LEGALDIGMLEGALDIGM
    Back to legal database
    UK
    uk
    2019

    The Access to the Countryside (Coastal Margin) (Newport Bridge to North Gare) Order 2019

    UK Statutory Instrument

    2019 No. 1204 Countryside, England The Access to the Countryside (Coastal Margin) (Newport Bridge to North Gare) Order 2019 Made 2nd September 2019 Coming into force in accordance with article 1 The Secretary of State makes this Order in exercise of the powers conferred by section 3A(10) of the Countryside and Rights of Way Act 2000 . Citation and commencement 1 This Order may be cited as the Access to the Countryside (Coastal Margin) (Newport Bridge to North Gare) Order 2019 and comes into force on the day after the day on which it is made. End of access preparation period 2 1 In relation to land which is coastal margin as a result of the relevant approval, the day appointed as the day on which the access preparation period ends is 17th September 2019. 2 In this article— “the Act” means the National Parks and Access to the Countryside Act 1949 ; “the relevant approval” means the approval by the Secretary of State under section 52(1) of the Act of the relevant report on 21st July 2016; “the relevant report” means the report entitled “Coastal Access Newport Bridge to North Gare” submitted by Natural England to the Secretary of State under sections 51 and 55A of the Act on 23rd March 2016 . Gardiner of Kimble Parliamentary Under Secretary of State Department for Environment, Food and Rural Affairs 2nd September 2019 EXPLANATORY NOTE (This note is not part of the Order) This Order appoints the day on which the access preparation period ends in relation to land which is coastal margin as a result of the approval by the Secretary of State of Natural England’s proposals contained in a report relating to coastal access along the long-distance route from Newport Bridge to North Gare. A copy of the Secretary of State’s notice of approval is available at www.gov.uk or may be obtained by writing to the Commons and Access Team at the Department for Environment, Food and Rural Affairs, Seacole Building, 2 Marsham Street, London SW1P 4DF. An impact assessment has not been prepared in respect of this Order because the assumptions underlying the Order were reflected in the impact assessment which was prepared for the Marine and Coastal Access Act 2009 (c. 23) . It is available at www.gov.uk, or may be obtained by writing to the Commons and Access Implementation Team at the Department for Environment, Food and Rural Affairs at the address given above.

    Related guides, FAQ and contract templates