(GMT); and
b
all co-ordinates are taken to be latitude and
longitude degrees and minutes to two decimal
places.
4
Except where otherwise notified in writing by the MMO,
notices to the MMO must be sent to—
a
Marine Management Organisation
Marine Licensing
Lancaster House
Newcastle Business Park
Newcastle upon Tyne
NE4 7YH
Tel: 0300 123 1032; and
b
Marine Management Organisation (local
office)
Fish Market
Rock-A-Nore Road
Hastings
East Sussex
TN34 3DW
Details of licensed marine activities
2
1
Subject to the licence conditions, this licence
authorises the undertaker (and any agent or
contractor acting on their behalf) to carry out the
following licensable marine activities under section
66(1) (licensable marine activities) of the 2009 Act
which—
a
form part of, or are related to, the
authorised development; and
b
are not exempt from requiring a marine
licence by virtue of any provision made under
section 74 of the 2009 Act.
2
Such activities are authorised in relation
to—
Work No.9 — works to maintain the existing
flood defence, comprising—
a
inspection;
b
investigation (above MHWS, inclusive of trial
pitting);
c
replacement of expansion joint material;
d
concrete repair (to a standard specified in BS EN
1504);
e
replacement of concrete toe beam;
f
vegetation management (including grass cutting and
removal of larger vegetation);
g
replacement of loose and missing block
work;
h
repair of voids;
i
fencing repair and replacement;
j
servicing outfalls;
k
cleaning outfall ancillary structures;
l
topping up of embankment crest levels at localised
low spots;
m
vermin control;
n
repairs of rutting in crest;
o
repointing of jointed structures;
p
replacing modular blocks;
q
replacement of toe armour as required;
r
reinstatement of timber toe piles;
s
timber groyne plank replacement;
t
replacement of bolts on groyne;
u
placement of timber rubbing boards on
groyne;
v
localised movements of beach material;
w
cleaning/dredging of drainage ditch
channels;
x
replacement of pitching where present;
y
replacement of access structures;
z
painting; and
aa
any other activities required to be undertaken
which—
i
use the same materials as those on the
existing flood defence;
ii
do not alter the plan form or cross section
of the existing flood defence;
iii
do not provide an overall increase or
reduction in flood level; and
iv
do not require excavations of beach material
deeper than 1.5 metres.
3
The substances or articles authorised for deposit at sea
include—
a
iron and steel, copper and aluminium;
b
stone and rock;
c
concrete;
d
sand and gravel;
e
timber;
f
plastic and synthetics;
g
marine coatings; and
h
material extracted from within the offshore Order
limits.
4
The grid coordinates for that part of the authorised
development comprising Work No. 9 are specified below and
more particularly on the location, order limits and grid
coordinates plan—
Point ID Latitude (DMS) Longitude (DMS) Point ID Latitude (DMS) Longitude (DMS) 1 51° 19′ 56.946″
N 0° 54′ 46.089″ E 100 51° 20′32.408″ N 0° 54′ 7.763″ E 2 51° 19′ 58.535″
N 0° 54′ 45.298″ E 101 51° 20′ 33.143″
N 0° 54′ 9.545″ E 3 51° 19′ 58.708″
N 0° 54′ 45.201″ E 102 51° 20′ 34.285″
N 0° 54′ 13.532″ E 4 51° 19′ 59.027″
N 0° 54′ 45.080″ E 103 51° 20′ 35.087″
N 0° 54′ 17.689″ E 5 51° 19′ 59.384″
N 0° 54′ 44.724″ E 104 51° 20′ 35.317″
N 0° 54′ 21.662″ E 6 51° 19′ 59.960″
N 0° 54′ 44.350″ E 105 51° 20′ 37.215″
N 0° 54′ 36.902″ E 7 51° 20′ 1.300″ N 0° 54′ 43.858″ E 106 51° 20′ 37.791″
N 0° 54′ 38.342″ E 8 51° 20′ 2.911″ N 0° 54′ 42.665″ E 107 51° 20′ 37.114″
N 0° 54′ 46.675″ E 9 51° 20′ 3.116″ N 0° 54′ 42.384″ E 108 51° 20′ 37.181″
N 0° 54′ 46.705″ E 10 51° 20′ 4.788″ N 0° 54′ 40.819″ E 109 51° 20′ 37.035″
N 0° 54′ 49.041″ E 11 51° 20′ 4.959″ N 0° 54′ 40.563″ E 110 51° 20′ 36.955″
N 0° 54′ 49.652″ E 12 51° 20′ 5.438″ N 0° 54′ 40.227″ E 111 51° 20′ 36.954″
N 0° 54′ 49.874″ E 13 51° 20′ 6.231″ N 0° 54′ 38.746″ E 112 51° 20′ 36.983″
N 0° 54′ 50.130″ E 14 51° 20′ 6.637″ N 0° 54′ 38.090″ E 113 51° 20′ 36.985″
N 0° 54′ 50.419″ E 15 51° 20′ 7.311″ N 0° 54′ 36.551″ E 114 51° 20′ 36.920″
N 0° 54′ 50.652″ E 16 51° 20′ 7.817″ N 0° 54′ 35.012″ E 115 51° 20′ 37.006″
N 0° 54′ 51.158″ E 17 51° 20′ 8.559″ N 0° 54′ 30.512″ E 116 51° 20′ 37.215″
N 0° 54′ 50.375″ E 18 51° 20′ 8.713″ N 0° 54′ 28.690″ E 117 51° 20′ 37.673″
N 0° 54′ 46.063″ E 19 51° 20′ 8.886″ N 0° 54′ 27.093″ E 118 51° 20′ 38.109″
N 0° 54′ 39.463″ E 20 51° 20′ 8.229″ N 0° 54′ 29.798″ E 119 51° 20′ 36.284″
N 0° 54′ 26.251″ E 21 51° 20′ 7.773″ N 0° 54′ 32.964″ E 120 51° 20′ 35.445″
N 0° 54′ 16.667″ E 22 51° 20′ 6.916″ N 0° 54′ 36.190″ E 121 51° 20′ 34.876″
N 0° 54′ 13.691″ E 23 51° 20′ 5.271″ N 0° 54′ 39.948″ E 122 51° 20′ 33.400″
N 0° 54′ 8.742″ E 24 51° 20′ 1.514″ N 0° 54′ 43.309″ E 123 51° 20′ 32.885″
N 0° 54′ 7.478″ E 25 51° 19′ 59.852″
N 0° 54′ 43.782″ E 124 51° 20′ 32.714″
N 0° 54′ 5.934″ E 26 51° 20′ 11.941″
N 0° 54′ 13.217″ E 125 51° 20′ 32.081″
N 0° 54′ 3.003″ E 27 51° 20′ 11.877″
N 0° 54′ 12.095″ E 126 51° 20′ 36.869″
N 0° 54′ 51.672″E 28 51° 20′ 11.663″
N 0° 54′ 10.398″ E 127 51° 20′ 36.819″
N 0° 54′ 51.640″ E 29 51° 20′ 11.436″
N 0° 54′ 9.385″ E 128 51° 20′ 36.762″
N 0° 54′ 51.642″ E 30 51° 20′ 10.399″
N 0° 54′ 6.406″ E 129 51° 20′ 36.711″
N 0° 54′ 51.724″ E 31 51° 20′ 10.522″
N 0° 54′ 7.338″ E 130 51° 20′ 36.674″
N 0° 54′ 51.969″ E 32 51° 20′ 10.085″
N 0° 53′ 46.895″ E 131 51° 20′ 36.662″
N 0° 54′ 52.243″ E 33 51° 20′ 10.324″
N 0° 53′ 47.052″ E 132 51° 20′ 36.643″
N 0° 54′ 52.308″ E 34 51° 20′ 10.497″
N 0° 53′ 47.265″ E 133 51° 20′ 36.557″
N 0° 54′ 52.486″ E 35 51° 20′ 10.555″
N 0° 53′ 47.377″ E 134 51° 20′ 36.597″
N 0° 54′ 52.469″ E 36 51° 20′ 10.609″
N 0° 53′ 47.678″ E 135 51° 20′ 36.651″
N 0° 54′ 52.486″ E 37 51° 20′ 10.685″
N 0° 53′ 56.589″ E 136 51° 20′ 42.418″
N 0° 55′ 36.744″ E 38 51° 20′ 10.577″
N 0° 53′ 57.633″ E 137 51° 20′ 42.431″
N 0° 55′ 37.288″ E 39 51° 20′ 10.677″
N 0° 53′ 57.274″ E 138 51° 20′ 42.700″
N 0° 55′ 40.210″ E 40 51° 20′ 10.741″
N 0° 53′ 56.919″ E 139 51° 20′ 42.775″
N 0° 55′ 40.607″ E 41 51° 20′ 10.759″
N 0° 53′ 56.703″ E 140 51° 20′ 42.916″
N 0° 55′ 40.911″ E 42 51° 20′ 10.691″
N 0° 53′ 47.644″ E 141 51° 20′ 42.913″
N 0° 55′ 41.691″ E 43 51° 20′ 10.658″
N 0° 53′ 47.286″ E 142 51° 20′ 43.090″
N 0° 55′ 42.369″ E 44 51° 20′ 10.631″
N 0° 53′ 47.191″ E 143 51° 20′ 43.208″
N 0° 55′ 42.254″ E 45 51° 20′ 10.417″
N 0° 53′ 46.970″ E 144 51° 20′ 43.241″
N 0° 55′ 43.046″ E 46 51° 20′ 10.380″
N 0° 53′ 46.880″ E 145 51° 20′ 43.362″
N 0° 55′ 43.772″ E 47 51° 20′ 10.348″
N 0° 53′ 46.718″ E 146 51° 20′ 43.555″
N 0° 55′ 43.598″ E 48 51° 20′ 10.380″
N 0° 53′ 46.503″ E 147 51° 20′ 43.523″
N 0° 55′ 44.092″ E 49 51° 20′ 10.447″
N 0° 53′ 46.302″ E 148 51° 20′ 43.570″
N 0° 55′ 44.669″ E 50 51° 20′ 27.907″
N 0° 53′ 46.744″ E 149 51° 20′ 43.671″
N 0° 55′ 45.270″ E 51 51° 20′ 27.862″
N 0° 53′ 47.043″ E 150 51° 20′ 43.799″
N 0° 55′ 45.070″ E 52 51° 20′ 27.876″
N 0° 53′ 47.230″ E 151 51° 20′ 43.780″
N 0° 55′ 45.567″ E 53 51° 20′ 27.830″
N 0° 53′ 47.672″ E 152 51° 20′ 43.948″
N 0° 55′ 46.756″ E 54 51° 20′ 27.699″
N 0° 53′ 48.253″ E 153 51° 20′ 44.306″
N 0° 55′ 48.368″ E 55 51° 20′ 27.585″
N 0° 53′ 48.411″ E 154 51° 20′ 44.687″
N 0° 55′ 49.791″ E 56 51° 20′ 27.555″
N 0° 53′ 48.435″ E 155 51° 20′ 45.757″
N 0° 55′ 54.594″ E 57 51° 20′ 27.538″
N 0° 53′ 48.625″ E 156 51° 20′ 47.241″
N 0° 56′ 2.207″ E 58 51° 20′ 27.517″
N 0° 53′ 48.660″ E 157 51° 20′ 47.983″
N 0° 56′ 6.651″ E 59 51° 20′ 27.406″
N 0° 53′ 48.710″ E 158 51° 20′ 48.152″
N 0° 56′ 6.491″ E 60 51° 20′ 27.376″
N 0° 53′ 48.744″ E 159 51° 20′ 48.092″
N 0° 56′ 6.958″ E 61 51° 20′ 27.358″
N 0° 53′ 48.805″ E 160 51° 20′ 48.096″
N 0° 56′ 7.304″ E 62 51° 20′ 27.357″
N 0° 53′ 48.852″ E 161 51° 20′ 48.226″
N 0° 56′ 7.918″ E 63 51° 20′ 27.320″
N 0° 53′ 49.159″ E 162 51° 20′ 48.436″
N 0° 56′ 7.698″ E 64 51° 20′ 27.275″
N 0° 53′ 49.275″ E 163 51° 20′ 48.394″
N 0° 56′ 8.208″ E 65 51° 20′ 27.252″
N 0° 53′ 49.310″ E 164 51° 20′ 48.416″
N 0° 56′ 8.607″ E 66 51° 20′ 27.112″
N 0° 53′ 49.343″ E 165 51° 20′ 48.474″
N 0° 56′ 8.816″ E 67 51° 20′ 27.084″
N 0° 53′ 49.434″ E 166 51° 20′ 48.520″
N 0° 56′ 8.981″ E 68 51° 20′ 27.059″
N 0° 53′ 49.665″ E 167 51° 20′ 48.530″
N 0° 56′ 9.101″ E 69 51° 20′ 27.036″
N 0° 53′ 49.798″ E 168 51° 20′ 48.516″
N 0° 56′ 9.227″ E 70 51° 20′ 26.925″
N 0° 53′ 50.097″ E 169 51° 20′ 48.514″
N 0° 56′ 9.358″ E 71 51° 20′ 26.949″
N 0° 53′ 50.133″ E 170 51° 20′ 48.592″
N 0° 56′ 9.802″ E 72 51° 20′ 27.049″
N 0° 53′ 49.908″ E 171 51° 20′ 48.676″
N 0° 56′ 10.128″ E 73 51° 20′ 27.113″
N 0° 53′ 49.705″ E 172 51° 20′ 48.616″
N 0° 56′ 7.869″ E 74 51° 20′ 27.164″
N 0° 53′ 49.465″ E 173 51° 20′ 48.857″
N 0° 56′ 14.026″ E 75 51° 20′ 27.246″
N 0° 53′ 49.429″ E 174 51° 20′ 48.852″
N 0° 56′ 14.100″ E 76 51° 20′ 27.272″
N 0° 53′ 49.410″ E 175 51° 20′ 48.844″
N 0° 56′ 14.168″ E 77 51° 20′ 27.326″
N 0° 53′ 49.330″ E 176 51° 20′ 48.807″
N 0° 56′ 14.326″ E 78 51° 20′ 27.347″
N 0° 53′ 49.270″ E 177 51° 20′ 48.722″
N 0° 56′ 14.640″ E 79 51° 20′ 27.374″
N 0° 53′ 49.080″ E 178 51° 20′ 48.645″
N 0° 56′ 15.364″ E 80 51° 20′ 27.403″
N 0° 53′ 48.953″ E 179 51° 20′ 48.916″
N 0° 56′ 17.077″ E 81 51° 20′ 27.459″
N 0° 53′ 48.796″ E 180 51° 20′ 44.526″
N 0° 56′ 52.481″ E 82 51° 20′ 27.534″
N 0° 53′ 48.775″ E 181 51° 20′ 44.523″
N 0° 56′ 53.111″ E 83 51° 20′ 27.577″
N 0° 53′ 48.731″ E 182 51° 20′ 44.613″
N 0° 56′ 53.520″ E 84 51° 20′ 27.605″
N 0° 53′ 48.666″ E 183 51° 20′ 44.607″
N 0° 56′ 53.654″ E 85 51° 20′ 27.622″
N 0° 53′ 48.491″ E 184 51° 20′ 44.472″
N 0° 56′ 54.152″ E 86 51° 20′ 27.695″
N 0° 53′ 48.408″ E 185 51° 20′ 44.365″
N 0° 56′ 54.631″ E 87 51° 20′ 27.763″
N 0° 53′ 48.293″ E 186 51° 20′ 44.337″
N 0° 56′ 54.961″ E 88 51° 20′ 27.942″
N 0° 53′ 47.338″ E 187 51° 20′ 44.341″
N 0° 56′ 55.338″ E 89 51° 20′ 27.948″
N 0° 53′ 47.235″ E 188 51° 20′ 44.188″
N 0° 56′ 56.399″ E 90 51° 20′ 27.910″
N 0° 53′ 47.165″ E 189 51° 20′ 44.193″
N 0° 56′ 56.709″ E 91 51° 20′ 27.920″
N 0° 53′ 47.052″ E 190 51° 20′ 44.268″
N 0° 56′ 57.174″ E 92 51° 20′ 27.939″
N 0° 53′ 46.941″ E 191 51° 20′ 49.033″
N 0° 56′ 20.247″ E 93 51° 20′ 27.963″
N 0° 53′ 46.853″ E 192 51° 20′ 48.835″
N 0° 56′ 14.262″ E 94 51° 20′ 27.997″
N 0° 53′ 46.798″ E 193 51° 20′ 48.854″
N 0° 56′ 14.137″ E 95 51° 20′ 30.414″
N 0° 53′ 56.932″ E 194 51° 20′ 48.859″
N 0° 56′ 14.060″ E 96 51° 20′ 30.486″
N 0° 53′ 58.149″ E 195 51° 20′ 47.432″
N 0° 56′ 30.037″ E 97 51° 20′ 30.389″
N 0° 53′ 58.557″ E 196 51° 20′ 47.356″
N 0° 56′ 30.457″ E 98 51° 20′ 31.727″
N 0° 54′ 3.734″ E 197 51° 20′ 46.743″
N 0° 56′ 35.249″ E 99 51° 20′ 32.193″
N 0° 54′ 5.976″ E 198 51° 20′ 46.536″
N 0° 56′ 37.296″ E
5
The provisions of section 72 (variation, suspension,
revocation and transfer) of the 2009 Act apply to this
licence except that the provisions of section 72(7) relating
to the transfer of the licence only apply to a transfer not
falling within article 5 (consent to transfer benefit of
Order).
6
With respect to any condition which requires the licensed
activities be carried out in accordance with the plans,
protocols or statements approved under this Schedule, the
approved details, plan or project are taken to include any
amendments that may subsequently be approved in writing by
the MMO.
7
Any amendments to or variations from the approved details
must be in accordance with the principles and assessments
set out in the environmental statement. Such agreement may
only be given in relation to immaterial changes where it has
been demonstrated to the satisfaction of the relevant
planning authority or that other person that the subject
matter of the agreement sought is unlikely to give rise to
any materially new or materially different environmental
effects from those assessed in the environmental
statement.
PART 2
CONDITIONS
Notifications regarding licensed activities
1
The licence holder must inform the MMO in writing of the
commencement of the first licensed activity at least 24
hours prior to such commencement.
2
1
The licence holder must inform the MMO of the name
and function of any agent or contractor appointed to
engage in any licensed activity not less than 24
hours before the commencement of the licensed
activity in question.
2
Any changes to details supplied under
sub-paragraph (1) must be notified to the MMO in
writing prior to the agent, contractor or vessel
engaging in the licensed activity in
question.
3
Only those persons notified to the MMO in
accordance with this condition are permitted to
carry out a licensed activity.
3
The licence holder must ensure that a copy of this
Schedule has been read and understood by any agents and
contractors that will be carrying out any licensed activity
on behalf of the licence holder, as notified to the MMO
under condition 10.
4
Copies of this Schedule must be available for inspection
at the following locations—
a
the licence holder's registered office; and
b
during the construction of the authorised
development only, at any site office which is
adjacent to or near the river and which has been
provided for the purposes of the construction of the
authorised development.
Pollution prevention
5
The licence holder must—
a
not discharge waste concrete slurry or wash water
from concrete, or cement into the marine
environment, and where practicable, site concrete
and cement mixing and washing areas at least 10
metres away from the marine environment and any
surface water drain to minimise the risk of run off
entering the marine environment;
b
store, handle, transport and use fuels,
lubricants, chemicals and other substances so as to
prevent releases into the marine environment,
including bunding or storage of 110% of the total
volume of all reservoirs and containers;
c
report any spill of oil, fuel or chemicals into
the marine area to the MMO Marine Pollution Response
Team (by telephone, within office hours on 0300 200
2024, or outside office hours on 07770 977 825, and
at all times, if no response to calls to those
numbers, on 0345 051 8486 or via email using
dispersants@marinemanagement.org.uk)
within 12 hours of the spill occurring;
d
store all waste in designated areas that are
isolated from surface water drains and open water
and are bunded;
e
use suitable protective sheeting to prevent dust,
debris (including paints and solvents) and rebounded
or windblown concrete from entering the water
environment, and rebounded material must be cleared
away before the sheeting is removed;
f
ensure that any coatings and any treatments are
suitable for use in the marine environment and are
used in accordance with either guidelines approved
by the Health and Safety Executive or the
Environment Agency;
g
not use priority substances and polluting
chemicals listed under the Environmental Quality
Standards Directive during works.
Post-construction
6
The licence holder must remove all temporary structures,
waste and debris associated with the construction activities
within 6 weeks following completion of the final
construction activity.
Maintenance
7
1
Unless otherwise agreed by the MMO, the licenced
activities may not commence until a maintenance plan
has been approved in writing by the MMO.
2
The maintenance plan must be submitted at least 6
weeks prior to the commencement of any maintenance
activity, and must include details of the
maintenance activities required including location,
duration, timings, methodology and materials to be
used.
3
Maintenance activities must be undertaken in
accordance with the agreed plan.
SCHEDULE 9
ARBITRATION RULES
Article 35
Primary objective
1
1
The primary objective of these arbitration rules is to
achieve a fair, impartial, final and binding award on
the substantive difference between the parties (save as
to costs) within 4 months from the date the arbitrator
is appointed pursuant to article 35 of this
Order.
2
The arbitration will be deemed to have commenced when
a party (“the Claimant”) serves a written notice of
arbitration on the other party (“the
Respondent”).
Time periods
2
1
All time periods in these arbitration rules will be
measured in days and this will include weekends, but not
bank or public holidays.
2
Time periods will be calculated from the day after the
arbitrator is appointed which is either—
a
the date the arbitrator notifies the parties
in writing of his/her acceptance of an appointment
by agreement of the parties; or
b
the date the arbitrator is appointed by the
Secretary of State.
Timetable
3
1
The timetable for the arbitration will be that set out
in sub-paragraphs to below unless amended in
accordance with paragraph .
2
Within 14 days of the arbitrator being appointed, the
Claimant will provide both the Respondent and the
arbitrator with—
a
a written Statement of Claim which describes
the nature of the difference between the parties,
the legal and factual issues, the Claimant's
contentions as to those issues, the amount of its
claim and/or the remedy it is seeking;
b
all statements of evidence and copies of all
documents on which it relies, including
contractual documentation, correspondence
(including electronic documents), legal precedents
and expert witness reports.
3
Within 14 days of receipt of the Claimant's statements
under sub-paragraph by the arbitrator and
Respondent, the Respondent will provide the Claimant and
the arbitrator with—
a
a written Statement of Defence responding to
the Claimant's Statement of Claim, its statement
in respect of the nature of the difference, the
legal and factual issues in the Claimant's claim,
its acceptance of any element(s) of the Claimant's
claim, its contentions as to those elements of the
Claimant's claim it does not accept;
b
all statements of evidence and copies of all
documents on which it relies, including
contractual documentation, correspondence
(including electronic documents), legal precedents
and expert witness reports;
c
any objections it wishes to make to the
Claimant's statements, comments on the Claimant's
expert report(s) (if submitted by the Claimant)
and explanations of the objections.
4
Within 7 days of the Respondent serving its statements
under sub-paragraph , the Claimant may make a
Statement of Reply by providing both the Respondent and
the arbitrator with—
a
a written statement responding to the
Respondent's submissions, including its reply in
respect of the nature of the difference, the
issues (both factual and legal) and its
contentions in relation to the issues;
b
all statements of evidence and copies of
documents in response to the Respondent's
submissions;
c
any expert report in response to the
Respondent's submissions;
d
any objections to the statements of evidence,
expert reports or other documents submitted by the
Respondent;
e
its written submissions in response to the
legal and factual issues involved.
Procedure
4
1
The parties' pleadings, witness statements and expert
reports (if any) will be concise. No single pleading
will exceed 30 single-sided A4 pages using 10pt Arial
font.
2
The arbitrator will make an award on the substantive
difference(s) based solely on the written material
submitted by the parties unless the arbitrator decides
that a hearing is necessary to explain or resolve any
matters.
3
Either party may, within 2 days of delivery of the
last submission, request a hearing giving specific
reasons why it considers a hearing is required.
4
Within 7 days of receiving the last submission, the
arbitrator will notify the parties whether a hearing is
to be held and the length of that hearing.
5
Within 10 days of the arbitrator advising the parties
that he/she will hold a hearing, the date and venue for
the hearing will be fixed by agreement with the parties,
save that if there is no agreement the arbitrator is to
direct a date and venue which he/she considers is fair
and reasonable in all the circumstances. The date for
the hearing must not be less than 35 days from the date
of the arbitrator's direction confirming the date and
venue of the hearing.
6
A decision will be made by the arbitrator on whether
there is any need for expert evidence to be submitted
orally at the hearing. If oral expert evidence is
required by the arbitrator, then any expert(s) attending
the hearing may be asked questions by the
arbitrator.
7
There will be no process of examination and
cross-examination of experts, but the arbitrator must
invite the parties to ask questions of the experts by
way of clarification of any answers given by the
expert(s) in response to the arbitrator's questions.
Prior to the hearing the procedure for the expert(s)
will be that—
a
at least 28 days before a hearing, the
arbitrator will provide a list of issues to be
addressed by the expert(s);
b
if more than one expert is called, they will
jointly confer and produce a joint report or
reports within 14 days of the issues being
provided; and
c
the form and content of a joint report must be
as directed by the arbitrator and must be provided
at least 7 days before the hearing.
8
Within 14 days of a hearing or a decision by the
arbitrator that no hearing is to be held, the parties
may by way of exchange provide the arbitrator with a
final submission in connection with the matters in
dispute and any submissions on costs. The arbitrator
must take these submissions into account in the
award.
9
The arbitrator may make other directions or rulings as
considered appropriate in order to ensure that the
parties comply with the timetable and procedures to
achieve an award on the substantive difference within 4
months of the date on which he/she is appointed, unless
both parties otherwise agree to an extension to the date
for the award.
10
If a party fails to comply with the timetable,
procedure or any other direction then the arbitrator may
continue in the absence of a party or submission or
document, and may make a decision on the information
before him/her attaching the appropriate weight to any
evidence submitted beyond any timetable or in breach of
any procedure and/or direction.
11
The arbitrator's award must include reasons. The
parties must accept that the extent to which reasons are
given must be proportionate to the issues in dispute and
the time available to the arbitrator to deliver the
award.
Arbitrator's powers
5
1
The arbitrator has all the powers of the Arbitration
Act 1996, including the non-mandatory sections, save
where modified by these Rules in this Schedule.
2
There must be no discovery or disclosure, except that
the arbitrator is to have the power to order the parties
to produce such documents as are reasonably requested by
another party no later than the Statement of Reply, or
by the arbitrator, where the documents are manifestly
relevant, specifically identified and the burden of
production is not excessive. Any application and orders
should be made by way of a Redfern Schedule without any
hearing.
3
Any time limits fixed in accordance with this
procedure or by the arbitrator may be varied by
agreement between the parties, subject to any such
variation being acceptable to and approved by the
arbitrator. In the absence of agreement, the arbitrator
may vary the timescales and/or procedure—
a
if the arbitrator is satisfied that a
variation of any fixed time limit is reasonably
necessary to avoid a breach of the rules of
natural justice and then;
b
only for such a period that is necessary to
achieve fairness between the parties.
4
On the date the award is made, the arbitrator will
notify the parties that the award is completed, signed
and dated, and that it will be issued to the parties on
receipt of cleared funds for the arbitrator's fees and
expenses.
Costs
6
1
The costs of the arbitration must include the fees and
expenses of the arbitrator, the reasonable fees and
expenses of any experts and the reasonable legal and
other costs incurred by the parties for the
arbitration.
2
Where the difference involves connected/interrelated
issues, the arbitrator will consider the relevant costs
collectively.
3
The final award must fix the costs of the arbitration
and decide which of the parties are to bear them or in
what proportion they are to be borne by the
parties.
4
The arbitrator will award recoverable costs on the
general principle that each party should bear its own
costs, having regard to all material circumstances,
including such matters as exaggerated claims and/or
defences, the degree of success for different elements
of the claims, claims that have incurred substantial
costs, the conduct of the parties and the degree of
success of a party.
Confidentiality
7
1
The parties agree that any hearings in this
arbitration are to take place in private.
2
The parties and arbitrator agree that any matters,
materials, documents, awards, expert reports and the
like are confidential and must not be disclosed to any
third party without prior written consent of the other
party, save for any application to the Courts or where
disclosure is required under any legislative or
regulatory requirement.
SCHEDULE 10
ENVIRONMENTAL STATEMENT SUPPLEMENTS
Article 2 Document Title Date Examination Library
Reference Climate Change Chapter Clarification
Note June 2019 REP2-043 Clarification Note by the Applicant
on Glint / Glare Analysis August 2019 REP3-022 Missing ALC Records August 2019 REP4-034 Clarification Note on Development
Description Chapter July 2019 AS-028 (Appendix E) Clarification Note - Removal
of Northern Access Route Option November 2019 AS-048
(This note is not part of the Order)
This Order grants development consent for, and authorises the construction,
operation and maintenance of a solar generating station and energy storage
facility on land on the north Kent coast approximately 2 km north east of
Faversham and 5 km west of Whitstable together with associated development. This
Order imposes requirements in connection with the development and authorises the
compulsory purchase of land (including rights in land) and the right to use land
and to override easements and other rights.
This Order also grants a deemed marine licence under Part 4 of the Marine and
Coastal Access Act 2009 in connection with the solar park. The marine licence
imposes conditions in connection with the deposits and works for which they
grant consent.
A copy of the plans and book of reference referred to in this Order and
certified in accordance with article 34 (certification of plans and documents,
etc.) may be inspected free of charge on the website of the Planning
Inspectorate (only during periods where restrictions on movement are in place
under the Health Protection (Coronavirus, Restrictions) (England) Regulations
2020 (SI 350)) or at the offices of Cleve Hill Solar Park Ltd at Woodington
House Woodington Road, East Wellow, Romsey, Hampshire, SO51 6DQ.