LEGALDIGMLEGALDIGM
    ← Australia
    Beta
    IPA design excluded-designs-extension-of-time

    IPA design excluded-designs-extension-of-time — IP Australia Designs Examiners' Manual – 11.3. Excluded designs: Extensions of time

    Beta. Legal information, not legal advice. LEGALDIGM is not a law firm. Check the official source for the current text.

    Analyze this law with AI
    Applicant’s may, technically, apply to extend the prescribed period under s 23(2) and reg 3.02. However, under s 23(1), there are express conditions that apply to an excluded design application. If it is no longer possible for all of the conditions under s 23(1) to be met, it would not be appropriate for the Registrar to grant an extension of time to extend the prescribed period under s 23(2). For example, if a design in the initial application has already been registered, the conditions of s 23(1) could no longer be met and the grant of an extension of time in relation to the prescribed period under s 23(2) would serve no purpose.

    Related guides, FAQ and contract templates