Beta
uksi/2023/834
uksi/2023/834 — The A303 (Amesbury to Berwick Down) Development Consent Order 2023
Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
2023 No. 834
Infrastructure Planning
The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (revoked)
Made
14th July 2023
Coming into force
4th August 2023
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 1
PRELIMINARY
Citation and commencement
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interpretation
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Disapplication of legislative provisions
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
WORKS PROVISIONS
Principal Powers
Development consent, etc. granted by the Order
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maintenance of the authorised development
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Planning permission
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Limits of deviation
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Streets
Application of the 1991 Act
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Construction and maintenance of new, altered or diverted streets and other structures
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Permanent stopping up of streets and private means of access
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Temporary stopping up and restriction of use of streets
11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Access to works
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Supplemental Powers
Discharge of water
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Protective works to buildings
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Authority to survey and investigate land
15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Removal of human remains
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Felling or lopping of trees and hedgerows
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Maintenance of drainage works
18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 3
POWERS OF ACQUISITION AND POSSESSION OF LAND
Powers of acquisition
Compulsory acquisition of land
19
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compulsory acquisition of land – incorporation of the minerals code
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily
21
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compulsory acquisition of rights
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Private rights over land
23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Power to override easements and other rights
24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Modification of Part 1 of the 1965 Act
25
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Application of the 1981 Act
26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Acquisition of subsoil, etc., only
27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Rights over or under streets
28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Temporary possession of land
Temporary use of land for constructing the authorised development
29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Temporary use of land for maintaining the authorised development
30
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Supplementary
Statutory undertakers
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Apparatus and rights of statutory undertakers in stopped up streets
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Recovery of costs of new connection
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Special category land
34
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compensation
Disregard of certain interests and improvements
35
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Set-off for enhancement in value of retained land
36
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
No double recovery
37
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 4
OPERATIONAL PROVISIONS
Power to operate and use the tunnel
38
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Closing the tunnel
39
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
No apparatus in the tunnel area without consent
40
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Removal of vehicles
41
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Removal of obstructions
42
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dangerous goods
43
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Byelaws relating to the tunnel area
44
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Fixed penalty notices
45
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Classification of roads, etc.
46
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Clearways
47
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Traffic regulation measures
48
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 5
MISCELLANEOUS AND GENERAL
Benefit of the Order
49
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Consent to transfer benefit of Order
50
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Application of landlord and tenant law
51
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Operational land for purposes of the 1990 Act
52
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Defence to proceedings in respect of statutory nuisance
53
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Protective provisions
54
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Certification of plans, etc.
55
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Service of notices
56
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Arbitration
57
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Consents, agreements and approvals
58
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULES
SCHEDULE 1
AUTHORISED DEVELOPMENT
Article 2
In the administrative area of Wiltshire Council
The authorised development is situated in the administrative area of Wiltshire Council.
A nationally significant infrastructure project as defined in sections 14 (nationally significant infrastructure projects: general) and 22 (highways) of the 2008 Act, and associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act, comprising—
Work No. 1 – as shown on sheets 1 to 11 of the works plans and being the construction of a new all-purpose dual carriageway (‘the new A303’) and of improvements to the existing A303 to include—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
d
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
f
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
g
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
h
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 2 – as shown on sheets 3 and 12 of the works plans and comprising—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 3 – as shown on sheets 2, 3, 4 and 5 of the works plans and being the improvement of the existing A303, to include—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 4 – as shown on sheets 5, 14 and 15 of the works plans and being the realignment of the existing A360 and forming part of the new Longbarrow Junction, to include—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
d
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
f
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
g
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
h
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 5 – as shown on sheet 13 of the works plans and being the realignment and change to vehicle priority layout at the Rollestone Cross junction, to include—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
d
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 6 – as shown on sheets 5, 6, 7 and 8 of the works plans and being the conversion of part of the existing A303 to a new restricted byway, to include—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 7 – as shown on sheet 11 of the works plans and being the realignment of part of the existing unclassified Allington Track, to include—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
d
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
f
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
g
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 8 – as shown on sheets 3 and 12 of the works plans and being—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Work No. 9 – as shown on sheets 9 and 10 of the works plans and being the extension of two existing substations and related electricity cabling for provision of power to the authorised development.
Ancillary Works
For the purposes of or in connection with the construction of any of the works and other development mentioned above, ancillary or related development which does not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement, consisting of—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 2
REQUIREMENTS
Article 4
PART 1
REQUIREMENTS
Interpretation
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Time limits
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preparation of detailed design, etc.
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Outline Environmental Management Plan
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Archaeology
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Protected species
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contaminated land and groundwater
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Implementation and maintenance of landscaping
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Traffic management
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Drainage
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details of consultation
11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Stone curlew breeding plots
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
PROCEDURE FOR DISCHARGE OF REQUIREMENTS
Applications made under requirements
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Determination of applications by the planning authority
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Further information
15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Register of requirements
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Anticipatory steps towards compliance with any requirement
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 3
PERMANENT STOPPING UP OF HIGHWAYS AND PRIVATE MEANS OF ACCESS AND PROVISION OF NEW HIGHWAYS AND PRIVATE MEANS OF ACCESS
Article 10
Note: In relating this Schedule 3 to its corresponding rights of way and access plans, the provisions described in Schedule 3 are shown on the rights of way and access plans in the following manner—
a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
c
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
d
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
e
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 1
HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
HIGHWAYS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 3
PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW PRIVATE MEANS OF ACCESS WHICH ARE OTHERWISE TO BE PROVIDED
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 4
PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 4
LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED
Article 22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 5
MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR THE CREATION OF NEW RIGHTS
Article 22(6) and (7)
Compensation enactments
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Application of the 1965 Act
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 6
LAND IN WHICH ONLY SUBSOIL OR NEW RIGHTS IN AND ABOVE SUBSOIL AND SURFACE MAY BE ACQUIRED
Article 27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 7
LAND OF WHICH ONLY TEMPORARY POSSESSION MAY BE TAKEN
Article 29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 8
BYELAWS
Article 44
PART 1
PRELIMINARY
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interpretation
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
CONDUCT AND BEHAVIOUR
Smoking etc.
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Unacceptable behaviour
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 3
EQUIPMENT AND SAFETY
General safety
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 4
ACCESS AND TRAFFIC
Unauthorised access and loitering
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Traffic regulation
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dangerous goods
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 5
ENFORCEMENT, ETC.
Name and address
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compliance with instructions and notices, etc.
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Identification of authorised persons
11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Breaches by authorised persons
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attempted breach
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 9
CLASSIFICATION OF ROADS ETC.
Article 46
PART 1
THE NEW AND IMPROVED A303 TRUNK ROAD
In the administrative area of Wiltshire Council—
An 11.6 kilometre length of new road
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
THE NEW LONGBARROW JUNCTION AND THE SLIP ROADS
In the administrative area of Wiltshire Council—
A303 eastbound diverge slip road
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A303 eastbound merge slip road
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A303 westbound diverge slip road
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A303 westbound merge slip road
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 3
THE NEW LONGBARROW JUNCTION AND LINK ROADS
In the administrative area of Wiltshire Council—
A360 northern link to new Longbarrow junction
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Northbound and Southbound Link between the new northern and southern roundabouts at Longbarrow Junction
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A360 south-eastern link to new Longbarrow junction
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
South-western link to new Longbarrow junction
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 4
THE NEW ROLLESTONE CROSS
In the administrative area of Wiltshire Council—
A 230 metre length of new road (B3086 northbound approach)
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A 135 metre length of new road (Unclassified westbound approach)
11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A 140 metre length of new road (B3086 eastbound approach)
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 5
THE NEW B3083
In the administrative area of Wiltshire Council—
A 725 metre length of new road (realigned B3083)
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 6
THE NEW COUNTESS JUNCTION SLIP ROADS
In the administrative area of Wiltshire Council—
A303 eastbound diverge slip road
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A303 eastbound merge slip road
15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A303 westbound diverge slip road
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A303 westbound merge slip road
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 7
THE EXISTING A303
In the administrative area of Wiltshire Council—
A 570 metre length of existing A303 trunk road
18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A 350 metre length of existing A303 trunk road
19
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A 1.24 kilometre length of existing A303 trunk road
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A 345 metre length of existing A303 trunk road
21
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 8
THE NEW ALLINGTON TRACK LINK ROAD
In the administrative area of Wiltshire Council—
A 985 metre length of new road
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 9
ROADS TO BE DE-TRUNKED
In the administrative area of Wiltshire Council—
A 2.28 kilometre length of the existing A303 trunk road
23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
A 345 metre length of the existing A303 trunk road
24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 10
TRAFFIC REGULATION MEASURES
Articles 47 and 48
Note 1: The naming conventions used in this Schedule to describe roads, junctions and structures relate to the naming conventions used in the labels on the traffic regulation measures plans.
Note 2: References to the national speed limit in column (3) of the table in Part 1 of this Schedule are references to the maximum speed limits specified under the 1984 Act and to provision made, or deemed to have been made, under the 1984 Act.
PART 1
SPEED LIMITS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
CLEARWAYS AND PROHIBITIONS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 3
REVOCATIONS AND VARIATIONS OF EXISTING TRAFFIC REGULATION ORDERS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 11
PROTECTIVE PROVISIONS
Articles 31 and 54
PART 1
FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 2
FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
12
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 3
FOR THE PROTECTION OF DRAINAGE AUTHORITIES
16
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
25
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
26
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
27
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 4
FOR THE PROTECTION OF ESSO PETROLEUM COMPANY LIMITED
Application
28
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Interpretation
29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Acquisition of apparatus
30
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Removal of apparatus and rights for alternative apparatus
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Facilities and rights for alternative apparatus
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Retained apparatus: protection
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cathodic protection testing
34
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Expenses
35
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Damage to property and other losses
36
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Co-operation and reasonableness
37
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Miscellaneous
38
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 5
FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
39
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
40
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
41
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
42
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
43
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
44
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
45
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
46
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
47
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
48
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
49
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
SCHEDULE 12
DOCUMENTS TO BE CERTIFIED
Articles 2 and 55
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .