    2024 No. 809 ELECTRICITY, SCOTLAND The Electricity (Individual Exemption from the Requirement for a Supply Licence) (Green Volt) (Scotland) Order 2024 Made at 9.30 a.m. on 19th July 2024 Laid before Parliament at 2.00 p.m. on 19th July 2024 Coming into force 9th August 2024 The Secretary of State makes this Order in exercise of the powers conferred by section 5(1) and (6)(b) of the Electricity Act 1989 . In accordance with section 5(2) and (3) of that Act, the Secretary of State has given notice of the proposal to make this Order, and has considered any representations made. The Secretary of State has consulted the Scottish Ministers . Citation, commencement, extent and application 1 1 This Order may be cited as the Electricity (Individual Exemption from the Requirement for a Supply Licence) (Green Volt) (Scotland) Order 2024 and comes into force on 9th August 2024. 2 This Order extends to England and Wales and Scotland. 3 This Order applies in relation to Scotland only. Interpretation 2 1 In this Order— “ the Act ” means the Electricity Act 1989; “ generating station area ” means the area delineated by a series of straight lines joining, in the sequence given, the grid locations specified in the table in the Schedule; “ Green Volt offshore generating station ” means the generating station, or that part of the generating station— located in offshore waters approximately 80 kilometres from the coast of Aberdeenshire, Scotland, within the limits of the generating station area, and at which electricity is generated for the purpose of supplying at least one offshore installation; “ Green Volt Offshore Windfarm Limited ” means the company of that name registered in Scotland with company number SC698787; “ offshore installation ” means an installation in offshore waters which is used for the purposes of, or in connection with, an activity in respect of which a licence has been granted or is required to be granted (as the case may be) under section 2 of the Petroleum (Production) Act 1934 or section 3 of the Petroleum Act 1998 (as that section has effect on the date on which this Order comes into force); “ straight line ” means a geodesic line. Exemption from prohibition of unlicensed supply of electricity 3 1 Exemption is granted from section 4(1)(c) of the Act to Green Volt Offshore Windfarm Limited, in respect of electricity which is generated at Green Volt offshore generating station and supplied to an offshore installation. 2 Exemption is granted subject to the conditions set out in article 4. 3 Exemption is granted for a period of 35 years starting with the date on which Green Volt offshore generating station first generates electricity . Conditions of exemption 4 1 Except in circumstances outside its reasonable control, Green Volt Offshore Windfarm Limited must not at any time supply more than 195.5 megawatts of electricity to offshore installations. 2 As soon as reasonably practicable after each reporting period, Green Volt Offshore Windfarm Limited must provide to the Secretary of State a report which includes the information mentioned in paragraph (3) and, where applicable, paragraph (4). 3 A report provided under paragraph (2) must include the following information in respect of the reporting period which precedes the date on which the report is provided— a the name and location of any offshore installation to which Green Volt Offshore Windfarm Limited has supplied electricity under the exemption granted by article 3(1); and b information about each occasion (if any) on which Green Volt Offshore Windfarm Limited has supplied more than 195.5 megawatts of electricity to offshore installations, including the circumstances of such supply. 4 The first report provided under paragraph (2) must also state the date on which Green Volt offshore generating station first generates electricity. 5 In this regulation, “ reporting period ” means the period starting with the date on which this Order comes into force and ending on 31 December 2030, and thereafter each successive period of five years during the period of exemption granted under this Order. Michael Shanks Minister for Energy Department for Energy Security and Net Zero at 9.30 a.m. on 19th July 2024 Schedule Grid Co-ordinates Article 2(1) Table specifying grid locations Grid location Latitude (DMS) Longitude (DMS) 1 57° 54' 58.81021322" N 000° 42' 50.48944215" W 2 57° 54' 58.07506979" N 000° 40' 00.64829502" W 3 57° 55' 56.21013332" N 000° 39' 59.20491179" W 4 57° 55' 18.72462236" N 000° 31' 10.96820013" W 5 57° 51' 32.91694306" N 000° 31' 09.21182223" W 6 57° 49' 59.08890355" N 000° 35' 44.00159003" W 7 57° 49' 59.46502500" N 000° 44' 03.95838927" W 8 57° 51' 54.99993460" N 000° 44' 10.31749026" W 9 57° 51' 57.77087984" N 000° 43' 02.53268803" W 1 57° 54' 58.81021322" N 000° 42' 50.48944215" W Explanatory Note (This note is not part of the Order) Article 3 of this Order grants exemption from the requirements of section 4(1)(c) of the Electricity Act 1989 (which prohibits the unlicensed supply of electricity to any premises) to Green Volt Offshore Windfarm Limited in relation to the supply of electricity from Green Volt offshore generating station to offshore oil and gas facilities. Article 4 contains conditions to which the exemption is subject. A full impact assessment has not been published for this instrument as no significant impact on the private, voluntary or public sector is foreseen (considering where its impact is not in connection with existing levies and charges).

    Related guides, FAQ and contract templates