LEGALDIGMLEGALDIGM
    ← United Kingdom
    uksi/2019/570

    uksi/2019/570 — The A1 Trunk Road (Grantham Southern Growth Corridor) (Slip Roads) Order 2019

    Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    2019 No. 570 Highways, England The A1 Trunk Road (Grantham Southern Growth Corridor) (Slip Roads) Order 2019 Made 12th March 2019 Coming into force 29th March 2019 The Secretary of State for Transport makes this Order in exercise of powers conferred by sections 10 and 41 of the Highways Act 1980 and now vested in him : 1 This Order may be cited as the A1 Trunk Road (Grantham Southern Growth Corridor) (Slip Roads) Order 2019 and shall come into force on 29th March 2019. 2 In this Order all measurements of distance are measured along the route of the relevant highway. 3 In this Order – “the new trunk roads” means the new slip roads; “the plan” means the plan numbered HE546639-MOU-HAC-A1_3_GSJ_SK_D-001 marked “The A1 Trunk Road (Grantham Southern Growth Corridor) (Slip Roads) Order 2019”, signed by authority of the Secretary of State for Transport and deposited at Document Deposit Service, Communities and Local Government, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA; and “the slip roads” means the new highways which are proposed to be constructed along the routes described in the Schedule to this Order. 4 The slip roads shall become trunk roads from the date when this Order comes into force. 5 The centre line of each of the new trunk roads is indicated by a heavy black line on the plan. 6 The Secretary of State directs that Highways England Company Limited will be the highway authority for the new trunk roads. 7 The Secretary of State directs as respects any part of a highway which crosses the route of any of the new trunk roads that – a where the highway is maintained at the public expense by a local highway authority, the part in question shall be maintained by that authority, and b where the highway is not so maintainable and is not maintainable under a special enactment or by reason of tenure, enclosure or prescription, neither the Secretary of State nor Highways England shall be under a duty to maintain the part in question, until, in either case, a date to be specified in a notice given by the Secretary of State to the highway authority for that highway. The date specified will not be later than the date on which the relevant route is opened for traffic. Signed by authority of the Secretary of State for Transport Simon Connick A Senior Civil Servant in the Department for Transport 12th March 2019 SCHEDULE ROUTES OF THE SLIP ROADS Article 3 The routes of the slip roads are as follows: a A route to connect the northbound carriageway of the trunk road with a new roundabout. The exit slip road (A-B) along this route is given the reference number 1 on the plan. b A route to connect a new roundabout with the northbound carriageway of the trunk road. The entry slip road (B-C) along this route is given the reference number 2 on the plan. c A route to connect the southbound carriageway of the trunk road with a new roundabout. The exit slip road (D-E) along this route is given the reference number 3 on the plan. d A route to connect a new roundabout with the southbound carriageway of the trunk road. The entry slip road (E-F) along this route is given the reference number 4 on the plan. EXPLANATORY NOTE (This note is not part of the Order) This Order authorises Highways England Company Limited to construct 4 new slip roads to connect the A1 Trunk Road to the new Grantham Southern Relief Road being constructed by Lincolnshire County Council. This will create a southern entry to Grantham and also to the site known as the ‘King 31 Development’. Highways England Company Limited as highways authority for the A1 Trunk Road intends to give authority under Section 6 of the Highways Act 1980 to Lincolnshire County Council allowing the council to carry out works on the trunk road network.

    Related guides, FAQ and contract templates