    uksi/2020/1185 — The Offshore Installations (Safety Zones) (No. 2) Order 2020

    Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    2020 No. 1185 Offshore Installations The Offshore Installations (Safety Zones) (No. 2) Order 2020 Made 28th October 2020 Coming into force in accordance with article 1(2) The Secretary of State makes this Order— in exercise of the powers conferred by section 22 of the Petroleum Act 1987 ; and for the purpose of giving effect to proposals submitted by the Health and Safety Executive under section 24(2A) of that Act. Citation and commencement 1 1 This Order may be cited as the Offshore Installations (Safety Zones) (No. 2) Order 2020. 2 This Order comes into force 21 days after the day on which it is made (“the general coming into force date”), except for article 2(2) which comes into force as provided in article 2(3). Establishment of safety zones 2 1 A safety zone is established around each installation specified in column 1 of the table in Part 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of the table in Part 1 of the Schedule. 2 A safety zone is established around the installation specified in column 1 of the table in Part 2 of the Schedule (being an installation to be stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres, as respects that installation, from the point which has the co-ordinates of latitude and longitude according to the World Geodetic System 1984 specified in columns 2 and 3 of the table in Part 2 of the Schedule. 3 Paragraph (2) comes into force, as respects the installation— a on the general coming into force date, where the installation arrives at its station before that date; and b when the installation arrives at its station, in any other case. Amendment of the Offshore Installations (Safety Zones) (No.2) Order 2019 3 1 The Offshore Installations (Safety Zones) (No.2) Order 2019 is amended as follows. 2 In the Schedule (installations), in Part 2, omit the entry relating to “Well WPOZ”. Mims Davies Parliamentary Under Secretary of State Department of Work and Pensions 28th October 2020 SCHEDULE INSTALLATIONS Article 2 PART 1 Installations stationed at the time this Order is made (1) Name or other designation (2) Latitude (3) Longitude Amethyst A1D, Amethyst, Block 47/14a 53° 36.63’N 00° 43.35’E Amethyst A2D, Amethyst, Block 47/14a 53° 37.35’N 00° 47.35’E Amethyst B1D, Amethyst, Block 47/15a 53° 33.66’N 00° 52.63’E Amethyst C1D, Amethyst, Block 47/14a 53° 38.70’N 00° 36.13’E Callanish (F5) Subsea, Callanish, Block 15/29b 57° 59.521’N 00° 45.116’E Columbus Tie-In Structure, Lomond (Columbus), Block 23/16f 57° 20.940’N 02° 05.105’E DUTA Structure, Huntington, Block 22/14b 57° 36.85’N 01° 38.40’E Penguins Riser Base Manifold, Penguins, Block 211/13a 61° 35.20’N 01° 32.72’E Seagull Well 22/29c-JA, Seagull, Block 22/29c 57° 09.23’N 01° 40.40’E Solan Well P3, Solan, Block 205/26a 60° 03.59’N 03° 59.56’W PART 2 Installations not stationed at the time this Order is made (1) Name or other designation (2) Latitude (3) Longitude Elgood Wellhead, Elgood, Block 48/22c 53° 18.331’N 01° 23.171’E EXPLANATORY NOTE (This note is not part of the Order) Article 2 of this Order establishes, under section 22 of the Petroleum Act 1987 (c. 12) (“the Act”), safety zones having a radius of 500 metres from the specified point around the 11 installations (which are subsea installations) specified in the Schedule to this Order stationed, or to be stationed, in waters to which section 21(7) of that Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c. 29) ). An automatic safety zone is currently established around each of the installations known respectively as Amethyst A1D, Amethyst A2D, Amethyst B1D and Amethyst C1D. It is intended that each of these installations will be dismantled by 31st December 2025. In accordance with section 21(3) of the Act, an automatic safety zone will cease to apply to an installation where, relevantly for these purposes, an order made under section 22 of the Act applies. In order to maintain a safety zone around these installations as they are dismantled, the automatic safety zones will be replaced and replicated by the safety zones established by this Order. Section 23(1) of the Act prohibits vessels, which for these purposes include hovercraft, submersible apparatus and installations in transit, from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Act (currently regulation 21H of the Offshore Installations and Pipeline Works (Management and Administration) Regulations 1995 ( S.I. 1995/738 ), inserted by paragraph 14 of Schedule 13 to S.I. 2015/398 ). It is estimated that the installation specified in the table in Part 2 of the Schedule (Elgood Wellhead) will arrive at its station at the earliest by January 2021. Article 3 amends the Offshore Installations (Safety Zones) (No.2) Order 2019 ( S.I. 2019/116 ) to omit, from Part 2 of the Schedule to that Order, the reference to Well WPOZ.

    Related guides, FAQ and contract templates