    2017 No. 467 Infrastructure Planning The Triton Knoll Electrical System (Correction) Order 2017 Made 23rd March 2017 Coming into force 24th March 2017 The Triton Knoll Electrical System Order 2016 (“the Order”) , which granted development consent within the meaning of the Planning Act 2008 (“the Act”) , contains correctable errors within the meaning of the Act . Before the end of the relevant period, as defined in paragraph 1(6)(a) of Schedule 4 to the Act, the Secretary of State received a written request from the applicant for the correction of errors and omissions in the Order. In accordance with paragraph 1(7) of Schedule 4 to the Act, the Secretary of State has informed the relevant local planning authorities that the request has been received. The Secretary of State, in exercise of the powers conferred by section 119 of, and paragraphs 1(4) and (8) of Schedule 4, to the Act, makes the following Order: Citation and commencement 1 This Order may be cited as the Triton Knoll Electrical System (Correction) Order 2017 and comes into force on 24th March 2017. Corrections 2 1 The Triton Knoll Electrical System Order 2016 is corrected as set out in the table in the Schedule to this Order, where— a the first column sets out where the correction is to be made; b the second column sets out how the correction is to be made; and c the third column sets out the text to be substituted, inserted, or omitted. Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy Giles Scott Head of Energy Infrastructure Planning and Coal Liabilities Department for Business, Energy and Industrial Strategy 23rd March 2017 SCHEDULE Article 2 Table Where the correction is to be made How the correction is to be made Text to be substituted, inserted, or omitted Preamble For “RWE Innogy UK Ltd” substitute “Innogy Renewables UK Limited” Article 2(1), definition of “cable ducts” For “electrical cables” substitute “electrical circuits” Article 2 After paragraph (5) insert 6 In this Order— a all offshore coordinates are latitude and longitude degrees, minutes and seconds to three decimal places in WGS84 Datum; and b all onshore coordinates are Eastings and Northings in OSGB36 Datum, British National Grid Projection Article 35(1)(k) For “the outline code of construction practice (onshore) (rev. C)” substitute “the outline code of construction practice (onshore) (rev. B)” Schedule 1, Part 3, Requirement 5(10) After “within Work Nos.” omit “2,” Schedule 5, table for East Lindsey District, second column, first entry, paragraph (c) For “with consent for mole requests to be determined within 24 hours not including weekend or bank holiday hours” substitute “with consent for mole draining requests to be determined within 24 hours not including weekend or bank holiday hours” Schedule 5, table for Boston Borough, second column, first entry, paragraph (c) After “without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed” insert “, with consent for mole draining requests to be determined within 24 hours not including weekend or bank holiday hours,” EXPLANATORY NOTE (This note is not part of the Order) The Order corrects errors and omissions in the Triton Knoll Electrical System Order 2016, a development consent order made under the Planning Act 2008, following a request from the applicant under paragraph 1(5)(a) of Schedule 4 to that Act.

    Related guides, FAQ and contract templates