LEGALDIGMLEGALDIGM
    ← United Kingdom
    uksi/2020/329

    uksi/2020/329 — The Dogger Bank Creyke Beck Offshore Wind Farm (Amendment) Order 2020

    Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    2020 No. 329 Infrastructure Planning The Dogger Bank Creyke Beck Offshore Wind Farm (Amendment) Order 2020 Made 20th March 2020 Coming into force 23rd March 2020 An application has been made, under paragraph 2 of Schedule 6 to the Planning Act 2008 , to the Secretary of State in accordance with part 1 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change to the Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (the “2015 Order”) . The Secretary of State, having considered the application, the responses to the publicity and consultation required by regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the 2015 Order. Accordingly, the Secretary of State, in exercise of the powers in paragraph 2 of Schedule 6 to the Planning Act 2008, makes the following Order: Citation and commencement 1 This Order may be cited as the Dogger Bank Creyke Beck Offshore Wind Farm (Amendment) Order 2020 and comes into force on 23rd March 2020. Amendment to the Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 2 The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 is amended in accordance with this Order. Amendments to Part 1 (Authorised development) of Schedule 1 (Authorised project) 3 1 Part 1 (Authorised development) of Schedule 1 (Authorised project), is amended as follows. 2 In the description of Project A offshore works, in paragraph (a) of the description of Work No. 1A, for “up to 1.2 gigawatts”, substitute “more than 100 megawatts”. 3 In the description of Project B offshore works, in paragraph (a) of the description of Work No. 1B, for “up to 1.2 gigawatts” substitute “more than 100 megawatts”. Amendment to Part 3 (Requirements) of Schedule 1 (Authorised project) 4 1 Part 3 (Requirements) of Schedule 1 (Authorised project) is amended as follows. 2 In paragraph 4(2), for the words “must be of such a size that if they were installed to the maximum permitted gross generating capacity specified for those works the total rotor-swept area for each Work No. would not exceed 4.35 square kilometres”, substitute “must not exceed a total rotor-swept area for each Work No. of 4.35 square kilometres”. Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy Emily Bourne Director Energy Development and Resilience Department for Business, Energy and Industrial Strategy 20th March 2020 EXPLANATORY NOTE (This note is not part of the Order) This Order amends the Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 ( S.I. 2015/318 ), a development consent order under the Planning Act 2008 (c. 29) , following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 ( S.I. 2011/2055 ) for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008. This Order removes reference to a specific permitted electrical output capacity.

    Related guides, FAQ and contract templates