    uksi/2019/1358 — The Northampton Gateway Rail Freight Interchange Order 2019

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    2019 No. 1358 Infrastructure Planning The Northampton Gateway Rail Freight Interchange Order 2019 Made 9th October 2019 Coming into force 30th October 2019 An application has been made to the Secretary of State under section 37 of the Planning Act 2008 (“the 2008 Act”) in accordance with the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 for an order granting development consent. The application was examined in accordance with Chapter 4 of Part 6 of the 2008 Act and the Infrastructure Planning (Examination Procedure) Rules 2010 by a Panel of three members (“the Panel”) appointed by the Secretary of State in accordance with Chapter 2 of Part 6 of the 2008 Act. The Panel, having examined the application with the documents that accompanied the application, and the representations made and not withdrawn, has, in accordance with section 74(2) of the 2008 Act, made a report and recommendation to the Secretary of State. The Secretary of State, having considered the representations made and not withdrawn and the report of the Panel, has decided to make an Order granting development consent for the development described in the application with modifications which in the opinion of the Secretary of State do not make any substantial change to the proposals comprised in the application. The Secretary of State in exercise of the powers conferred by section 114, 115, 117, 120 and 122 of, and paragraphs 1 to 3, 10 to 15, 17, 19, 20, 22 to 24, 26, 33 to 37 of Schedule 5 to, the 2008 Act, makes the following Order— PART 1 PRELIMINARY Citation and Commencement 1 This Order may be cited as the Northampton Gateway Rail Freight Interchange Order 2019 and comes into force on 30th October 2019. Interpretation 2 1 In this Order— “the 1961 Act” means the Land Compensation Act 1961 ; “the 1965 Act” means the Compulsory Purchase Act 1965 ; “the 1980 Act” means the Highways Act 1980 ; “the 1981 Act” means the Compulsory Purchase (Vesting Declarations) Act 1981 ; “the 1984 Act” means the Road Traffic Regulation Act 1984 ; “the 1990 Act” means the Town and Country Planning Act 1990 ; “the 1991 Act” means the New Roads and Street Works Act 1991 ; “the 1996 Regulations” means the Noise Insulation (Railways and Other Guided Transport Systems) Regulations 1996 ; “the 2008 Act” means the Planning Act 2008 ; “the 2010 Regulations” means the Community Infrastructure Levy Regulations 2010 ; “the 2017 EIA Regulations” means the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 ; “access and rights of way plans” means the plans of that description referred to in Schedule 16 (certification of plans and documents) and certified as the access and rights of way plans by the Secretary of State for the purposes of this Order; “address” includes any number or address used for the purposes of electronic transmission; “apparatus” for the purposes of article 8 (street works) and article 36 (apparatus and rights of statutory undertakers in stopped up streets) has the same meaning as in Part 3 of the 1991 Act; “arboricultural assessment” means the arboricultural assessment contained in appendix 4.3 of the environmental statement; “authorised activity” means for the purpose of article 27 (power to override easements and other rights)— the erection, construction, carrying out or maintenance of any building or works on land; the erection, construction or maintenance or anything in, on, over or under land; or the use of any land; “authorised development” means the development described in Schedule 1 (authorised development) and any other development authorised by this Order, which is development within the meaning of section 32 (meaning of development) of the 2008 Act and any works carried out under the requirements; “book of reference” means the document of that description referred to in Schedule 16 and certified as the book of reference by the Secretary of State for the purposes of this Order; “bridleway” has the same meaning as in the 1980 Act; “building” includes any structure or erection or any part of a building, structure or erection; “bus” has the same meaning as in Schedule 1 of the Traffic Signs Regulations and General Directions 2016 ; “carriageway” has the same meaning as in the 1980 Act; “chief officer of police” means the chief constable of Northamptonshire Police Force or any successor in function; “commence”, or “commencement”, means the carrying out of a material operation, as defined in section 155 (when development begins) of the 2008 Act, as part of the authorised development unless the context indicates otherwise; “construction and environmental management plan” means the document of that description contained in appendix 2.1 of the environmental statement; “cycle track” has the same meaning as in section 329(1) (further provisions as to interpretation) of the 1980 Act ; “development consent obligation” means the development consent obligation entered into by agreement under section 106 (planning obligations) of the 1990 Act dated 28th March 2019 in respect of the authorised development and any subsequent amendment to the obligation; “electronic communications code” has the same meaning as in section 106(1) (application of the electronic communications code) of the Communications Act 2003 ; “electronic communications code network” means— so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the Communications Act 2003; and an electronic communications network which the Secretary of State is providing or proposing to provide; “the environmental statement” means the document of that description referred to in Schedule 16 and certified as the environmental statement by the Secretary of State for the purposes of this Order; “footpath” and “footway” have the same meaning as in the 1980 Act; “framework travel plan” means the document of that description referred to in requirement 4 (sustainable transport) and attached at appendix 1 to the transport assessment; “hedgerow” includes hedgerows to which the Hedgerow Regulations 1997 apply; “HGV” means any vehicle with an operational weight capable of exceeding 7.5 tonnes; “highway” and “highway authority” have the same meaning as in the 1980 Act; “highway classification plans” means the plans of that description referred to in Schedule 16 and certified as the highway classification plans by the Secretary of State for the purposes of this Order; “Highways England” means Highways England Company Limited (company number 09346363), whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4ZZ, appointed as highway authority for the highways specified in article 2 (appointment of a Strategic Highways Company) of the appointment of a Strategic Highways Company Order 2015 or any successor in function; “highway plans” means the plans of that description referred to in Schedule 16 and certified as the highway plans by the Secretary of State for the purposes of this Order; “highway works” means the works comprised in Works Nos. 7, 8, 9, 11, 12, 13, 14, 15, 16 and 17; “illustrative rail terminal plan” means the document of that description referred to in Schedule 16 and certified as the illustrative rail terminal plan by the Secretary of State for the purposes of this Order; “land plans” means the plans of that description referred to in Schedule 16 and certified as the land plans by the Secretary of State for the purposes of this Order; “lead local flood authority” means Northamptonshire County Council or any successor in function as lead local flood authority or equivalent body; “local highway authority” means Northamptonshire County Council or any successor in function as local highway authority; “maintain” includes inspect, repair, adjust, alter, clear, refurbish or improve, and any derivative of “maintain” is to be construed accordingly; “main site” means that part of the land within the Order limits comprising the areas of land described on the works plans as Works Nos. 1, 2, 3, 4, 5 and 6; “Order land” means the land shown on the land plans which is within the limits of land to be acquired or used permanently or temporarily, and described in the book of reference; “Order limits” means the limits shown on the works plans represented by a red line within which the authorised development may be carried out; “owner”, in relation to land, has the same meaning as in section 7 (interpretation) of the Acquisition of Land Act 1981 ; “parameters plan” means the plan of that description referred to in Schedule 16 and certified as the parameters plan by the Secretary of State for the purposes of this Order; “public sewer or drain” means a sewer or drain which belongs to the Environment Agency, an internal drainage board or a lead local flood authority or a sewerage undertaker; “public transport strategy” means the document of that description referred to in requirement 4 and attached at appendix 2 to the transport assessment; “ rail infrastructure plan ” means the plan of that description referred to in Schedule 16 and certified as the rail infrastructure plan by the Secretary of State for the purposes of this Order; “railway” has the same meaning as in the 2008 Act; “railway plans” means the plans of that description referred to in Schedule 16 and certified as railway plans by the Secretary of State for the purposes of this Order: “relevant highway authority” means in any provision of this Order the highway authority for any area of land to which that provision relates; “relevant planning authority” means as regards the operation and enforcement of any part of this Order the district planning authority within whose administrative boundary that part of the authorised development relevant to the operation or enforcement of the provision in question is situated; “relevant street authority” means in any provision of this Order the street authority for any area of land to which that provision relates; “relevant traffic authority” means in any provision of this Order the traffic authority for any area of land to which that provision relates; “relocation works” means works executed, or apparatus provided, under paragraph (2) of article 36; “requirements” means the requirements set out in Part 1 of Schedule 2 (requirements); “speed limit plans” means the plans of that description referred to in Schedule 16 and certified as the speed limit plans by the Secretary of State for the purposes of this Order; “statutory undertaker” means a statutory undertaker for the purposes of section 127(8) (statutory undertakers’ land) of the 2008 Act; “statutory utility” means a statutory undertaker for the purposes of the 1990 Act or a public communications provider as defined in section 151(1) (interpretation of Chapter 1) of the Communications Act 2003 ; “strategic road network” means that part of the highway network comprising trunk roads and motorways; “street” means a street within the meaning of section 48 (streets, street works and undertakers) of the 1991 Act, together with land on the verge of a street or between two carriageways, and includes part of a street; “street authority” in relation to a street, has the same meaning as in Part 3 of the 1991 Act; “traffic authority” has the meaning as in section 121A (traffic authorities) of the 1984 Act; “traffic officer” means a person designated under section 2 (designation of Traffic Officers) of the Traffic Management Act 2004 ; “traffic regulation plans” means the plans of that description referred to in Schedule 16 and certified as the traffic regulation plans by the Secretary of State for the purposes of this Order; “transport assessment” means the document of that description contained within appendix 12.1 of the environmental statement; “tribunal” means the Lands Chamber of the Upper Tribunal; “tree preservation order” has the meaning given in section 198 (tree preservation orders) of the 1990 Act; “trunk road” means a highway which is a trunk road by virtue of— section 10 (general provision as to trunk roads) or 19(1) (certain special roads and other highways to become trunk roads) of the 1980 Act ; or an order or direction under section 10 of that Act; or this Order; or any other enactment; “the undertaker” means— Roxhill (Junction 15) Limited (company number 08763104) whose registered office is at Lumonics House, Valley Drive, Swift Valley, Rugby, Warwickshire, CV21 1TQ; and in respect of the main site only, any other person who has the benefit of this Order in accordance with section 156 (benefit of order granting development consent) of the 2008 Act for such time as that section applies to that person; “verge” means any part of the road which is not a carriageway; “water authority” means AWG Group Limited (company number 02366618) registered at Lancaster House, Lancaster Way, Ermine Business Park, Huntingdon, Cambridgeshire, PE29 6XU and any successor in function; “warehousing” means the warehousing constructed as part of the authorised development; “watercourse” includes all rivers, streams, ditches, drains, canals, cuts, culverts, dykes, sluices, sewers and passages through which water flows except a public sewer or public drain; and “the works plans” means the plans of that description referred to in Schedule 16 and certified as the works plans by the Secretary of State for the purposes of this Order. 2 References in this Order to rights over land include references to rights to do or to place and maintain, anything in, on or under land or in the air-space above its surface. 3 All distances, directions and lengths referred to in this Order are approximate and where applicable distances between points on a work comprised in the authorised development are taken to be measured along that work. 4 References in this Order to numbered works are references to the works as numbered in Schedule 1 and references to numbered requirements are to the requirements as numbered in Part 1 of Schedule 2. 5 For the purposes of this Order all areas described in square metres in the book of reference are approximate. 6 Where in this Order a document or a plan is referred to by reference to a document number, the reference is to the document or plan of that number referred to in Schedule 16. PART 2 PRINCIPAL POWERS Development consent granted by the Order 3 Subject to the provisions of this Order and to the requirements, the undertaker is granted development consent for the authorised development to be carried out and used within the Order limits. Parameters of authorised development 4 1 The authorised development is to be carried out within the parameters shown and described on the parameters plan and in carrying out the authorised development the undertaker may— a deviate laterally from the lines or situations of the authorised development shown on the works plans to the extent of the limits of deviation shown on those plans; b in respect of the highway works deviate vertically from the levels shown on the highway plans to a maximum of 1.5 metres upwards or downwards; and c in respect of the railway works comprised in Works Nos. 1 and 2 deviate vertically from the levels shown on the railway plans to a maximum of 1.5 metres upwards or downwards. 2 The maximum limits described in paragraph (1)(a) to (c) do not apply to constrain the authorised development when it is demonstrated by the undertaker, on application, to the relevant planning authority’s satisfaction, and the relevant planning authority certifies accordingly, that a deviation in excess of these limits would not be likely to give rise to any materially new or materially different significant effects on the environment that have not been assessed in the environmental statement. Authorisation of use 5 Subject to the provisions of this Order and to the requirements, the undertaker and any persons authorised by the undertaker may operate and use that part of the authorised development comprised in Works Nos. 1 to 6 for the purposes of a rail freight terminal and warehousing, any purposes for which such parts of the authorised development is designed and for any purposes ancillary to those purposes. Maintenance of authorised development 6 1 The undertaker may at any time maintain the authorised development, except to the extent that this Order or an agreement made under this Order provides otherwise. 2 Paragraph (1) does not apply to the highway works the maintenance of which is governed by article 14 (maintenance of highway works) and Parts 2 and 3 of Schedule 13 (protective provisions). 3 Paragraph (1) does not extend to any maintenance works which would be likely to give rise to any materially new or materially different significant effects on the environment that have not been assessed in the environmental statement or in any updated environmental information supplied under the 2017 EIA Regulations. Benefit of Order 7 1 Subject to paragraphs (2), (3) and (4) the provisions of this Order have effect solely for the benefit of the undertaker. 2 Roxhill (Junction 15) Limited, has the sole benefit of the provisions of Part 5 (powers of acquisition) unless the Secretary of State consents to the transfer of the benefit of those provisions. 3 Roxhill (Junction 15) Limited has the sole benefit of the powers conferred by this Order to carry out the highway works in accordance with the provisions of Parts 2 and 3 of Schedule 13 (protective provisions) unless— a the Secretary of State consents to the transfer of the benefit of those provisions; or b the provisions of paragraph 4(6) of Part 2 or paragraph 4(6) of Part 3 of Schedule 13 apply in which case the relevant highway authority will have the benefit of the powers to carry out the relevant highway works. 4 Paragraph (1) does not apply to the works for which consent is granted by this Order for the express benefit of owners and occupiers of land, statutory undertakers, operators of the electronic communications code network and other persons affected by the authorised development. PART 3 STREETS Street works 8 1 The undertaker may for the purposes of the carrying out of the authorised development, enter on so much of any of the streets specified in Schedule 3 (streets subject to street works) as are within the Order limits and may— a break up or open the street, or any sewer, drain or tunnel under it; b tunnel or bore under the street; c place apparatus in the street; d maintain apparatus in the street or change its position; e construct bridges and tunnels; f increase the width of the carriageway of the street by reducing the width of any kerb, footpath, footway, cycle track or verge within the street; g alter the level or increase the width of such kerb, footway, cycle track or verge; h reduce the width of the carriageway of the street; i make and maintain crossovers and passing places; and j execute any works required for or incidental to any works referred to in sub-paragraphs (a) to (i). 2 The authority given by paragraph (1) is a statutory right for the purposes of sections 48(3) (streets, street works and undertakers) and 51(1) (prohibition of unauthorised street works) of the 1991 Act and is subject to the provisions of Parts 2 and 3 of Schedule 13. Power to alter layout, etc., of streets 9 1 Subject to paragraph (2), the undertaker may, for the purposes of constructing and maintaining the authorised development, alter the layout of any street within the main site and the layout of any street at its junction with such a street; and, without limitation on the scope of this paragraph, the undertaker may— a increase the width of the carriageway of the street by reducing the width of any kerb, footpath, footway, cycle track or verge within the street; b alter the level or increase the width of such kerb, footway, cycle track or verge; c reduce the width of the carriageway of the street; and d make and maintain crossovers and passing places. 2 The powers conferred by paragraph (1) must not be exercised without the consent of the local highway authority but such consent must not be unreasonably withheld and if the local highway authority has received an application for consent to exercise powers under paragraph (1) accompanied by all relevant information and fails to notify the undertaker of its decision before the end of the period of 42 days beginning with the date on which the application is submitted with all relevant information, it is deemed to have granted consent. Permanent stopping up of streets 10 1 Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development, stop up permanently the streets specified in column (2) of Schedule 4 (streets to be permanently stopped up for which a substitute is to be provided) to the extent specified, by reference to the letters shown on the access and rights of way plans, in column (3) of that Schedule. 2 No street specified in column (2) of Schedule 4 is to be wholly or partly stopped up under this article unless— a the new street to be substituted for it, which is specified in column (4) of that Schedule, has been completed to the reasonable satisfaction of the relevant street authority and is open for use; or b a temporary alternative route for the passage of such traffic as could have used the street to be stopped up is first provided and subsequently maintained by the undertaker between the commencement and termination points for the stopping up of the street until the completion and opening of the new street in accordance with sub-paragraph (a). 3 Where a street has been stopped up under this article— a all rights of way over or along the street so stopped up are extinguished; and b the undertaker may appropriate and use for the purposes of the authorised development so much of the street as is bounded on both sides by land owned by the undertaker. 4 Any person who suffers loss by the suspension or extinguishment of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. 5 This article is subject to article 36 (apparatus and rights of statutory undertakers in stopped up streets). Temporary stopping up of streets 11 1 The undertaker may during and for the purposes of carrying out the authorised development, temporarily stop up, alter or divert any street and may for any reasonable time— a divert the traffic from the street; and b subject to paragraph (2), prevent all persons from passing along the street. 2 The undertaker must provide reasonable access for pedestrians going to or from premises abutting a street affected by the temporary stopping up, alteration or diversion of a street under this article if there would otherwise be no such access. 3 The undertaker must not temporarily stop up, alter or divert any street for which it is not the street authority without the consent of the relevant street authority which may attach reasonable conditions to any consent (including specifying the time period during which the street may be stopped up, altered or diverted) but such consent must not be unreasonably withheld. 4 Any person who suffers loss by the suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. 5 If a street authority has received an application for consent under paragraph (3) accompanied by all relevant information and fails to notify the undertaker of its decision before the end of the period of 42 days beginning with the date on which the application was submitted with all relevant information, it is deemed to have granted consent. Public rights of way – creation, substitution and stopping up 12 1 Subject to the provisions of this article, the undertaker may, in connection with the carrying out of the authorised development— a stop up each of the public rights of way specified in columns (1) and (2) of Part 1 of Schedule 5 (public rights of way to be permanently stopped up for which a substitute is to be provided) to the extent specified in column (3) of that Part of that Schedule; b provide the substitute public rights of way described in column (4) of Part 1 of Schedule 5 between the specified terminus points and where specified, on a detailed alignment to be agreed with the local highway authority at the stage of the authorised development identified in column (5) of that Part of that Schedule; c temporarily stop up public rights of way to the extent agreed with the relevant highway authority and provide substitute temporary public rights of way on an alignment to be agreed with the local highway authority prior to the temporary stopping up of the public right of way concerned; and d stop up each of the public rights of way specified in columns (1) and (2) of Part 2 of Schedule 5 (public rights of way to be permanently stopped up for which no substitute is to be provided) to the extent specified in column (3) of that Part of that Schedule at the stage of the authorised development identified in column (4) of that Part of that Schedule. 2 No public right of way specified in columns (1) and (2) of Part 1 of Schedule 5 may be wholly or partly stopped up under this article unless the permanent substitute public rights of way referred to in column (4) of Part 1 of Schedule 5 or an alternative temporary substitute public right of way agreed by the local highway authority has first been provided by the undertaker, to the reasonable satisfaction of the local highway authority. 3 Any temporary substitute right of way must be maintained by the undertaker with appropriate signage until the completion and opening of the permanent substitute public right of way specified in column (4) of Part 1 of Schedule 5. 4 The undertaker must in connection with carrying out of the authorised development provide the new public rights of way specified in columns (1) and (2) of Part 3 of Schedule 5 (new public rights of way to be created) to the extent specified in column (3) of that Part of that Schedule at the stage of the authorised development in column (4) of that Part of that Schedule. Accesses 13 1 The undertaker may, for the purposes of the authorised development and subject to paragraph (2), with the consent of the relevant highway authority or the relevant street authority as appropriate (such consent not to be unreasonably withheld), form and lay out such means of access (permanent or temporary) or improve existing means of access, at such locations within the Order limits as the undertaker reasonably requires for the purposes of the authorised development. 2 The agreement of the relevant highway authority or the relevant street authority as appropriate is not required for the formulation, layout or improvement of a new or existing means of access described in Schedule 1 (authorised development) and carried out in accordance with the relevant provisions of Parts 2 and 3 of Schedule 13 (protective provisions). 3 If a highway authority or street authority, other than Highways England, which has received an application for consent under paragraph (1) fails to notify the undertaker of its decision before the end of the period of 42 days beginning with the date on which the application was made, it is deemed to have granted consent. 4 If Highways England, as the highway authority, upon receiving an application for consent under paragraph (1) fail to notify the undertaker of its decision before the end of 28 days beginning on the date on which the application was made, the undertaker may serve upon Highways England written notice requiring Highways England to give consent or refusal within a further 28 days beginning with the date upon which Highways England received written notice from the undertaker. Subject to paragraph (5), if by the expiry of the further 28 days Highways England has failed to notify the undertaker of its decision, Highways England is deemed to have granted consent. 5 Any further notice given by the undertaker to Highways England under paragraph (4) must include a written statement that the provisions of paragraph (4) apply to the relevant application. 6 The private means of access as set out in column (2) of Part 1 of Schedule 6 (private means of access to be replaced) may be removed by the undertaker and if removed must be replaced by the means of access as set out in column (3) of Part 1 of Schedule 6 at the stage of the authorised development identified in column (4) of that Part of that Schedule. 7 The private means of access as set out in column (2) of Part 2 of Schedule 6 (private means of access to be closed for which no substitute is to be provided) may be closed by the undertaker at the stage of the authorised development identified in column (3) of that Part of that Schedule without a substitute being provided. 8 The undertaker must provide the private means of access as set out in column (2) of Part 3 of Schedule 6 (new private means of access created) at the stage of the authorised development identified in column (3) of that Part of that Schedule. Maintenance of highway works 14 1 The highway works must be completed in accordance with the provisions of Parts 2 and 3 of Schedule 13 (protective provisions). 2 With effect from the date of the handover certificate referred to in paragraph 7 of Part 2 of Schedule 13 the highway works to which that certificate relates will be maintained by and at the expense of Highways England. 3 With effect from the date of the final certificate referred to in paragraph 7 of Part 3 of Schedule 13 the highway works to which that certificate relates will be maintained by and at the expense of the local highway authority. 4 Where new land not previously part of the public highway is the subject of a provisional certificate under paragraph 6 of Part 2 of Schedule 13 then it is deemed to be dedicated as part of the public highway on the issue of that certificate. 5 Where new land not previously part of the public highway is the subject of a provisional certificate under paragraph 6 of Part 3 of Schedule 13 then it is deemed to be dedicated as part of the public highway on the issue of that certificate. 6 For the purposes of this article, the definition of “maintain” in article 2 (interpretation) does not apply and the word “maintain” is to be given its ordinary meaning when applied to highways. Classification of highways 15 1 The new highways described in Part 1 of Schedule 7 (new highways) are to be— a classified as set out in column (3) of Part 1 of Schedule 7 for the purpose of any enactment or instrument which refers to highways classified as such; and b provided for the use of the classes of traffic defined in Schedule 4 (classes of traffic for purposes of special roads) to the 1980 Act as set out in column (4) of Part 1 of Schedule 7. 2 From the date on which the undertaker notifies the Secretary of State that the new highways described in Part 1 of Schedule 7 have been completed, as evidenced by issue of the provisional certificate in accordance with paragraph 6 of Part 2 and paragraph 6 of Part 3 of Schedule 13 (protective provisions), or are open for through traffic, whichever is the earliest— a the body set out in column (5) of Part 1 of Schedule 7 is the highway authority for those highways; and b the new highways identified as special roads in column (3) of Part 1 of Schedule 7 are classified as trunk roads for the purpose of any enactment or instrument which refers to highways classified as trunk roads. 3 From the occurrence of the event set out in column (4) of Part 2 of Schedule 7 (existing highways), the existing highways described in columns (1) and (2) of Part 2 of Schedule 7 are to cease to have the classification and be the responsibility of the relevant highway authority set out in column (3) of Part 2 of Schedule 7 and are to be— a classified as set out in column (5) of Part 2 of Schedule 7 for the purpose of any enactment or instrument which refers to highways classified as such; b provided for the use of the classes of traffic defined in Schedule 4 to the 1980 Act as set out in column (6) of Part 2 of Schedule 7; and c the responsibility of the relevant highway authority set out in column (7) of Part 2 of Schedule 7 subject only to any maintenance obligation imposed on the undertaker in Parts 2 and 3 of Schedule 13, as if such classification had been made under sections 10(2) and 12(3) of the 1980 Act. Speed limits 16 1 The orders referred to in columns (1) and (2) of Part 1 of Schedule 8 (existing orders) are revoked or varied as set out in column (3) of Part 1 of Schedule 8 upon the event listed in column (4) occurring. 2 Upon the event listed in column (3) of Part 2 of Schedule 8 (highways subject to 50mph speed limit) no person is to drive any motor vehicle at a speed exceeding 50 miles per hour on the lengths of highway identified in column (2) of Part 2 of Schedule 8. 3 Upon the event listed in column (3) of Part 3 of Schedule 8 (derestricted highways) the lengths of highway specified in column (2) of Part 3 of Schedule 8 cease to be restricted highways for the purpose of section 81 of the 1984 Act. 4 During the period specified in column (4) of Part 4 of Schedule 8 (temporary speed limits) no person is to drive any motor vehicle at a speed exceeding the limit specified in column (2) of Part 4 of Schedule 8 along the lengths of highway specified in column (3) of Part 4 of Schedule 8. 5 Without limiting the scope of the specific powers conferred by paragraph (4) but subject to the provisions of this article and the consent (such consent not to be unreasonably withheld) of the relevant traffic authority, which consent may be subject to reasonable conditions, the undertaker may, in so far as may be expedient or necessary for the purposes of or in connection with the construction, operation or maintenance of the authorised development, impose a temporary speed limit either at all times or at times, on days or during such periods, and on such highways as may be specified by the undertaker. 6 The undertaker must not exercise the powers in paragraph (5) unless it has given not less than 4 weeks’ notice in writing of its intention so to do to the chief officer of police and to the relevant traffic authority. 7 The speed limits imposed by this Order are deemed to have been imposed by an order under the 1984 Act and— a have the same effect; and b may be varied by the relevant traffic authority in the same manner, as any other speed limit imposed by an order under that Act. 8 No speed limit imposed by this Order applies to vehicles falling within regulation 3(4) (regulations in relation to orders and notices under the 1984 Act) of the Road Traffic Exemptions (Special Forces) (Variation and Amendment) Regulations 2011 when used in accordance with regulation 3(5) of those Regulations. Traffic regulation 17 1 The order referred to in column (1) of Part 1 of Schedule 9 (amendments to existing orders) is revoked as set out in column (2) of Schedule 9 upon the event listed in column (3) of Part 1 of Schedule 9 occurring. 2 Without limiting the scope of the specific powers conferred by paragraph (1) but subject to the provisions of this article and the consent (such consent not to be unreasonably withheld) of the relevant traffic authority, which consent may be subject to reasonable conditions, the undertaker may, in so far as may be expedient or necessary for the purposes of or in connection with the construction, operation or maintenance of the authorised development— a revoke, amend or suspend in whole or in part any order made, or having effect as if made, under the 1984 Act; b permit, prohibit or restrict the stopping, parking, waiting, loading or unloading of vehicles on any road; c suspend or authorise the use as a parking place of any highway; d make provision as to the direction or priority of vehicular traffic on any highway; and e permit or prohibit vehicular access to any highway; either at all times or at times, on days or during such periods as may be specified by the undertaker. 3 The undertaker is not to exercise the powers in paragraph (3) unless it has— a given not less than 4 weeks’ notice in writing of its intention so to do to the chief officer of police and to the relevant traffic authority; and b advertised its intention in such manner as the relevant traffic authority may specify in writing within 7 days of the relevant traffic authority’s receipt of notice of the undertaker’s intention under sub-paragraph (a). 4 Any prohibition, restriction or other provision made by the undertaker under paragraph (3) is to— a have effect as if duly made by, as the case may be— i the relevant traffic authority as a traffic regulation order under the 1984 Act; or ii the local highway authority as an order under section 32 (power of local authorities to provide parking places) of the 1984 Act ; and b be deemed to be a traffic order for the purposes of Schedule 7 (road traffic contraventions subject to civil enforcement) to the Traffic Management Act 2004. 5 Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the undertaker from time to time by subsequent exercise of the powers conferred by paragraph (3) at any time. 6 Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act. 7 If the relevant traffic authority fails to notify the undertaker of its decision within 42 days of receiving an application for consent under paragraph (3) that is accompanied by all relevant information the relevant traffic authority is deemed to have given consent. Clearways 18 1 Subject to paragraphs (3) and (4), following the event specified in column (3) of Part 2 of Schedule 9 (clearways), no person, except upon the direction or with the permission of a police officer or traffic officer in uniform, is to cause or permit any vehicle to wait on any part of a carriageway specified in columns (1) and (2) of Part 2 of Schedule 9, other than a lay-by. 2 Nothing in paragraph (1) applies— a to render it unlawful to cause or permit a vehicle to wait on any part of the carriageway or verge, for so long as may be necessary to enable that vehicle to be used in connection with— i the removal of any obstruction to traffic; ii the maintenance, improvement, reconstruction or operation of the carriageway or verge; iii the laying, erection, inspection, maintenance, alteration, repair, renewal or removal in or near the carriageway or verge of any sewer, main pipe, conduit, wire, cable or other apparatus for the supply of gas, water, electricity or any electronic communications apparatus as defined in Schedule 3A to the Communications Act 2003 ; or iv any building operation or demolition; b in relation to a vehicle being used— i for police, ambulance, fire and rescue authority or traffic officer purposes; ii in the service of a local authority, Highways England, a safety camera partnership or the Driver and Vehicle Standards Agency in pursuance of statutory powers or duties; iii in the service of a water or sewerage undertaker within the meaning of the Water Industry Act 1991 ; or iv by a universal service provider for the purposes of providing a universal postal service as defined by the Postal Services Act 2000 ; or c in relation to a vehicle waiting when the person in control of it is— i required by law to stop; ii obliged to stop in order to avoid an accident; or iii prevented from proceeding by circumstances outside the person’s control. 3 No person is to cause or permit any vehicle to wait on any part of the roads described in Part 2 of Schedule 9 for the purposes of selling, or dispensing of, goods from that vehicle, unless the goods are immediately delivered at, or taken into, premises adjacent to the land on which the vehicle stood when the goods were sold or dispensed. 4 Paragraphs (1) to (3) have effect as if made by a traffic regulation order under the 1984 Act and their application may be varied or revoked by such an order under that Act or by any other enactment which provides for the variation or revocation of such orders. Motor vehicle restrictions 19 1 No person, except upon the direction or with the permission of a police officer or traffic officer in uniform, is to cause or permit any vehicle, the maximum gross weight of which exceeds 7.5 tonnes, to enter or proceed within the zone specified in column (2) of Part 3 of Schedule 9 (environmental weight limit) between the points specified in column (3) of Part 3 of that Schedule following the event specified in column (4) of Part 3 of that Schedule. 2 The restriction referred to in paragraph (1) does not apply in respect of— a anything done in accordance with any restriction or requirement indicated by traffic signs placed by or on behalf of the police; b vehicles being used— i in the service of a local authority or water authority in pursuance of statutory powers or duties; ii for police, ambulance, fire and rescue authority or traffic officer purposes; iii for the purpose of agriculture on any land adjacent to the restricted roads; iv for the purpose of gaining access to or leaving any land and/or premises situated in or adjacent to the restricted roads or any roads or lengths of roads accessible only therefrom; v in connection with the carrying out on land or any premises situated on or adjacent to the restricted roads of any building, industrial or demolition operation or the removal of any obstruction to traffic for the maintenance, improvement, reconstruction, cleansing or lighting of the road or any roads accessible only therefrom, or the laying, erection, alteration or repair of any sewer under the restricted roads or of any main pipe or apparatus for the supply of gas, water, or electricity or of any electronic communications apparatus thereunder or thereon, or for the placing, maintenance or removal of any traffic sign thereon; or vi for public transport. 3 No person, except upon the direction or with the permission of a police officer or traffic officer in uniform, is to cause or permit any vehicle to proceed in the manner specified in column (2) of Part 4 of Schedule 9 (prohibited movements) at the point specified in column (1) of Part 4 of Schedule 9. 4 Paragraphs (1) to (3) have effect as if made by a traffic regulation order under the 1984 Act, and their application may be varied or revoked by such an order under that Act or by any other enactment which provides for the variation or revocation of such orders. Agreements with highway authorities 20 1 A relevant highway authority and the undertaker may enter into agreements related to the authorised development with respect to— a the construction and/or maintenance of any new highway, including any structure carrying the highway over an existing railway or any railway authorised by this Order; b the strengthening, improvement, repair or reconstruction of any highway under the powers conferred by this Order; c the maintenance of landscaping within a highway constructed as part of the highway works; d the maintenance of highway related assets which fall outside of the extent of highway maintained by a relevant highway authority; e any stopping up, alteration or diversion of a highway as part of or to facilitate the authorised development; or f the carrying out in the highway of any of the works referred to in article 8 (street works). 2 Such an agreement may, without limitation on the scope of paragraph (1)— a make provision for the relevant highway authority to carry out any function under this Order which relates to the highway in question; b include an agreement between the undertaker and relevant highway authority specifying a reasonable time for the completion of the works; and c contain such terms as to payment and otherwise as the parties consider appropriate. PART 4 SUPPLEMENTAL POWERS Discharge of water 21 1 Subject to paragraphs (3) to (6) the undertaker may use any watercourse or any public sewer or drain for the drainage of water in connection with the carrying out or maintenance of the authorised development and for that purpose may lay down, take up and alter pipes and may, on any land within the Order limits, make openings into, and connections with, the watercourse, public sewer or drain. 2 Any dispute arising from the making of connections to or the use of a public sewer or drain by the undertaker under paragraph (1) must be determined as if it were a dispute under section 106 (right to communicate with public sewers) of the Water Industry Act 1991 . 3 The undertaker must not discharge any water into any public sewer or drain except with the consent of the person to whom it belongs, and such consent may be given subject to such terms and conditions as that person may reasonably impose, but must not be unreasonably withheld. 4 No water may be discharged into a watercourse that flows into the highway drainage system without the consent of the relevant highway authority and such consent may be given subject to such terms and conditions as the relevant highway authority consider appropriate, but must not be unreasonably withheld or delayed. 5 The undertaker must not do work on, over, under or near an ordinary watercourse (within nine metres of the landward toe of the bank), make changes to any structure that helps control water or discharge any water into any watercourse except with the approval of the lead local flood authority; and such approval may be given subject to such terms and conditions as the lead local flood authority may reasonably impose, but must not be unreasonably withheld. 6 The undertaker must not make any opening into any public sewer or drain except— a in accordance with plans approved by the person to whom the sewer or drain belongs, but such approval must not be unreasonably withheld; and b where that person has been given the opportunity to supervise the making of the opening. 7 The undertaker must take such steps as are reasonably practicable to secure that any water discharged into a watercourse or public sewer or drain under this article is as free as may be practicable from gravel, soil or other solid substance, oil or matter in suspension. 8 Nothing in this article overrides the requirement for an environmental permit under regulation 12(1)(b) of the Environmental Permitting (England and Wales) Regulations 2016 . 9 In this article— a “public sewer or drain” means a sewer or drain which belongs to the Environment Agency, an internal drainage board, a local authority or a sewerage undertaker; and b other expressions excluding watercourse, which are used both in this article and in the Water Resources Act 1991 have the same meaning as in that Act. 10 If a person who has received an application for consent under paragraph (3) or approval under paragraphs (4), (5) or (6)(a) fails to notify the undertaker of its decision within 42 days of receiving the application submitted with all relevant information, that person is deemed to have granted consent or given approval as the case may be. Authority to survey and investigate the land 22 1 The undertaker may, for the purposes of this Order, enter on any land shown within the Order limits or which may be affected by the authorised development and— a survey or investigate the land; b without limitation on the scope of sub-paragraph (a), make trial holes in such positions on the land as the undertaker thinks fit to investigate the nature of the surface layer and subsoil and remove soil samples; c without limitation on the scope of sub-paragraph (a), carry out ecological or archaeological investigations on such land; and d place on, leave on and remove from the land apparatus for use in connection with the survey and investigation of land and making of trial holes. 2 No land may be entered or equipment placed or left on or removed from the land under paragraph (1) unless at least 28 days’ notice has been served on every owner, who is not the undertaker, and occupier of the land. 3 Any person entering land under the powers conferred by this article on behalf of the undertaker— a must, if so required, produce written evidence of their authority to do so; and b may take with them such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes. 4 No trial holes may be made under this article— a in land located within the highway boundary without the consent of the relevant highway authority; or b in a private street without the consent of the relevant street authority, but such consent must not be unreasonably withheld. 5 The undertaker must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the authority conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. 6 If either a highway authority or a street authority which has received an application for consent under paragraph (4) that includes all relevant information fails to notify the undertaker of its decision within 42 days of receiving the application the authority is deemed to have granted the consent. PART 5 POWERS OF ACQUISITION Guarantees in respect of payment of compensation 23 1 The undertaker must not exercise a power conferred by articles 24 to 27 or 32 to 35 unless a guarantee or alternative form of security in respect of the liabilities of the undertaker to pay compensation under the power being exercised is first in place. 2 The form of guarantee or security referred to in paragraph (1), and the amount guaranteed or secured, must be approved by the relevant planning authority; but such approval must not be unreasonably withheld or delayed. 3 The undertaker must provide the relevant planning authority with such information as the relevant planning authority may reasonably require relating to the interests in the land affected by the exercise of the powers conferred by articles 24 to 27 or 32 to 35 for the relevant planning authority to be able to determine the adequacy of the proposed guarantee or security including— a the interests affected; and b the undertaker’s assessment, and the basis of the assessment, of the level of compensation. 4 A guarantee or other security given in accordance with this article that guarantees or secures the undertaker’s payment of compensation under this Part is enforceable against the guarantor or provider of security by any person to whom such compensation is properly payable. 5 Nothing in this article requires a guarantee or alternative form of security to be in place for more than 15 years from the date on which the relevant power is exercised. Compulsory acquisition of land 24 1 The undertaker may acquire compulsorily so much of the Order land as is required for the authorised development, or to facilitate it or is incidental to it, as described in the book of reference and shown on the land plans. 2 From the day on which a compulsory acquisition notice under section 134 (notice of authorisation of compulsory acquisition) of the 2008 Act is served or the day on which the Order land, or any part of it, is vested in the undertaker, whichever is the later, all rights, trusts and incidents to which that land or that part of it which is vested (as the case may be) was previously subject are discharged or suspended, so far as their continuance would be inconsistent with the exercise of the powers under this Order. 3 Any person who suffers loss by the extinguishment or suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. 4 This article is subject to— a article 25 (compulsory acquisition of rights); b article 26 (private rights); c article 29 (time limit for exercise of authority to acquire land and rights compulsorily); and d article 34(9) (temporary use of land for carrying out the authorised development). Compulsory acquisition of rights 25 1 The undertaker may acquire compulsorily the existing rights over land and create and acquire compulsorily the new rights listed in Schedule 11 (land in which new rights may be created) and described in the book of reference and shown on the land plans. 2 From the date on which a compulsory acquisition notice is served pursuant to section 134 (notice of authorisation of compulsory acquisition) of the 2008 Act or the date on which any new right is vested in the undertaker, whichever is the later, the land over which any new right is, or rights are, acquired will be discharged from all rights, trusts and incidents to which it was previously subject so far as their continuance would be inconsistent with the exercise of that new right. 3 Subject to section 8 (other provisions as to divided land) of, and Schedule 2A (counter-notice requiring purchase of land) to the 1965 Act (as substituted by paragraph 5(8) of Schedule 12 (modifications of compensation and compulsory purchase enactments for creation of new rights), where the undertaker acquires an existing right over land under paragraph (1), the undertaker is not required to acquire a greater interest in that land. 4 Schedule 12 has effect for the purpose of modifying the enactments relating to compensation and the provisions of the 1965 Act in their application in relation to the compulsory acquisition under this article. 5 Any person who suffers loss by the extinguishment or suspension of any private right of way under this article is entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act. Private rights 26 1 Subject to the provisions of this article, all private rights and restrictions over land subject to compulsory acquisition under this Order are extinguished— a as from the date of acquisition of the land by the undertaker, whether compulsorily or by agreement; or b on the date of entry on the land by the undertaker under section 11(1) (power of entry) of the 1965 Act, whichever is the earlier. 2 Subject to the provisions of this article, all private rights and restrictions over land subject to the compulsory acquisition of rights under this Order are extinguished in so far as their continuance would be inconsistent with the exercise of the right— a as from the date of the acquisition of the right by the undertaker, whether compulsorily or by agreement; or b on the date of entry on the land by the undertaker under section 11(1) of the 1965 Act in pursuance of the right, whichever is the earlier. 3 Subject to the provisions of this article, all private rights and restrictions over land within the limits of land which may be subject to compulsory acquisition powers shown on the land plans are extinguished on the appropriation of the land or right by the undertaker. 4 Subject to the provisions of this article, all private rights and restrictions over land of which the undertaker takes temporary possession under this Order are suspended and unenforceable for as long as the undertaker remains in lawful possession of the land. 5 Any person who suffers loss by the extinguishment or suspension of any private right or restrictions under this article is entitled to compensation in accordance with the terms of section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act to be determined, in case of dispute, under Part 1 of the 1961 Act. 6 This article does not apply in relation to any right to which section 138 (extinguishment of rights, and removal of apparatus, of statutory undertakers etc.) of the 2008 Act or article 32 (statutory undertakers and operators of the electronic communications code network) applies. 7 Paragraphs (1) to (4) have effect subject to— a any notice given by the undertaker before— i the completion of the acquisition of the land or the creation or acquisition of rights over or affecting the land; ii the undertaker’s appropriation of it; iii the undertaker’s entry onto it; or iv the undertaker’s taking temporary possession of it, that any or all of those paragraphs do not apply to any right specified in the notice; and b any agreement made at any time between the undertaker and the person in or to whom the right in question is vested or belongs. 8 If any agreement referred to in paragraph (7)(b)— a is made with a person in or to whom the right is vested or belongs; and b is expressed to have effect also for the benefit of those deriving title from or under that person, it is effective in respect of the persons so deriving title, whether the title was derived before or after the making of the agreement. 9 References in this article to private rights over land include references to any trusts or incidents to which the land is subject. Power to override easements and other rights 27 1 Any authorised activity undertaken by the undertaker which takes place on land within the Order limits (whether the activity is undertaken by the undertaker or by any person deriving title under it) is authorised by this Order if it is done in accordance with the terms of this Order, regardless of whether it involves— a an interference with an interest or right to which this article applies; or b a breach of a restriction as to the use of the land arising by virtue of a contract. 2 The interests and rights to which this article applies are any easement, liberty, privilege, right or advantage annexed to land and adversely affecting other land, including any natural right to support. 3 Nothing in this article authorises interference with any right of way or right of laying down, erecting, continuing or maintaining apparatus on, under or over land which is a right vested in or belonging to statutory undertakers for the purpose of the carrying on of their undertaking. 4 Where any interest or right to which this article applies is interfered with or any restriction breached by any authorised activity in accordance with the terms of this article the interest or right is extinguished, abrogated or discharged at the time that the interference or breach in respect of the authorised activity in question commences. 5 In respect of any interference, breach, extinguishment, abrogation or discharge under this article, compensation— a is payable under section 7 (measure of compensation in case of severance) or 10 (further provisions as to compensation for injurious affection) of the 1965 Act; and b is to be assessed in the same manner and subject to the same rules as in the case of other compensation under those sections in respect of injurious affection where— i the compensation is to be estimated in connection with a purchase under that Act; or ii the injury arises from the execution of works on or use of land acquired under that Act. 6 Nothing in this article is to be construed as authorising any act or omission on the part of any person which is actionable at the suit of any person on any grounds other than such an interference or breach as is mentioned in paragraph (1) of this article. 7 Nothing in this article is to be construed as restricting the entitlement of any person to compensation. 8 Where a person deriving title under the undertaker by whom the land in question was acquired or appropriated— a is liable to pay compensation; and b fails to d

    The text continues in the official source.

    Related guides, FAQ and contract templates