uksi/2018/413 — The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018
Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.
Analyze this law with AI2018 No. 413
Infrastructure Planning
The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018
Made
23rd March 2018
Coming into force
24th March 2018
An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008 to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 2013 .
The Secretary of State, having considered the application and the responses to the publicity and consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.
The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 of the Planning Act 2008, makes the following Order:
Citation and commencement
1
This Order may be cited as The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 and shall come into force on 24th March 2018.
Amendment of The Hinkley Point C (Nuclear Generating Station) Order 2013
2
The Hinkley Point C (Nuclear Generating Station) Order 2013 (“the Order”) is amended as follows.
Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)
3
1
In Part 1 of Schedule 1 to the Order the description of Work No. 1A is amended as follows:
2
In paragraph (d)(i)—
a
after “Effluent Tanks” insert “and Refuelling Water Storage Tank”;
b
after “Battery Load Bank;” insert “and”;
c
after “Cooling Water Discharge Weir (Buildings)” omit “and Refuelling Water Storage Tank;”.
3
In paragraph (h)—
a
after “Service Access Buildings;” omit “and”;
b
in the list below “Service Access Buildings;”, insert “Underground Tunnel High Points;”; and
c
in the list, below “Services Ventilation Building;” insert—
Back Up Containerised Generators; and
Valve Room for Demineralisation Station.
Amendment to Part 2 (Temporary jetty works) of Schedule 1 (Authorised project)
4
1
Part 2 of Schedule 1 to the Order is amended as follows.
2
In the description of Work No. TJ1 after “elevated roadway” insert “and drainage infrastructure (including pipework and outfalls)”.
Amendment to Part 3 (Approved plans) of Schedule 1 (Authorised project)
5
1
Part 3 of Schedule 1 to the Order is amended as follows.
2
For the tables and headings listed under the heading “HPC Development Site”, up to the heading “HPC accommodation campus”, substitute the list in the Schedule to this Order.
Amendment to Schedule 2 (Requirements)
6
1
Schedule 2 to the Order is amended as follows.
2
In the table at paragraph 2—
a
In sub-paragraph (2) of requirement PW3, for “(Rev 02)” substitute “(Rev 03)”;
3
In the table at paragraph 3—
a
In sub-paragraph (2) of requirement P10, after “Environmental Statement” insert “and may include pipework attaching to the temporary jetty leading to an outfall at the temporary jetty head,” and after “and shall” include “(except in relation to discharge from the temporary jetty head)”;
4
In the table at paragraph 4—
a
In sub-paragraph (3) of requirement MS4, for “and 1C” substitute “, 1C and TJ1”;
b
After requirement MS17 insert new row—
MS18 Back Up Containerised Generators
(1) Construction of the Back Up Containerised Generators (comprised in Work No. 1A(h)) shall not commence until details of their layout, scale and external appearance have been submitted to and approved by West Somerset District Council.
(2) The details referred to in paragraph (1) shall be in accordance with parameter plans HINK-A2-LLY-00-GA-001 (Rev 01); HINK-A2-LLV-00-GA-001 (Rev 01); and HINK-A2-LLW-00-GA-001 (Rev 01).
(3) The works shall be carried out in accordance with the approved details.
;
c
In sub-paragraph (2) of requirement MS19, for “(Rev 02)” substitute “(Rev 03)”; and
d
In sub-paragraph (2) of requirement MS21, for “(Rev 02)” substitute “(Rev 03)”.
Certification of revised or substituted plans
7
1
The undertaker shall, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the plans referred to in this Order.
2
A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
3
In paragraph (1), the “undertaker” has the same meaning as in article 2(1) of the Order.
Signed on behalf of the Secretary of State for Business, Energy and Industrial Strategy
Gareth Leigh
Head of Energy Infrastructure Planning
Department for Business, Energy and Industrial Strategy
23rd March 2018
SCHEDULE
Approved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order
Article 5
HPC Permanent Development Site
Site Plans
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-SL-00-GA-002 03 HPC Site Parameter Plan 1:1000 A0 HINK-A1-SL-00-GA-010 03 Site Layout Plan (Operational) 1:2500 A1
Nuclear Island (Unit 1)
Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HR-01-GP-090 03 Roof Plan 1:200 A0 HINK-A2-HR-01-GE-001 03 South and West Elevations 1:200 A0 HINK-A2-HR-01-GE-002 03 North and East Elevations 1:200 A0 HINK-A2-HR-01-DT-001 02 Part Elevation Detail 1:50 A0
Radioactive Waste Storage / Radioactive Waste Process Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HQ-00-GA-001 01 Roof Plan and Elevations 1:200 A0 HINK-A2-HQ-00-DT-001 01 Part Elevation Detail 1:50 A0
Hot Laundry / Hot Workshop / Hot Warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HV-00-GP-020 03 Roof Plan 1:200 A1 HINK-A2-HV-00-GE-001 03 Elevations 1:200 A1 HINK-A2-HV-00-DT-001 03 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – A / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HD-01-GP-040 03 Roof Plan 1:200 A1 HINK-A2-HD-01-GE-001 03 Elevations 1:200 A1 HINK-A2-HD-01-DT-001 03 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – B / Cooling Water Discharge Weir Building / Battery Load Bank
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HD-02-GP-040 03 Roof Plan 1:200 A1 HINK-A2-HD-02-GE-001 03 Elevations 1:200 A1 HINK-A2-HD-02-DT-001 03 Part Elevation - Detail 1:50 A1
Service Access Building 1
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HGC-00-GA-001 02 Roof Plan & Elevations 1:100 A1
Nuclear Island (Unit 2)
Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HR-02-GP-090 03 Roof Plan 1:200 A0 HINK-A2-HR-02-GE-001 03 South and West Elevations 1:200 A0 HINK-A2-HR-02-GE-002 03 North and East Elevations 1:200 A0 HINK-A2-HR-02-DT-001 02 Part Elevation Detail 1:50 A0
Radioactive Waste Treatment Building / Battery Load Bank
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HQC-00-GP-040 02 Roof Plan 1:100 A1 HINK-A2-HQC-00-GE-001 02 Elevations 1:100 A1 HINK-A2-HQC-00-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – C / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HD-03-GP-040 03 Roof Plan 1:200 A1 HINK-A2-HD-03-GE-001 03 Elevations 1:200 A1 HINK-A2-HD-03-DT-001 03 Part Elevation Detail 1:50 A1
Emergency Diesel Generator – D / Cooling Water Discharge Weir Building/ Battery Load Bank
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HD-04-GP-040 03 Roof Plan 1:200 A1 HINK-A2-HD-04-GE-001 03 Elevations 1:200 A1 HINK-A2-HD-04-DT-001 03 Part Elevation Detail 1:50 A1
Service Access Building 4
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HGB-00-GA-001 02 Roof Plan & Elevations 1:100 A1
Conventional Island (Unit 1)
Unit 1: Turbine Hall
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-HM-01-GA-006 02 Roof Plan, North and South Elevations 1:200 A0 HINK-A1-HM-01-GE-001 02 West and East Elevations 1:200 A0 HINK-A1-HM-01-DT-001 01 Part Elevation Detail 1:50 A0
Unit 1: Sky Bridges
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-BR-01-GP-010 01 Roof Plan 1:100 A1 HINK-A1-BR-01-GE-001 01 North and South Elevations 1:100 A1 HINK-A1-BR-01-GE-002 01 East and West Elevations 1:100 A1 HINK-A1-BR-01-DT-001 01 Part Elevation Detail 1:50 A1
Unit 1: Non Classified Electrical Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HF-01-GP-030 02 Roof Plan 1:100 A1 HINK-A2-HF-01-GE-001 02 South Elevation 1:100 A1 HINK-A2-HF-01-GE-002 02 North and East Elevations 1:100 A1 HINK-A2-HF-01-DT-001 02 Part Elevation Detail 1:50 A1
Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HT-01-GP-003 02 Roof Plan 1:200 A1 HINK-A2-HT-01-GE-001 02 Elevations 1:200 A1 HINK-A2-HT-01-DT-001 02 Part Elevation - Detail 1:50 A1
Unit 1: Hydrazine Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-SIR-01-GA-001 01 Roof Plan and Elevations 1:100 A1
Conventional Island (Unit 2)
Unit 2: Turbine Hall
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-HM-02-GA-006 02 Roof Plan, North and South Elevations 1:200 A0 HINK-A1-HM-02-GE-001 02 West and East Elevations 1:200 A0 HINK-A1-HM-02-DT-001 01 Part Elevation Detail 1:50 A0
Unit 2: Sky Bridges
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-BR-02-GP-010 01 Roof Plan 1:100 A1 HINK-A1-BR-02-GE-001 01 North and South Elevations 1:100 A1 HINK-A1-BR-02-GE-002 01 East and West Elevations 1:100 A1 HINK-A1-BR-02-DT-001 01 Part Elevation Detail 1:50 A1
Unit 2: Non Classified Electrical Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HF-02-GP-030 02 Roof Plan (Lev 10.70m) 1:100 A1 HINK-A2-HF-02-GE-001 02 South Elevation 1:100 A1 HINK-A2-HF-02-GE-002 02 North and West Elevations 1:100 A1 HINK-A2-HF-02-DT-001 02 Part Elevation Detail 1:50 A1
Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HT-02-GP-003 02 Roof Plan 1:200 A1 HINK-A2-HT-02-GE-001 02 Elevations 1:200 A1 HINK-A2-HT-02-DT-001 02 Part Elevation - Detail 1:50 A1
Operations
Operational Service Centre
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-HB-00-GP-090 01 Roof Plan 1:200 A1 HINK-A1-HB-00-GE-001 01 North and South Elevations 1:200 A1 HINK-A1-HB-00-GE-002 01 East and West Elevations 1:200 A1 HINK-A1-HB-00-DT-001 01 Part Elevation Detail 1:50 A1
Cooling Water Pumphouse and Associated Buildings (Unit 1)
Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 5 & 7
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HP-01-GP-030 03 Roof Plan 1:200 A0 HINK-A2-HP-01-GE-001 03 Elevations 1:200 A0 HINK-A2-HP-01-DT-001 03 Part Elevation - Detail 1:50 A0
Unit 1: Fire-Fighting Water Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HOJ-01-GA-003 03 Roof Plan and Elevations 1:200 A1 HINK-A2-HOJ-01-DT-001 03 Part Elevation - Detail 1:50 A1
Discharge Shaft (Units 1 & 2)
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HCT-00-GA-001 01 Roof Plan & Elevations 1:100 A1
Cooling Water Pumphouse and Associated Buildings (Unit 2)
Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 6 & 8
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HP-02-GP-030 03 Roof Plan 1:200 A0 HINK-A2-HP-02-GE-001 03 Elevations 1:200 A0 HINK-A2-HP-02-DT-001 03 Part Elevation Detail 1:50 A0
Unit 2: Fire-Fighting Water Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HOJ-02-GA-003 03 Roof Plan and Elevations 1:200 A1 HINK-A2-HOJ-02-DT-001 03 Part Elevation Detail 1:50 A1
Remaining Balance of Plant and Other Plant (Unit 1)
Unit 1: Hydrogen Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HZH-01-GA-002 02 Roof Plan and Elevations 1:100 A1
Unit 1: Oxygen Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HZO-01-GA-002 01 Roof Plan and Elevations 1:100 A1
Remaining Balance of Plant and Other Plant (Unit 2)
Unit 2: Hydrogen Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HZH-02-GA-002 02 Roof Plan & Elevations 1:100 A1
Unit 2: Oxygen Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HZO-02-GA-002 01 Roof Plan and Elevations 1:100 A1
Remaining Balance of Plant and Other Plant (Shared Between both Units)
Demineralisation Station
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HY-00-GP-030 02 Roof Plan 1:100 A1 HINK-A2-HY-00-GE-001 02 North and South Elevations 1:100 A1 HINK-A2-HY-00-GE-002 02 East and West Elevations 1:100 A1 HINK-A2-HY-00-DT-001 02 Part Elevation Detail 1:50 A1
Auxiliary Boilers
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HVB-00-GA-004 01 Roof Plan 1:100 A1 HINK-A2-HVB-00-GE-001 01 Elevations 1:100 A1 HINK-A2-HVB-00-DT-001 01 Part Elevation Detail 1:50 A1
Chemical Products Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HZC-00-GA-001 01 Roof Plan and Elevations 1:100 A1 HINK-A2-HZC-00-DT-001 01 Part Elevation Detail 1:50 A1
Sewage Treatment Plant
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-STP-00-GA-001 01 Plans and Elevations 1:100 A1
Conventional Island Water Storage Tank – A
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-SER-01-GA-002 01 Roof Plan and East Elevation 1:200 A1
Conventional Island Water Storage Tank – B
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-SER-02-GA-002 01 Roof Plan and East Elevation 1:200 A1
Nuclear Island Water Storage Tank
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-SED-00-GA-002 01 Roof Plan and South and East Elevations 1:100 A1
Degassed Water Storage Tanks/ Valve Room
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-REA-00-GA-001 02 Plan and Elevations 1:200 A1
Fuel Waste and Storage
Interim Spent Fuel Store
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HHK-00-GP-000 01 Plan 1:200 A0 HINK-A2-HHK-00-GE-001 01 North and South Elevations 1:200 A0 HINK-A2-HHK-00-GE-002 01 East and West Elevations 1:200 A0
Access Control Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HUD-00-GA-001 01 Plans and Elevations 1:100 A1
Intermediate Level Waste Interim Storage Facility
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HHI-00-GA-002 01 Roof Plan and Elevations 1:200 A0 HINK-A2-HHI-00-DT-001 01 Part Elevation Detail 1:50 A0
Ancillary, Office and Storage
Main Access Control Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HU-00-GP-010 01 Roof Plan 1:100 A1 HINK-A2-HU-00-GE-001 01 Elevations 1:100 A1 HINK-A2-HU-00-DT-001 01 Part Elevation Detail 1:50 A1
Entry Relay Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-ERB-00-GA-002 01 Roof Plan and Elevations 1:100 A1 HINK-A2-ERB-00-DT-001 01 Part Elevation Detail 1:50 A1
Off-site Vehicle Search Area
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-VSA-00-GA-001 02 Roof Plan and Elevations 1:50 A1
Auxiliary Administration Centre
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HUC-00-GP-020 03 Roof Plan 1:100 A1 HINK-A2-HUC-00-GE-001 03 North and South Elevations 1:100 A1 HINK-A2-HUC-00-GE-002 03 East and West Elevations 1:100 A1 HINK-A2-HUC-00-DT-001 03 Part Elevation 1:50 A1
EDF Site Offices
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HAO-00-GE-001 02 Roof & Elevations 1:200 A1 HINK-A2-HAO-00-DT-001 02 Part Elevation Detail 1:50 A1
Garage for Handling Facilities
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HBG-00-GP-010 01 Roof Plan 1:100 A1 HINK-A2-HBG-00-GE-001 01 Elevations 1:100 A1 HINK-A2-HBG-00-DT-001 01 Part Elevation Detail 1:50 A1
Oil and Grease Storage and Oil Ancillary Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HOG-00-GA-002 01 Roof Plan 1:100 A1 HINK-A2-HOG-00-GE-001 01 North and South Elevations 1:100 A1 HINK-A2-HOG-00-GE-002 01 East and West Elevations 1:100 A1 HINK-A2-HOG-00-DT-001 01 Part Elevation Detail 1:50 A1
AREVA Warehouse
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HBW-00-GP-010 01 Roof Plan 1:200 A1 HINK-A2-HBW-00-GE-001 01 Elevations 1:200 A1 HINK-A2-HBW-00-DT-001 01 Part Elevation Detail 1:50 A1
Meteorological Station
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HSM-00-GA-002 01 Roof Plan and Elevations 1:50 A1
Outage Access Control Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-TU1-00-GA-002 01 Roof Plan and Elevations 1:100 A1 HINK-A2-TU1-00-DT-001 01 Part Elevation Detail 1:50 A1
Contaminated Tools Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HHC-01-GA-002 02 Roof Plan and Elevations 1:200 A1 HINK-A2-HHC-01-DT-001 02 Part Elevation Detail 1:50 A1
Conventional Waste Storage
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-CWS-00-GA-002 01 Roof Plan and Elevations 1:200 A1
Transit Area for Very Low Level Waste and Low Level Waste
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HHL-00-GE-001 01 Elevations 1:100 A1
Raw Water and Potable Water Supply
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HOR-00-GA-001 02 Roof Plan 1:100 A0 HINK-A2-HOR-00-GA-002 02 Elevations 1:100 A0 HINK-A2-HOR-00-DT-001 02 Part Elevation Detail 1:50 A1
Emergency Response Store
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HHE-00-GA-001 01 Roof Plan & Elevations 1:200 A1 HINK-A2-HHE-00-DT-001 01 Part Elevation Detail 1:50 A1
Services Ventilation Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HGM-00-GA-001 01 Roof Plan & Elevations 1:100 A1
Public and Training
Simulator Building / Training Centre
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-HBS-00-GP-020 01 Roof Plan 1:200 A1 HINK-A1-HBS-00-GE-001 01 Elevations 1:200 A1 HINK-A1-HBS-00-DT-001 01 Part Elevation Detail 1:50 A1
Public Information Centre
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-PIC-00-GP-040 01 Roof Plan 1:100 A1 HINK-A1-PIC-00-GE-001 01 North and West Elevations 1:100 A1 HINK-A1-PIC-00-GE-002 01 South and East Elevations 1:100 A1 HINK-A1-PIC-00-DT-001 01 Part Elevation Detail 1:50 A1
National Grid Substation
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-SS-00-GP-010 01 Roof Plan 1:200 A0 HINK-A2-SS-00-GE-001 01 Elevations 1:200 A0 HINK-A2-SS-00-DT-001 01 Part Elevation Detail 1:50 A0
Other Site Structures
Sea Wall (Incorporating Coastal Footpath)
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-HSW-00-GA-001 02 Plans 1:500 A0 HINK-A2-HSW-00-GA-002 01 North Elevation 1:50 A0 HINK-A2-HSW-00-GA-003 01 Detail Plans and Elevations 1:50 A0 HINK-A2-HSW-00-GA-004 02 Detail Plan and Elevation 1:100 A0
EDF Energy Pylons
Drawing number Rev Drawing title Scale >Paper size
HINK-A1-PL-00-GA-001 01 Location Plan, Plans, Elevations and Axonometric Various A1
Back Up Power Containerised Generator 1 - Near to the Main Access Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-LLY-00-GA-001 01 Plan and Elevations 1:100 A1
Back Up Power Containerised Generator 2 - Near to the Operational Service Building
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-LLV-00-GA-001 01 Plan and Elevations 1:100 A1
Back Up Power Containerised Generator 3 – Near to the Areva Warehouse
Drawing number Rev Drawing title Scale >Paper size
HINK-A2-LLW-00-GA-001 01 Plan and Elevations 1:100 A1
Highways Plans
Drawing number Rev Drawing title Scale >Paper size
HPC-GEN124-RI-RFC-DRW-000045 01 Northern Roundabout Proposed Layout 1:500 A1 HPC-GEN124-RI-RFC-DRW-000046 01 Vehicle Search Area Layby and Turning Head Proposed Layout 1:250 A1 HPC-GEN124-RI-RFC-DRW-000047 01 Southern Roundabout Proposed Layout During Operation 1:500 A1 HPC-GEN124-RI-RFC-DRW-000048 01 Southern Roundabout Proposed Layout During Construction 1:500 A1 HPC-GEN124-RI-RFC-DRW-000049 01 Emergency Access Road Junction with Existing Highway Proposed Layout 1:250 A1
Site Preparation Plans
Drawing number Rev Drawing title Scale >Paper size
HPCSPW002a Rev1 01 Site Layout Plan 1:3500 A1 HPCSPW002b 00 Beach Access Road Plan and Cross Sections 1:250 / 1:50 A1 HPCSPW004 Rev1 01 Planning Application Fencing Arrangement (Sheet 1 of 3) 1:3500 A1 HPCSPW005 Rev1 01 Fencing Enlarged Detail West (Sheet 2 of 3) 1:1500 A1 HPCSPW006 Rev1 01 Fencing Enlarged Detail East (Sheet 3 of 3) 1:1500 A1 HPCSPW007 Rev1 01 Indicative Earthworks Cut and Fill Arrangement 1:3500 A1 HPCSPW008 00 Early Works Water Management Zone 1:2500 A1 HPCSP009 Rev1 01 Surface Water Catchment Area Overall General Arrangement 1:3000 A1 HPCSPW010 00 Arrangement of Construction Drainage Outfall to Foreshore 1:75 A1 HPCSPW011 Rev1 01 Surface Water Drainage Holford Stream Culvert 1:1500 / 1:150 A1 HPCSPW012a 00 Deep Water Drainage Arrangement 1:2000 / 1:100 A1 HPCSPW012b 00 Deep Water Arrangement Spine Drain Sections A and B 1:200 A1 HPCSPW012c 00 Deep Water Assessment Spine Drain Sections C 1:200 A1 HPCSPW013b 00 Typical Cross Section Through Haul Road 1:50 A1 HPCSPW014 00 11kv Sub Station Plan and Elevations 1:100 A1 HPCSPW015 00 Raw Water Reservoir Plans and Sections 1:150 A1 HPCSPW016 Rev1 01 Surface Water Drainage in the Built Development Areas 1:1750 A1 HPCSPW017 00 Site Access Control Arrangement, Floor and Elevation 1:50 A1 HPCSPW019 Rev1 01 Landscape Proposal Plan 1:5000 A1 HPCSPW022 00 Proposed Sewage Treatment Plant – Plans and Sections 1:100 A1 HPCSPW023a 00 Existing and Reinstated Ground Level Cross Sections 1:2500 / 1:500 A1 HPCSPW023b 00 Earthworks Platforms Cross Sections 1:2500 / 1:500 A1 HPCSPW025a Rev2 02 Tree and Hedgerow Retention and Removal 1:4000 A1 HPCSPW025b Rev1 01 Proposed Advanced Planting, Plan 1:1000 A1 HPCSPW026 00 Primary and Secondary Access Tracks 1:3500 A1 HPCSPW027 00 NW Boundary Mitigation During Construction Cross Sections A and B 1:200 A1 HPCSPW028 00 NW Boundary Mitigation During Construction Cross Sections C and D 1:200 A1 HPCSPW029 00 NW Boundary Mitigation During Construction Planting Plan 1:750 A1
EXPLANATORY NOTE
(This note is not part of the Order)
This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 (“the 2013 Order”), a development consent order under the Planning Act 2008 (“the Act”), which has previously been amended by the Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013, the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2017.
This Order follows an application under paragraph 2 of Schedule 6 to the Act for a non-material change to allow an alteration to the alignment of the sea wall and the erection of additional pipework along the underside of the temporary jetty to enable discharges of water from the site. This Order also allows for the redesign and the change in size and location of a number of structures within the Hinkley Point C Permanent Development Site and amends the listed plans in Part 3 of Schedule 1 to the 2013 Order.
This Order, in article 7, provides for the certification of revised or substituted plans for use as evidence in any proceedings.
The changes to the 2013 Order take effect from the date specified in this Order.